SCE Management through the Asset life cycle During an Asset’s life, the integrity is established by the project team and safeguarded by the operating team. The points at which key deliverables in the SCE Management process are completed are shown against each phase of the Asset life cycle in Figure 3. EP 2009-9009 Restricted 9 Introduction Figure 3: SCE Management process in Asset life cycle Identify and Assess Select Define Execute Operate Formulate and evaluate development options Review development options Initial operations assessment Formulate and evaluate concept Initial HEMP analysis for each option (HAZID) Review proposed concept - demonstrate ALARP Operations philosophy development Front End Engineering Design (FEED) HEMP analyses for FEED - bow-ties SCE group determination Operation envelope definition Design performance standards Design safety case Basis for design Detailed Facilities design Refined HEMP analyses with specific bow-ties SCE identification in Asset register and loading into CMMS Refined design performance standards and assurance measures Operate phase performance standards and assurance measures Maintenance routines including frequency loaded into CMMS Operations safety case Construct Facilities and execute OR&A plan Commission and handover to Asset owner Manage SCE performance assurance tasks and measures Deviation control SCE Status and KPI reporting Management of Change process VAR 2 VAR 3 VAR 4 PSUA