Nat doc 001 Guidance and Information Material Concerning



Download 0.84 Mb.
View original pdf
Page12/103
Date22.11.2021
Size0.84 Mb.
#57747
1   ...   8   9   10   11   12   13   14   15   ...   103
icao nat doc 001 air navigation north atlantic
APPENDIX BB
DESCRIPTION OF THE MONITORING METHOD USED BY CANADA..........................................................................B-1
APPENDIX CC
TYPES OF FORMS AND CORRESPONDENCE TO BE USED IN REPORTS AND FOLLOWUP ACTION ON OBSERVED AND REPORTED DEVIATIONS..............................................................C-1 REPORT FOR THE INITIAL NOTIFICATION TO AN OPERATOR AND THE CMA OF AN OBSERVED DEVIATION OF 25 NM OR MORE C LETTER TO AN OPERATOR REQUESTING AN INVESTIGATION INTO A GROSS NAVIGATION ERROR C SAMPLE OF ERROR INVESTIGATION FORM C COVERING LETTER TO STATE OF REGISTRY C COVERING LETTER TO STATE OF REGISTRY C LETTER IN RESPECT OF A DEVIATION > 50 NM OUTSIDE MNPS AIRSPACE C LETTER TO A STATE OF REGISTRY IN RESPECT OF A DEVIATION >25 NM BUT <50 NM OUTSIDE MNPS AIRSPACE ................................................................................................................C-9
REPORT TO THE CMA OF AN EROSION OF LONGITUDINAL SEPARATION IN EXCESS OF 3 MINUTES ..........C-10
REPORT TO THE CMA OF A SIGNIFICANT DIFFERENCE BETWEEN ATA AND ETA.............................................C-11
REPORT TO THE CMA OF ATC INTERVENTION TO PREVENT A GROSS NAVIGATION ERROR ........................C-12
REPORT TO THE CMA OF AN ALTITUDE DEVIATION OF 300 FT OR MORE, INCLUDING THOSE DUE TO
TCAS, TURBULENCE AND CONTINGENCY EVENTS .........................................................................................C-13
REPORT TO THE CMA REGARDING A NON-RVSM COMPLIANT RESERVATION APPROVAL............................C-14
REPORT TO THE CMA ON THE TACTICAL MONITORING OF MNPS/RVSM APPROVAL STATUS ......................C-15
LETTERS USED BY THE CMA IN COMMUNICATIONS WITH STATES .....................................................................C-16
CMA QUARTERLY REPORT CLASSIFICATION OF ERRORS AND WEIGHTING FACTORS USED........................C-19
NOTES TO AID COMPLETION OF CMA FORMS F1, F2 AND F3 ..................................................................................C-20
POINT OF CONTACT DETAILS/CHANGE OF POINT OF CONTACT DETAILS FOR MATTERS
RELATING TO RVSM APPROVALS ........................................................................................................................C-21
WITHDRAWAL OF APPROVAL TO OPERATE IN NORTH ATLANTIC RVSM AIRSPACE .......................................C-23

Download 0.84 Mb.

Share with your friends:
1   ...   8   9   10   11   12   13   14   15   ...   103




The database is protected by copyright ©ininet.org 2024
send message

    Main page