Optimizing Long-term Incentive Plans



Download 4.46 Mb.
Page22/36
Date26.11.2017
Size4.46 Mb.
#35094
1   ...   18   19   20   21   22   23   24   25   ...   36
Figure 27 Change in ranking of all companies, when the starting dates of the plan changes. Notice the average TSR values (red) and the average deviations of all companies. Every average deviation of a specific company has its own colour. The first graph is the optimized scenario and the lower graph is the normal situation.
[***Classified***]


Figure 28 Percentage that stays the same compared to the actual plan versus excess ranking. The upper figure is the normal situation and in the lower all companies were optimized.






Download 4.46 Mb.

Share with your friends:
1   ...   18   19   20   21   22   23   24   25   ...   36




The database is protected by copyright ©ininet.org 2024
send message

    Main page