Enclosure 3: System Engineering (Continued) • New Content (Excerpts) • Manufacturing and Producibility: Risks identified and managed throughout the life-cycle • Documented in the SEP during the MSA Phase • Assessed and demonstrated in the TMRR Phase • Critical processes assessed as affordable and executable during the EMD Phase • Prior to Production – ensure risks are acceptable, supplier qualification is complete, processes under statistical process control (SPC) • Reliability and Maintainability (R&M): An integral part of the SE process • Reliability Growth Curves: • In the SEP at MS A and updated in the TEMP starting at MS B • Stated in a series of goals and tracked through T&E until the reliability threshold has been achieved • Growth status at DAES reviews 40