Document type


Petroleum Infrastructure Connected to the Facility



Download 0.73 Mb.
View original pdf
Page91/112
Date24.01.2022
Size0.73 Mb.
#58119
1   ...   87   88   89   90   91   92   93   94   ...   112
CER 13283 Safety Case Guidelines
7.3.5
Petroleum Infrastructure Connected to the Facility
The requirements of this section areas per section 4.3.5 of these Guidelines.
7.3.6
Persons
The requirements of this section areas per section 4.3.6 of these Guidelines. In addition, the Design Safety Case must show how the proposed manning arrangements have been derived such as to provide an adequate level of manning for safe operations.
7.3.7
Operations
The Design Safety Case must outline all designated petroleum activities and related petroleum infrastructure intended to be carried out pursuant to the Production Safety Permit. The intended operations relating to petroleum processing should be described in the Design Safety Case. Activities that are needed for the designated petroleum activity, such as marine operations and the ability to stay on station for an FPSO should be described and any weather limitations given.


53 The safety case should also contain a high-level description of all operations that will be required to service and maintain the petroleum infrastructure, which may include

Personnel transportation (helicopter, marine access

Personnel welfare (accommodation, medical, catering

Material logistics (supply boats, offloading, laydown, Facility loading and

Any diving operations from the petroleum infrastructure.

Download 0.73 Mb.

Share with your friends:
1   ...   87   88   89   90   91   92   93   94   ...   112




The database is protected by copyright ©ininet.org 2024
send message

    Main page