Fedramp system Security Plan (ssp) High Baseline Template



Download 1.2 Mb.
Page282/478
Date16.12.2020
Size1.2 Mb.
#54609
1   ...   278   279   280   281   282   283   284   285   ...   478
FedRAMP-SSP-High-Baseline-Template
FedRAMP-SSP-High-Baseline-Template, North Carolina Summary Table of Ecoregion Characteristics

Maintenance (MA)

MA-1 System Maintenance Policy and Procedures (H)


The organization:

  1. Develops, documents, and disseminates to [Assignment: organization-defined personnel or roles]:

  1. A system maintenance policy that addresses purpose, scope, roles, responsibilities, management commitment, coordination among organizational entities, and compliance; and

  2. Procedures to facilitate the implementation of the system maintenance policy and associated system maintenance controls; and

  1. Reviews and updates the current:

    1. System maintenance policy [FedRAMP Assignment: at least annually]; and

    2. System maintenance procedures [FedRAMP Assignment: at least annually or whenever a significant change occurs].



MA-1


Download 1.2 Mb.

Share with your friends:
1   ...   278   279   280   281   282   283   284   285   ...   478




The database is protected by copyright ©ininet.org 2024
send message

    Main page