33 To carryout new flow line from well number 10 to the station which include multiple activity which are welding, grinding and shifting and lifting. 7- Activity No. Refer to PTW system (1.2 - 1.4 - 1.6 - 6.4 - 6.14 - 11.1) 8- Area classification The aera is hydrocarbon 9- Associate permit number No association 10- Work Order / EWP Nob Sb- Planner agrees in frozen plan Yes 12- Hazardous area classification Zone 2 13- NORM contaminated area No 14- Mercery potential No 15- HS facility classification It is critical sour 16- Expected max PPM 500 ppm 17- Vehicle entry required No 2-Certificate attached to permit box 18- Certificate attached with permit There are no certificates 3-Gas testing requirement box 19- Gas to be tested (Hydrocarbon – HS – Oxygen – Other) 20- Gas test to be repeated at interval No 21- Continuous gas monitoring required during execution of the work No 3a-Work site examination box
34 22- Work site examination first day No 23- Validate required everyday Yes 5-Agreement by other effected custodian 24- There is other effected custodian No 6a- Production coordinator 25- The permit approved by Production coordinator No