Must Use
|
QTY01
|
673
|
Quantity Qualifier
|
M
|
ID 2/2
|
|
Code specifying the type of quantity
|
|
17
|
|
Incomplete Quantity Delivered
|
|
Used when multi-metered account rolled up and at least one of the meters is not available.
|
|
19
|
|
Incomplete Quantity Received (Net Metering)
|
|
Used when multi-metered account rolled up, at least one of the meters is not available and the total is net generation.
|
|
20
|
|
Unavailable
|
|
Used when meter data is not available to fill the intervals.
|
|
87
|
|
Actual Quantity Received (Net Metering)
|
|
Used when the net generation quantity received is actual.
|
|
96
|
|
Non-Billable Quantity
|
|
Indicates this quantity and interval are outside of the actual bill period
|
|
9H
|
|
Estimated Quantity Received (Net Metering)
|
|
Used when the net generation quantity received is estimated.
|
|
KA
|
|
Estimated Quantity Delivered
|
|
Used when the quantity delivered is an estimated quantity.
|
|
QD
|
|
Actual Quantity Delivered
|
|
Used when the quantity delivered is an actual quantity.
|
Must Use
|
QTY02
|
380
|
Quantity
|
X
|
R 1/15
|
|
Numeric value of quantity
|
Must Use
|
QTY03
|
355
|
Unit or Basis for Measurement Code
|
M
|
ID 2/2
|
|
Code specifying the units in which a value is being expressed, or manner in which a measurement has been taken
|
|
K1
|
|
Kilowatt Demand (kW)
|
|
Represents potential power load measured at predetermined intervals
|
|
K2
|
|
Kilovolt Amperes Reactive Demand (kVAR)
|
|
Reactive power that must be supplied for specific types of customer’s equipment; billable when kilowatt demand usage meets or exceeds a defined parameter
|
|
K3
|
|
Kilovolt Amperes Reactive Hour (kVARH)
|
|
Represents actual electricity equivalent to kilowatt hours; billable when usage meets or exceeds defined parameters
|
|
K4
|
|
Kilovolt Amperes (KVA)
|
|
KH
|
|
Kilowatt Hour (kWh)
|