Seminar: Dod decision Support Systems Like Share Report 506 Views Download Presentation



Download 87.79 Kb.
Page52/91
Date18.03.2022
Size87.79 Kb.
#58458
1   ...   48   49   50   51   52   53   54   55   ...   91
DAU-DoD Decision Support Systems(PPT
Senior IAMD Systems Engineer, DoDAF资料全收集
Mandatory KPPs/KSAs Sustainment KPP: Required for all ACAT I programs. Intent is to ensure that sustainment planning “upfront” enables the requirements and acquisition communities to provide a system with optimal availability and reliability to the warfighter at an affordable cost. Consists of three elements a) Availability KPP (Two Components) Materiel Availability. Measure of the total inventory of a system operationally capable(ready for tasking) of performing an assigned mission at a given time, based on materiel condition. Operational Availability. Measure of time that a system or group of systems within a unit are operationally capableof performing an assigned mission and can be expressed as uptime/(uptime + downtime). b) Reliability KSA: Measure of probability that system will perform without failure over a specified interval. RM responsibility. c) Operation and Support (O&S) Cost KSA: Mandatory – unit operations, energy (POL, fuel – fully burdened cost, maintenance, sustaining support). PM responsibility.


  1. Download 87.79 Kb.

    Share with your friends:
1   ...   48   49   50   51   52   53   54   55   ...   91




The database is protected by copyright ©ininet.org 2024
send message

    Main page