SAES-B-018
Document History
13 February 2020 Major revision that resulted in refereeing to SAES-L-132 for pipe material requirements in lieu of specifying galvanized carbon steel, complying with
NFPA foam system design methodology, updating and grouping testing requirement.
3 July 2019 Editorial revision, to reflect content confirmation requirement.
23 April 2017 Revised the foam riser location with reference to the main inlet/outlet piping connections to the tank and added a commentary to clarify use of a single foam skid for multiple users.
17 May 2011 Revised the "Next Planned Update" Reaffirmed the contents of the document, and reissued with minor revision.