SPECIAL PROVISIONS
INDEX

Table of Contents


PART II, SECTION 2 - SPECIAL PROVISIONS 72

1. PRICING 72

2. PAYMENT TERMS 72

3. BILLING AND PAYMENT 72

4. POINT OF CONTACT 72

5. F.O.B. DESTINATION 73

6. MILESTONES/SUBMITTALS 73

7. MOST FAVORED CUSTOMER 74

8. CONDITIONS AFFECTING THE WORK 74

9. WARRANTY 74

10. INDEMNITY 74

11. INSURANCE 75

12. LAWS AND REGULATIONS 79

13. FEDERAL/LOCAL/STATE SALES TAX 79

14. PRIME CONTRACTOR DBE RESPONSIBILITIES 79

15. CONTRACTING OFFICER=S TECHNICAL REPRESENTATIVE (COTR) 79

16. HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA 80

17. SPECIAL DELIVERY INSTRUCTIONS 82

18. PACKAGING AND MARKING 82

19. INSPECTION, TESTING AND ACCEPTANCE 82

20. AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR 83

21. GOVERNING LAW 83

22. ORGANIZATIONAL CONFLICT OF INTEREST 83

23. SPARE PARTS FOR WMATA INVENTORY 83

24. FIRST ARTICLE TESTING 84

25. RIGHTS IN TECHNICAL DATA - UNLIMITED 84

26. QUALITY ASSURANCE/QUALITY CONTROL 87

27. GARNISHMENT OF PAYMENTS 87

28. LIVING WAGE 87

29. PRE-EMPLOYMENT CRIMINAL BACKGROUND CHECK REQUIREMENT 89

30. CONTRACTOR PERSONNEL 89

31. CONTRACTOR’S RIGHT OF WAY TRAINING 90

32. CONTRACTOR'S VALUE IMPROVEMENT PROPOSALS 90

33. SAFETY / ENVIRONMENTAL REQUIREMENTS 90

A.Suction side hydraulic shut off valves shall be incorporated. 129

B.Baffles to separate intake and return lines to facilitate the separation of air and foreign matter from the hydraulic fluid, separate pump inlet from the settling portion of the tank, and shall direct flow toward tank walls for maximum heat dissipation. 129

Constructed with 6-spiral plies of steel reinforcement. 131

Flexed to less than their rated minimum bend radius. 131

Installed or routed to expose them to temperatures above or below their rated operating temperature ranges. 131

Subjected to any twisting, pulling, kinking, crushing, or abrasion. 131

Routed in a manner which would expose the hose to damage under normal conditions. 131

KEY SWITCHES: 137

Tow Capacity Verification 148

End Special Provisions Index



PART II, SECTION 2 - SPECIAL PROVISIONS



1. PRICING

Prices on the Schedule Form submitted must include all associated costs, including but not limited to, travel, markups, overhead, and profit.



2. PAYMENT TERMS

a. Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the award, and will be taken if payment is made within the discount period indicated in the offer by the offeror.


b. Partial payments are authorized.

3. BILLING AND PAYMENT

a. Payment will be made on a monthly basis of properly completed invoices. An original and one copy of all invoices are to be mailed to the Contracting Officer=s Technical Representative (COTR).


b. Invoices shall contain the following information: date, contract and order number (if any), item numbers, description of supplies or services, sizes, quantities, unit prices, and extended totals. Final invoices must clearly be marked "FINAL" and cite the amount of the contract, amount previously paid, and the balance due.

4. POINT OF CONTACT

All inquiries are to be directed to:


Washington Metropolitan Area Transit Authority

Attn: Ms. Debbie Loftin, Contract Administrator

Room 6C05

600 Fifth Street, NW

Washington, DC 20001

Phone: (202) 962-2071

FAX: (202) 962-2038

E-Mail: dloftin@wmata.com



5. F.O.B. DESTINATION

a. The term "f.o.b. destination," as used in this clause, means:


1. Free of expense to WMATA on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
2. Supplies shall be delivered to the destination consignee's warehouse unloading platform, or receiving dock, at the expense of the Contractor. WMATA shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of WMATA acting in its contractual capacity. If the Contractor uses rail carrier or freight forwarder for less than carload shipments, the Contractor shall assure that the carrier will furnish tailgate delivery if transfer to truck is required to complete delivery to consignee.
b. The Contractor shall:
1. Pack and mark the shipment to comply with contract specification;
2. In the absence of specifications, prepare the shipment in conformance with carrier requirements;
3. Prepare and distribute commercial bills of lading;
4. Deliver the shipment in good order and condition to the point of delivery specified in the contract;
5. Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
6. Furnish a delivery schedule and designate the mode of delivering carrier; and
7. Pay and bear all charges to the specified point of delivery.

6. MILESTONES/SUBMITTALS

a. A milestone plan is due 30 days after award showing all phases of the contract with beginning and completion dates. Further, all reports to include draft reports will be shown as a milestone. Training milestones will include dates for the training manuals. All submittals are to be included in the milestones as well on-site inspections and meetings.


b. Submittals are identified in the Scope of Work/Specifications.