Open Systems Manager
TROUBLESHOOTING
GENERAL TROUBLESHOOTING - 2
WBPEEUI350001B0
®
If the INOSM01 Open Systems Manager will not startup. Check cabinet power. Verify that power is available to the
INOSM01 manager modules and termination units.
a. Check the 24 VDC power and common connection to
E1 and Eon the NTSM01 termination unit.
b. Verify that the NTSM01 fuse is good.
c.
Check the 24 VDC power and common connection to
E1 and Eon the NTCL01 termination unit.
d. Verify that the NTCL01 fuse is good. Check the NTSM01 termination unit installation.
a. Check the jumper settings on the NTSM01 termination unit and verify that they are set correctly for the Ethernet cable being used. Refer to Table
3-1
for NTSM01 jumper settings.
b. Check the Ethernet cable connection to the NTSM01
termination unit.
c.
Check the termination unit cable connection to the
NTSM01 termination unit and to the module mounting unit backplane. Refer to Figure
3-4
fora diagram of all
INOSM01 cable connections. Check the NTCL01 termination unit installation.
a. Check the jumper settings on the NTCL01 termination unit and verify that they are set correctly for the application. Refer to the Communication Termination Unit
(NTCL01) instruction for jumper settings.
b. Check the INFI-NET communication loop cable connection to the NTCL01 termination unit.
c.
Check the termination unit cable connection to the
NTCL01 termination unit and to the module mounting unit backplane (Figure
3-4
).
4. Check the INESM01 module installation.
a. Verify that the SCSI, video and Ethernet adapter boards are installed and properly seated on the INESM01
module.
b. Use an ohmmeter to verify that the SCSI adapter board fuse is good. If the fuse is open, call service to replace the fuse.


TROUBLESHOOTING
GENERAL TROUBLESHOOTING
WBPEEUI350001B0 5 - 3
c.
Verify that the adapter board jumpers are set correctly.
Refer to Table
3-3
for adapter board jumper settings.
d. Verify that the INESM01 jumpers are set correctly.
Refer to Table
3-2
for INESM01 jumper settings.
e.
Check the ribbon cable connections from the INDDM01
module to the INESM01 module. There should be two cable connections from the INDDM01 module to the INESM01
module: one from the hard disk drive and one from the floppy disk drive (Figure
3-4
).
f.
Check the ribbon cable connection from the INSCS01
module to the SCSI adapter board on the INESM01 mod- ule.
g. Check the ribbon cable connection from the faceplate of the INSCS01 module to the faceplate of the IMMPI01
module.
5. Check the IMMPI01 and INICT03 modules installation.
a. Check the ribbon cable connection from the IMMPI01
module to the INICT03 module.
b. Check the NTMP01 termination unit installation and cable connection to the IMMPI01 module.
c.
Verify that the security key on the NTMP01 termination unit is correctly installed. Refer to the appropriate application programming interface user manual for information on the security key.
d. Verify that the INICT03 dipswitches, jumpers and dip- shunt are set correctly. e.
Check the module mounting unit setup of the I/O
expander bus for the INICI03 interface (refer to the INICI03
instruction for information on isolating the IO expander bus. If the INOSM01 manager installation checks out, use the
Ethernet diagnostic utilities to examine the Ethernet server database and status (refer to the INFI-NET Ethernet Server