ccident History:
Rear-end
Struck Object
Run off the Road
Total
Angle
Head-on
Side-swipe
Injury
Fatal
Accident printouts are attached. It appears that only two of the accidents from 1995 to 1998 were preventable by signalization.
Adjacent Signalized Intersections:
There is a signal located at the intersection of SR ____ @ ______ Road 1500 feet west of the subject intersection. There is a signal located at the intersection of SR _____ @ _____ Road 2000 feet east of the subject intersection.
Traffic Engineering Report
State Route _________ and __________
Date _________
Page 3 of __
Warrant Analysis:
XXX County performed a warrant analysis on this intersection with no warrants being met. However, Warrant #5 may apply at this location. A traffic signal installed at this location could provide proper grouping of vehicles and could effectively regulate group speed. Warrant 5 states that “progressive movement control sometimes necessitates traffic signal installations at intersections where they would not otherwise be warranted.”
Recommendations:
It is recommended that a signal permit be issued to XXX County for the installation of a traffic signal at the intersection of SR000 @ City Street A. It is recommended that the County purchase all needed equipment for the installation. XXX County will install and maintain the signal. (if applicable).
RECOMMENDED BY: ___________________________ DATE: _________
District Traffic Engineer
RECOMMENDED BY: ___________________________ DATE: _________
State Traffic Safety and Design Engineer
APPROVED BY: _________________________________ DATE: _________
Director of Operations
Traffic Engineering Report
State Route _________ and __________
Date _________
Page 4 of __
Traffic Engineering Report Appendix
-
Sketch of the present intersection.
-
Sketch of the proposed intersection.
-
Traffic Signal Warrants Analysis - PC Warrants.
-
Traffic Count Summary Sheets.
APPENDIX V
DESIGNER’S MANUAL
FOR
HIGHWAY SYSTEMS
ADMINISTRATIVE REVIEW
Prepared: 11/22/01
Updated: 2/6/04
From: Office of Transportation Data
Systems and Classification Branch
Highway System Administrative Review
Table of Contents:
Document Acceptance
Page 1
Designer’s Review
Page 2 -- Overview
Case Examples
Page 4 -- Case I- Proposed New Alignments
Page 5 -- Case II- Temporary State Route Establishment for ROW Acquisition
Transmittal Letter/Outline
Page 6- Highway Systems Design Plans Transmittal
Letter
Page 7 - Highway Systems Adjustment Process
i
--Designer’s Review--
Highway systems verification needs to be accounted for during the Plan Development Process. There are two cases that require state highway system administrative action before a project can proceed:
Case I- Proposed New Alignments
The project scope will involve a roadway being constructed on new location or there is a horizontal realignment of an existing State Route.
Case II- Temporary State Route Establishment For
ROW Acquisition
The Department is participating in preconstruction activities apart from the existing State System thereby requiring the establishment of a temporary state route to facilitate the purchase of right-of-way.
Federal-aid Eligibility On Projects
Projects (other than Bridge and Safety) utilizing Surface Transportation Program (STP) funds must be functionally classified higher than a local road in urban areas and higher than a minor collector in rural areas. The functional classification of a road upon which STP-funds are being expensed can be viewed by accessing route information in the Road Characteristics File or by viewing the Highway Systems Status maps located on the Department’s external website: http://www.dot.state.ga.us/dot/plan-prog/transportation_data/function_class_maps/index.shtml. National Highway System (NHS) information can be obtained by going to http://www.fhwa.dot.gov/hep10/nhs/.
2
--EXAMPLES--
3
Case i – Proposed New Alignments