Open Systems Manager (Front Cover)



Download 0.88 Mb.
View original pdf
Page66/88
Date24.01.2022
Size0.88 Mb.
#58120
1   ...   62   63   64   65   66   67   68   69   ...   88
Open Systems Manager
Task
Frequency
Check the INOSM01 interface modules and module mounting unit for dust. Clean as necessary using an antistatic vacuum months
Check all signal, power and ground connections associated with the INOSM01 interface modules and termination units. See procedure.
Inspect the interface modules and termination units, giving particular attention to power supply contacts and edge connectors. Clean as necessary. See procedure months
Complete all tasks in this table.
Shutdown


MAINTENANCE
EQUIPMENT REQUIRED - 2
WBPEEUI350001B0
®
EQUIPMENT REQUIRED
This is a list of tools and equipment required for the maintenance procedures.

Antistatic vacuum.

Four-inch bladed screwdriver (suitable for termination unit terminals).

Isopropyl alcohol (99.5 percent electronic grade).

Eberhard Faber (A) pink pearl eraser.

Fiberglass burnishing brush.

Lint free cloths.

Small needle nose pliers.

Download 0.88 Mb.

Share with your friends:
1   ...   62   63   64   65   66   67   68   69   ...   88




The database is protected by copyright ©ininet.org 2024
send message

    Main page