INTRODUCTION
WBPEEUI350001B0 7 - 1
SECTION 7 - REPAIR AND REPLACEMENT PROCEDURESINTRODUCTIONThis section covers INOSM01 Open Systems Manager module replacement procedures.
NOTE: Always use the field static kit (part number when working with any module. This kit connects the static dissipa- tive work surface and technician to the same ground point.
EQUIPMENT REQUIREDTermination unit replacement is the only procedure requiring tools. The tools required are:
•
A screwdriver for termination unit mounting screws.
•
A screwdriver for terminal block screws on the NTCL01 termination unit (if using twisted pairs cable).
The INESM01 Ethernet Server Module must be properly shutdown before any component is removed from the system. Failure to shutdown the Ethernet server module can result in file corruption. Equipment required for shutdown is:
•
A VGA monitor.
•
A keyboard with a PS type six-pin mini DIN connector or an AT-PC compatible keyboard with adapter.
Table
7-1
lists
part numbers for the monitor,
keyboard and anAT-PC to PS type six-pin mini DIN adapter.
Share with your friends: