CagayanStateUniversit y carig campus tel. No. (078) 304 0818 college of engineering



Download 0.72 Mb.
Page4/10
Date01.03.2021
Size0.72 Mb.
#55956
1   2   3   4   5   6   7   8   9   10
Module 2
Module 1, Unit 1 Topic 1 Homework, Unit 1 Topic 1 Homework, Refresher Problems Module 4-5, Volumes-of-Solids-with-Known-Cross-Sections
Stretching the Tape. With the 30m or 50m mark held at the initial point, and the head tapeman aligned, the rear tapeman calls out “all right” or “ok”. The head tapeman takes his position just to the left (or right) of the line, kneels, and pulls the tape taut.



  1. Plumbing. When the ground is covered by obstacles, weeds, low brush, and irregularities in the ground surface, it will be difficult or impossible to lay the tape on the ground during measurement. Both ends of the tape should be held above ground (about the level of the waist or chest) and in a horizontal position. Also, each end of tape is marked by positioning a plumb line (defined by a plumb bob and string) held by both tapemen.




  1. Download 0.72 Mb.

    Share with your friends:
1   2   3   4   5   6   7   8   9   10




The database is protected by copyright ©ininet.org 2024
send message

    Main page