Ac 20-153a acceptance of Aeronautical Data Processes and Associated Databases



Download 193.11 Kb.
View original pdf
Page33/33
Date27.11.2023
Size193.11 Kb.
#62732
1   ...   25   26   27   28   29   30   31   32   33
AC 20-153A
AC 20-181 - Airworthiness Approval of AHRS
QM periodic reviews
11-27 Plans and procedures shall be reviewed periodically.
RTCA/DO-
200A
2.5.3.2 11-28 Records of skill for personnel shall be reviewed periodically to confirm personnel have required skills.
RTCA/DO-
200A
2.5.3.2 11-29 Tools shall be reviewed periodically to confirm ability of tool to meet DQRs.
RTCA/DO-
200A
2.5.3.2 11-30 The accreditation of suppliers (to the
RTCA/DO-200A standard) shall periodically be confirmed.
RTCA/DO-
200A
2.5.3.2 11-31 All records of detected data errors shall be reviewed periodically. Any actions shall be recorded.
RTCA/DO-
200A
2.5.3.2 11-32 All periodic reviews shall include a review of all problems reported. Any deficiencies or limitations shall be assessed and corrective action taken if necessary to meet DQRs.
RTCA/DO-
200A
2.5.3.2



09/20/10 AC 20-153A
Appendix Ab Objective


Reference
Verification
Method
(e.g., Inspection, Observation)

Applicant’s
Reference
Document or ID
Config.
Control on
Reference
Document
Objective
Met
Yes, No or Pending
Notes
Numerical reference
QM records and management reviews
11-33 Retention of records shall be established and recorded.
RTCA/DO-
200A
2.5.4 Item 1 11-34 Records shall be legible.
RTCA/DO-
200A 2.5.4 Item 2 11-35 Records shall be retrievable.
RTCA/DO-
200A 2.5.4 Item 3 11-36 Management reviews shall confirm that data plans and procedures will meet required data quality and will evaluate the need for corrective/preventive action.
RTCA/DO-
200A
2.5.5 11-37 Results of the management reviews shall be recorded.
RTCA/DO-
200A
2.5.5

Download 193.11 Kb.

Share with your friends:
1   ...   25   26   27   28   29   30   31   32   33




The database is protected by copyright ©ininet.org 2024
send message

    Main page