Examine valves for leaks, damage and corrosion.
Clean and examine gauges and readings for accuracy.
Examine controls and settings (60OC min). Clean strainer elements. Operate valves fully.
Check operation of shunt pumps.
Safety valves:
Examine / operate safety valve. Ensure valve re-seats correctly.
Pumps (Primary heating pumps):
Examine differential gauges (if fitted) for correct pump operation. Clean gauge glasses.
Examine duty pump for smooth running, for leaks, corrosion or damage to pump, housing, altitude gauges and associated pipework.
Examine flexible couplings.
Change over duty pump and make similar inspections, operate all valves fully and test for free travel.
Secondary domestic hot water pump: check for smooth running, for leaks, corrosion or damage to pump, housing and associated pipework.
If unvented domestic hot water system, check pressure in expansion vessels and re-pressure as required, check all associated pipework.
Sludge Test:
If no sludge or debris noticed on initial draining, stop draining, no further action required.
If sludge found, isolate, full drain down, re-fill and pasteurisation.
RECORD SHEET C – LEG48 MUST BE FILLED IN AND RETURNED TO THE AUTHORISED PERSON [WATER]
|