PTW Assessment Preparation
33

To carryout new flow line from well number 10 to the station which include multiple activity which are welding, grinding and shifting and lifting.
7- Activity No. Refer to PTW system
(1.2 - 1.4 - 1.6 - 6.4 - 6.14 - 11.1)
8- Area classification
The aera is hydrocarbon
9- Associate permit number
No association
10- Work Order / EWP Nob Sb- Planner agrees in frozen plan
Yes
12- Hazardous area classification
Zone 2
13- NORM contaminated area
No
14- Mercery potential
No
15- HS facility classification
It is critical sour
16- Expected max PPM
500 ppm
17- Vehicle entry required
No
2-Certificate attached to permit box

18- Certificate attached with permit
There are no certificates
3-Gas testing requirement box

19- Gas to be tested
(Hydrocarbon – HS – Oxygen – Other)
20- Gas test to be repeated at interval
No
21- Continuous gas monitoring required during execution of the work
No
3a-Work site examination box



34

22- Work site examination first day
No
23- Validate required everyday
Yes

5-Agreement by other effected custodian
24- There is other effected custodian
No

6a-

Production coordinator
25- The permit approved by Production coordinator
No











35

Scenario number 2