Seminar: Dod decision Support Systems Like Share Report 506 Views Download Presentation



Download 87.79 Kb.
Page13/91
Date18.03.2022
Size87.79 Kb.
#58458
1   ...   9   10   11   12   13   14   15   16   ...   91
DAU-DoD Decision Support Systems(PPT
Senior IAMD Systems Engineer, DoDAF资料全收集
Technology Maturation and Risk Reduction Phase • Guided by: ICD, AS, Draft CDD and SEP CDD Validation Development RFP Release • Purpose: • Reduce Technology, Engineering, Integration, and Life Cycle Cost Risks, • Demonstrate Critical Technologies on Prototypes • Complete Preliminary Design draft CDD Technology Maturation & Risk Reduction CDD Source Selection PDR Contract award TRA A B • Basis for Entry: MDA approved materiel solution and AS • Major Activities: Competitive prototyping; Preliminary Design Review (PDR); CDD Validation; Plan for sustainment; Dev RFP Release; Technology Readiness Assessment (TRA) • Phase is Complete When: Affordable increment of military-useful capability identified; technology demonstrated in relevant environment; manufacturing risks identified; PDR conductedprior to MS B (unless waived by the MDA) * * • Competitive prototyping of the system, or critical sub-systems is a statutory requirement for MDAPs and a regulatory requirement for all other programs


  1. Download 87.79 Kb.

    Share with your friends:
1   ...   9   10   11   12   13   14   15   16   ...   91




The database is protected by copyright ©ininet.org 2024
send message

    Main page