Fedramp system Security Plan (ssp) High Baseline Template


PE-10 Emergency Shutoff (M) (H)



Download 1.2 Mb.
Page317/478
Date16.12.2020
Size1.2 Mb.
#54609
1   ...   313   314   315   316   317   318   319   320   ...   478
FedRAMP-SSP-High-Baseline-Template
FedRAMP-SSP-High-Baseline-Template, North Carolina Summary Table of Ecoregion Characteristics

PE-10 Emergency Shutoff (M) (H)


The organization:

  1. Provides the capability of shutting off power to the information system or individual system components in emergency situations;

  2. Places emergency shutoff switches or devices in [Assignment: organization-defined location by information system or system component] to facilitate safe and easy access for personnel; and

  3. Protects emergency power shutoff capability from unauthorized activation.



PE-10

Control Summary Information

Responsible Role:

Parameter PE-10(b):

Implementation Status (check all that apply):

Implemented

Partially implemented

☐ Planned

Alternative implementation

Not applicable



Control Origination (check all that apply):

Service Provider Corporate

☐ Service Provider System Specific

☐ Service Provider Hybrid (Corporate and System Specific)

☐ Configured by Customer (Customer System Specific)

☐ Provided by Customer (Customer System Specific)

☐ Shared (Service Provider and Customer Responsibility)

☐ Inherited from pre-existing FedRAMP Authorization for Click here to enter text. ,





PE-10 What is the solution and how is it implemented?

Part a




Part b




Part c






Download 1.2 Mb.

Share with your friends:
1   ...   313   314   315   316   317   318   319   320   ...   478




The database is protected by copyright ©ininet.org 2024
send message

    Main page