Statement of Qualifications



Download 148.49 Kb.
Date14.08.2017
Size148.49 Kb.
#31889


ad-test
c:\users\barry.atldemo\appdata\local\microsoft\windows\temporary internet files\content.outlook\pn6jly1s\mor_3397.jpg

description: 2.2 down_crop4.jpg

c:\users\barry.atldemo\appdata\local\microsoft\windows\temporary internet files\content.outlook\pn6jly1s\nahs excavator on the roof.jpg

Statement

of

Qualifications


Prepared By:

atlanta demolition


5595 Peachtree Road

Chamblee, Georgia 30341

Office: (404) 816-2232

Fax: (770) 454-6673

Contact: Mr. Barry Roberts

barryroberts@atlantademolition.com

Mobile: (404) 697-3409

www.atlantademolition.com



Introduction

Atlanta Demolition is a unique provider of large-scale commercial and municipal demolition, facilities decommissioning, site development, and environmental site remediation and abatement services. Our highly skilled staff and specialized equipment deliver safe and cost-effective solutions for all structural demolition, site development and remediation needs. Our management team’s background has over 40 years’ experience in commercial demolition, construction, site development remediation, and environmental law.
Atlanta Demolition has become a market leader in safely and successfully demolishing, abating, recycling and grading a wide range of structures including high-rises, large shopping malls, office and apartment complexes, multi-building mixed-use complexes, industrial manufacturing facilities, and subsurface piping and pump complexes. We pride ourselves in meeting all the needs of our clients in a timely, flexible and professional manner. Our goal is to meet or exceed all scheduling and cost performance goals while ensuring strict compliance with all applicable health and safety regulations.

Government Contracting

Atlanta Demolition has executed numerous government contracts, working as a prime as well as a subcontractor for local governments and federal agencies. Classified as a Small Business in all categories and as an Emerging Small Business in some, Atlanta Demolition is fully adept at performing with full federal, state and local compliance and reporting. Registered with the SAM System for Awards Management (formerly the Central Contractor Registry / CCR and the Federal Online Representations and Certifications Registry / ORCA) as well as with the Small Business Association / SBA, Atlanta Demolition’s Cage Code is 615M4 and the company is registered to bid projects within the following NAICS Codes:

235940

Wrecking and Demolition Contractors

236220

Commercial and Institutional Building Construction

237110

Water and Sewer Line and Related Structures Construction

238110

Poured Concrete Foundation and Structure Contractors

238910

Site Preparation Contractors

238990

All Other Specialty Trade Contractors

423390

Other Construction Material Merchant Wholesalers

423930

Recyclable Material Merchant Wholesalers

562219

Other Nonhazardous Waste Treatment and Disposal

562910

Remediation Services

562920

Materials Recovery Facilities

562998

All Other Miscellaneous Waste Management Services

624230

Emergency and Other Relief Services


Services Provided

Structural Demolition and Equipment DismantlingAtlanta Demolition provides a complete range of demolition services from small-scale residential and commercial demolition to complex structural demolition and the dismantling of industrial equipment. We design and perform all our services to meet the time and cost needs of our clients while complying within all OSHA Health and Safety Regulations. Similarly, we pride ourselves in taking advantage of all opportunities in material recycling while maintaining minimal impacts to the job-site, the environment, and ongoing operations surrounding the job-site area.

Environmental Remediation and Abatement – Atlanta Demolition self performs all aspects of remediation encountered on large industrial and commercial demolition projects. Our experience includes, but is not limited to, removal of PCB contaminated soils and structural elements, characterization, removal and management of chemical and heavy metal contaminated soils, and abatement of asbestos. The environmental background of our experienced management team affords us the capability to perform the remediation and abatement aspects of large commercial and municipal demolition projects. Our goal is to provide the seamless coordination of abatement and demolition activities for all of our clients.

Site Development and Utilities – As part of our effort to provide our clients with a “hands-free” yet, turnkey solution to their site transitioning and transformation needs, Atlanta Demolition is a licensed underground utility contractor and has the ability to use its fleet of company-owned equipment to provide earth moving, pipe installation and attendant site preparation services for its clients.sorting_rebar.jpg

Material RecyclingAtlanta Demolition is an industry leader in the ability to identify and professionally perform recycling of concrete, aggregates, metals and other reusable building materials for reintroduction to the project site or for resale. On certain projects with high amounts of recyclable materials, we have been able to reach recycling goals as high as 95% of the demolished structure.

Additional Capabilities – As an added service, our clients can receive the benefit of the senior management’s background and expertise in construction management and environmental law. This experience has proven invaluable to our clients in circumstances where regulatory and environmental issues arise that may have not been originally anticipated in the project’s specifications or cost models.

Health and Safety

At Atlanta Demolition, we strongly believe that the safety of our staff, subcontractors, clients and site surroundings is our most important goal. We promote an accident-free workplace and “safety first” philosophy through utilizing our On-Site Health and Safety Plan manual and enforcing our comprehensive health and safety policies and practices. We hold all our staff accountable for this program and require participation at all levels. Our health and safety program is designed in accordance with the National Demolition Association and OSHA. Occupational health and safety for all on-site personnel and safety to the environment are always one of the most important aspects of the success of any project.


Representative Client Projects and Reference Listings


  1. Georgia Power Company / Plant Bowen – Asset recover and demolition of multiple buildings at Georgia Power’s Plant Bowen, including five outlying buildings, a two-story main service building and its three-story connector to the main plant. Project Schedule – 60 days; Customer Contact – Greg Schuchmann – (770) 606-6887 ghschuch@southernco.com; Contract Value - $566,628; Euharlee, GA March – May 2013.




  1. Power Plants 401-1 & 401-2 / Indiana Army Munitions Arsenal / River Ridge Development AuthorityDecommissioning, asset recovery, abatement and demolition of two 1940’s era coal burning power plants including the removal of eleven 225 foot smokestacks. The two 11-Story plants contained eleven 95 foot standing boilers and eleven generating units inside the borders of the Indiana Armory. Project Schedule 270 days; Customer Contact – Tom Vittitow – (812) 285-8979 tom@riverridgecc.com; Project Value: $7,000,000; Jeffersonville, IN; 2011 – 2012.



  1. The Southern Company / Georgia Power Company – Asset recovery, abatement and demolition of equipment storage and repair facilities at Plant Bowen. Project Schedule – 90 days; Customer Contact – Greg Schuchmann – (770) 606-6887 ghschuch@southernco.com; Contract Value - $484,000; Euharlee, GA August – December 2013.




  1. Former IBM Complex / Atlanta Public Schools – Abatement and demolition in preparation for the New North Atlanta High School; including separating 9 levels of connecting sky bridges and the implosion of one 500,000 square foot structure (eleven stories) while abating and performing significant interior demolition on the other; Project Schedule – 180 days; Contract value - $5,813,000; Customer Contact – Danny Gutlay, APS Project Manager (404 802-3721; dgutlay@atlanta.k12.ga.us; June – December 2012lightened 8 eighth fire more collapse.jpg




  1. Daehan Solution Georgia / Integra Construction – Emergency mobilization to recover critical assets after catastrophic fire destroyed 800,000 s/f auto parts manufacturing facility; Accelerated Demolition Project Schedule of 24 hours per day for 22 days; Contract Value $1,187,635; Customer Contact – Brad Hornor (678) 702-5901 b.hornor@integraconstruction.com; West Point, GA; March – April 2012.

  2. Roosevelt House / Atlanta Housing Authority / The Integral Group – Interior and Exterior Abatement and Demolition by Implosion of nineteen-story high rise apartment building; Project Schedule 180 days; Contract Value $1,927,000; Customer Contact – Channing Henderson (404) 526-1887 chenderson@integral-online.com; Atlanta, GA; 2010 – 2011. 2.2 down_crop4.jpg



  1. Jamestown Ponce City Market / Gay Construction / Southern Site Development – Interior demolition of approximately 114,000 s/f of the main building under renovation after completion of the related projects described in numbers 13 & 15 below; Project Schedule – 90 days; Contract value - $900,000; Customer Contact – Joe Thompson (404) 597-6106 jthompson@gayconstruction.com; Atlanta, GA; July – September 2013.




  1. Neely Nuclear Research Center / Georgia Institute of Technology / Manhattan Construction Company Demolition, remediation, and asbestos abatement of nuclear reactor facility, including demolition of research laboratories, reactor structure and hot cell area; Project Schedule 120 days; Project Cost – confidential; Customer Contact – Manhattan Construction Company, Don Pickelsimer (404) 351-0007 Don.Pickelsimer@manhattanconstruction.com; Atlanta, GA; 2012 – 2013.

  2. Palmer House / Atlanta Housing Authority / The Integral Group – Abatement and Demolition of nineteen-story high rise apartment building; Project Schedule 145 days; Contract Value $2,400,000; Customer Contact – Channing Henderson (404) 526-1887 chenderson@integral-online.com; Atlanta, GA; 2010 – 2011.atlanta demolition 00.jpg




  1. West Paces Hospital / Hospital Corporation of America – Demolition and Abatement of former West Paces Ferry Hospital totaling approximately 475,000 square feet of structures; Recycling of approximately 2500 tons of steel and 9,500 tons of concrete; Project Schedule -180 days; Contract Value - $1,900,000; Customer Contact – Ron Woods – (615) 344-5605 Ron.Woods@HCAHealthcare.com; Atlanta, GA; 2009.




  1. Coors Molson Corporation / Raython Corporation / Atlanta Land Group – Demolition, Abatement and complete Recycling of former Oxford Chemical industrial facility, five buildings totaling 360,000 square feet; Project Schedule – 90 days; Contract Value - $700,000; Customer Contact – Jay Leslie (404) 277-9191 jleslie@atlantalandgroup.com; Chamblee, GA, 2008 or local Contact Jay Leslie (404) 277-9191; Chamblee, GA; 2009




  1. Georgian Hills Apartments / Atlantic Realty Partners / Fortune-Johnson General Contractors – Abatement and Demolition of thirty-three apartment buildings, totaling 250,000 sq/ft of structures; Project Schedule 60 days; Contract Value $750,000; Customer Contact – Lee Horner (678) 399-1214 lhorner@fortune-johnson.com; Atlanta, GA; October – November 2012.




  1. Jamestown Ponce City Market / Gay Construction – Underground tunnel asbestos abatement and demolition; and site demolition and preparation after abatement and demolition described in project listing number 9 below; Project Schedule – 60 days; Contract Value $303,000; Customer Contact – Joe Thompson (404) 597-6106 jthompson@gayconstruction.com; Atlanta, GA; August – December 2012.




  1. Columbia Mill Apartments / Columbia Residential Development – Abatement and Demolition of twelve 2-story apartment buildings totaling 125,000 sq/ft of structures; Project Schedule 30 days; Contract Value $340,000; Customer Contact – Robert Barfield (404) 419-1438 RBarfield@Columbiares.com; Atlanta, GA; August – September 2012.




  1. Jamestown Ponce City Market / Gay Construction – Abatement and Demolition of three-story parking deck connected to City Hall East; Project Schedule – 80 days; Contract Value $536,665; Customer Contact – Joe Thompson (404) 597-6106 jthompson@gayconstruction.com; Atlanta, GA; March – April 2012.

  2. Smyrna Commons / Cobb County School District / City of Smyrna, GA – Demolition of thirteen apartment buildings to make way for the new Smyrna Elementary School; Project Schedule – 30 days; Contract Value $330,000; Customer Contact – Scott Stokes (678) 631-5337 sstokes@ci.smyrna.ga.us; Smyrna, GA; April 2012.

  3. City of Smyrna, Georgia / Hickory Lake Apartments – Demolition of 32 Apartment Buildings on a 30 acre site; Project Schedule 145 days; Contract Value: $1,290,000; Customer Contact – Scott Stokes (678) 631-5337 sstokes@ci.smyrna.ga.us; Smyrna, GA; 2011 – 2012.




  1. Turner Construction Company / DeKalb (Georgia) County Schools / Chamblee Charter High School – Demolition of a major portion of an existing and occupied school building; Project Schedule – 60 days ; Project Cost – $580,000; Method of Deconstruction – mechanical demolition; Customer Contact – Turner Construction, Keith Werre (404) 504-2750; kwerre@tcco.com; Atlanta, GA.

  2. Grady Hospital HLF / Grady Health System / Doster Construction – Abatement and Demolition of three auxiliary buildings in the Grady Complex without disruption of adjacent activity; Project Schedule: 45 days; Contract Value: $367,180; Customer Contact – Allen Fuller (770) 780-8209 afuller@dosterconstruction.com; Atlanta, GA; 2011.




  1. Fulton County, Georgia / Summertree Condominiums – Abatement and Demolition of apartment complex ; Method of Deconstruction – mechanical demolition; Project Schedule – 30 days; Project Cost – $400,000; Customer Contact – James Jones (404) 612-5818 james.jones@fultoncountyga.gov; Atlanta, GA; 2012.

  2. Emory University / Briarcliff Cottages – Abatement and Demolition of 75,000 s/f of structures; Project Schedule 45 days; Contract Value: $424,728; Customer Contact – Charles Rossignol (404) 712-9447 Charles.Rossignol@Emory.edu; Atlanta, GA; 2011.

  3. Hospital Corporation of America / Dunwoody Hospital – Abatement and Demolition of 100,000 s/f of structures; Project Schedule 90 days; Contract Value: $652,650; Customer Contact – Ron Woods (615) 344-5605 Ron.Woods@HCAHealthcare.com; Dunwoody, Georgia; 2011.

  4. 1627 Peachtree Street (The John Hunsinger & Co. Building) / CM Companies – Abatement & Demolition of a three-story office building, totaling 55,000 s/f and situated between an on ramp and a highway in Midtown Atlanta; Contract Value: $200,000; Customer Contact – Vivian Cushman – (770)-886-8688 vchusman@cmbusiness.com; Atlanta, GA; 2011.

  5. General Shale Brick Plant / Pollack Shores Real Estate Group – Demolition, Abatement and recycling, 2142 James Jackson Parkway, Atlanta. Project Outline – Demolition, abatement, decommissioning, equipment dismantling and recycling of Industrial facilities totaling 439,000 Sq. Ft.; Abatement of 350,000 Sq. Ft. of ACM and crushing of 45,000 tons of recycled concrete, recycling of 500 tons of various metals of which 80% of total project materials recycled. Method of Deconstruction – mechanical demolition; Project Cost - $875,000; Schedule 60 calendar days; Bill Moyer (770) 480-4476 bmoyer@pollackshores.com; Atlanta, GA 2011.

  6. MLK Tower at McDaniel Glenn / Atlanta Housing Authority / Columbia Residential Development – Abatement and Demolition by Implosion of thirteen-story high rise apartment building; Project Schedule 90 days; Contract Value $1,500,000; Customer Contact – Robert Barfield (404) 419-1438 RBarfield@columbiares.com; Atlanta, GA; 2009 – 2010.

  7. Children’s Healthcare of Atlanta at Hughes Spalding / DeKalb Atlanta Hospital Authority / Gilbane – Demolition of five-story structure totaling 65,000 square feet in dense urban setting connected to a functioning hospital; Project Schedule 45 days; Contract Value - $400,000; Customer Contact – Chris Brown (478) 952-5417; Atlanta, GA; 2010.

  8. Thomasville Heights / Atlanta Housing Authority / IMS Management Services – Abatement, Demolition and Recycling of 56 two-story apartment buildings totaling 430,000 square feet of structures; Project Schedule – 145 days; Contract Value – $1,367,000; Customer Contact – Channing Henderson (404) 223-0588 chenderson@integral-online.com; Atlanta, GA; 2009 – 2010.

  9. Bankhead Courts Apartments / Atlanta Housing Authority / The Habitat Company – Abatement and Demolition of 55 buildings totaling 480,000 square feet; Project Schedule – 145 days; Contract Value – $2,675,000; Customer Contact – Mark Kyles (678) 752-7016 mkyles@habitat.com; Atlanta, GA; 2010 – 2011.

  10. Collier Heights Elementary School / Atlanta Public Schools / Kellogg Brown & Root – Abatement and Demolition of school building; Project Schedule 45 days; Contract Value - $200,000; Customer Contact – Josh Knauf (404) 377-6440 joshua.knauf@kbr.com; Atlanta, GA; 2010 - 2011.

  11. Hollywood Courts Apartments / Atlanta Housing Authority / The Habitat Company – Abatement and Demolition of 25 buildings totaling 190,000 square feet; Project Schedule 90 days; Contract Value $996,000; Customer Contact – Mark Kyles (678) 702-7016 mkyles@habitat.com; Atlanta, GA; 2010.

  12. Cook School / Atlanta Public Schools / Kellogg Brown & Root – Abatement and Demolition of elementary school; Project Schedule 30 days; Contract Value $33,000; Customer Contact – Mark McKay (404) 377-6440 mark.mckay@kbr.com; Atlanta, GA; 2010.

  13. Housing Authority of DeKalb County, Georgia / Johnson Ferry East Phase II – Demolition of 18 apartment buildings totaling 160,000 square feet and removal of 25,000 cubic yards of unsuitable soils, 4,000 linear feet of underground utilities, and re-grading and compacting site; Project Schedule - 120 days; Contract Value - $1,000,000; Customer Contact – Ken Yount (404) 374-9574 key@dekalbhousing.org; Atlanta, GA; 2008.

  14. Ft. Bragg Facilities Reduction / U.S. Army Corps of Engineers / Trinity Industrial Services – Abatement and Demolition of 13 barracks structures totaling 425,000 square feet; Project Schedule – 180 days; Contract Value - $2,458,000; Customer Contact – Wade Jones, (910) 443-0200; Fayetteville, NC; 2009.

  15. University Homes / Atlanta Housing Authority / IBG Construction Services – Abatement and Demolition of 38 two-story buildings totaling 300,000 square feet of structures; Project Schedule – days 120; Contract Value - $1,250,000; Customer Contact – Robert Fain – (404) 224-1870; Atlanta, GA; 2009.

  16. Riverdale Civic Center Development / City of Riverdale – Clearing, Grading, Demolition, Site Work, Storm and Sanitary Sewer and Utilities for 10.5 acre site; Project Schedule - 90; Contract Value - Confidential; Customer Contact – Doug Manning (770) 996-3397 dmanning@riverdalega.gov; Riverdale, GA; 2009.

  17. The Zeist Foundation / Edgewood Duplexes – Demolition and Abatement of 104 duplexes totaling 150,000 square feet; Project Schedule – 90 days; Contract Value - $550,000; Customer Contact – Kappy deButts (404) 949-3160 kdebutts@zfo.net; Atlanta, GA; 2008.

  18. White-Spunner General Contractors / Wal-Mart / Avondale Mall - Demolition and Abatement of multi-story shopping mall totaling approximately 400,000 square feet. Accelerated project schedule of 45 (30 days for demolition and 15 days for abatement); Contract Value $750,000; Customer Contact – Jeff Carrico (251) 656-2350 jeff.carrico@white-spunner.com; Decatur, GA; 2009.

  19. Housing Authority of New Orleans / Broadmoor LLC / Columbia Residential Development / St. Bernard Housing Redevelopment – Demolition of 67 apartment buildings totaling 945,000 square feet; Project Schedule - 90 days; Contract Value -$2,200,000; Customer Contact - Robert Barfield (404) 419-1438 rbarfield@columbiares.com; New Orleans, LA; 2008.

  20. Sembler Development / Brookhaven Town Center – Demolition, Remediation, Abatement and Recycling of 71 structures totaling 450,000 square feet; Recycling of 21,000 tons of concrete, block and brick; Project Schedule – 120 days; Contract Value - $2,400,000; Customer Contact – Jeff Fuqua (404) 847-1800 jeff.fuqua@fuquadev.com; Atlanta, GA; 2007.

  21. Emory University / Cousins Real Estate Corporation / Turner Village - Demolition, Abatement and Recycling of 105,000 square feet of structures and 70,500 square feet of asphalt; Project Schedule 60 days; Contract Value - $330,000; Customer Contact – John Goff (404) 407-1000; Atlanta, GA; 2008.

  22. Grant Development Corporation / Seaboard Industries Petroleum Processing Facility – Demolition, Decommissioning and cleanup of petroleum manufacturing facility: Removal of 55 above and below ground storage and processing tanks and pumping and mixing facility; Project Schedule – 90 days; Contract Value - Confidential: Customer Contact – Lee Katz – (404) 307-6150; Doraville, GA; 2008.

  23. Emory University / Holder Construction – Demolition and Recycling of 60,000 square feet of structures, including removing and storing for re-use 20,000 square feet of roof tiles. Project schedule of 60 days; Contract Value of $260,000; Customer Contact Brad Hutto, Holder Construction (770) 988-3314; Atlanta, GA; 2007.

  24. Industrial Metals / Perennial Properties – Demolition, Decommissioning and Recycling of former industrial facility; Project Outline – Demolition of an industrial building totaling 275,000 Sq. Ft., crushing and recycling of 20,000 tons of concrete and 550 tons of various metals. Abatement of approximately 35,000 Sq. Ft. of Asbestos Containing Material (“ACM”); of which 75% of total project materials recycled; Removal of approximately 11,000 cubic yards of contaminated soils; Contract Value – $790,000; Schedule – 90 calendar days; Customer Contact: Aaron Goldman (404) 881-0766 aaron@perennialproperties.net; Atlanta, GA; 2005.

  25. Trellis Companies / Clark Howell Partners / Mount Zion Retail – Demolition, Abatement and Site Development of industrial facility totaling 350,000 square feet; Site Preparation for redevelopment; Project Schedule – 120 days; Contract Value - $500,000; Customer Contact – Todd Bender (678) 480-7234; Atlanta, GA; 2008.

  26. Cambridge Builders & Contractors / Peachwood Circle Apartments – Abatement, Demolition & Recycling of a 22 building apartment complex totaling 200,000 square feet; Project Schedule - 45 days; Contract Value - $610,000; Customer Contact – Mike Ruskin (404) 252-3142; Atlanta, GA; 2008.

  27. Wood Partners / Perry Village Retail – Demolition of retail shopping center and adjacent buildings totaling 125,000 square feet; Project Schedule - 45 days; Contract Value - $200,000; Customer Contact – Matt Haynes; Atlanta, GA; 2008.

  28. Hospital Corporation of America / Paces Medical Center Skywalk Bridge – Structural Dismantling and removal of 400 linear foot, enclosed, elevated concrete “Skywalk” bridging two buildings across roadway; Project Schedule;10 days; Contract Value - $280,000; Customer Contact Ron Woods (HCA) (615) 344-5605; Atlanta, GA 2008.

  29. Squire Inn Inc. / Days Inn – Demolition and Abatement of 65,000 square feet of one, two and three story hotel structures; Project Schedule - 30 days; Contract Value - $200,000; Customer Contact – Mike Aldridge – (404) 281-1060; Atlanta, GA; 2008.

  30. Hartsfield Jackson International Airport Air Traffic Control Tower / CADM – Implosion of 12 story control tower and demolition of base buildings totaling approximately 65,000 square feet; Recycled metals, concrete and wiring totaling 86% of the project by volume; Project Schedule – 30 days; Customer Contact – Mel Mitchell (770) 328-0931; Atlanta, GA; 2006.

  31. Skyline III, LLC / Morosgo Drive Apartments – Demolition of 12 building apartment complex totaling 200,000 square feet; Project Schedule - 45 days; Contract Value - $250,000; Customer Contact – John Emory; Atlanta, GA; 2008.

  32. DLC Management Corp / Sprayberry Square Redevelopment – Demolition of 117,000 sq/ft structure attached to existing shopping facility, and site preparation for redevelopment: Project Schedule - 60 days; Contract Value - $590,000; Customer Contact – Steve Whyte (914) 631-3131; Atlanta, GA; 2008.

  33. Alliance Residential / Broadstone Glenwood – Demolition, Abatement and Site Development of 24 building apartment complex, totaling 225,000 square feet; Project Schedule - 120 days ; Contract Value - $1,200,000; Customer Contact – Joe Richardson (404) 923- 8115; Atlanta, GA; 2008.

  34. Inter Urban Development / 54 Perimeter Center – Demolition of two-story office building totaling 75,000sq/ft; Project Schedule – 30 days; Contract Value - $190,000; Atlanta, GA; 2007.

  35. DeKalb County, Georgia / MEBBC / Jackson Square Apartments – Demolition and Abatement of four apartment buildings in flood plain; Project Schedule - 30 days; Contract Value - $125,000; Customer Contact – Eugene Trapp (404) 992-5489; Atlanta, GA; 2007.

  36. Atlanta Housing Authority / Lane Strategic Renovation / Leila Valley Apartments – Demolition of 14 Atlanta Housing Authority two-story apartment buildings totaling 225,000 square feet; Project Schedule - 60 days; Contract Value $500,000; Atlanta, GA; 2007.

  37. Perennial Properties / Mayo Furniture – Demolition, Abatement and Site Development of warehouse / distribution center totaling 150,000 sq/ft; Project Schedule – 90 days Contract Value - $400,000; Customer Contact – Aaron Goldman (404) 881-0766; Atlanta, GA; 2008.

  38. Centex Homes / The Cliffs Apartments – Demolition and Recycling of 30 apartment buildings totaling approximately 170,000 square feet of structures. Project schedule of 45 days; Contract Value of $400,000; Customer Contact – Jeff Green (770) 665-1280; Atlanta, GA, 2006.

  39. Perennial Properties / Foster & Company General Contractors / Athens Mixed Use Development Demolition and Site Preparation for new 300 unit apartment project; Project schedule – 15 days for demolition and 120 days for site work; Contract Value - $950,000; Customer contact – Aaron Goldman, Perennial Properties (404) 881-0766; Athens, GA; 2007.

  40. BHC Property Group / Ryland Homes / Dunwoody Park Apartments – Demolition and Recycling 42 apartment buildings totaling approximately 350,000 square. Project Schedule 45 days; Contract Value - $975,000; Customer Contact – Bill Moyer, BHC Property Group, (770) 237-8333; Atlanta, GA; 2007.

  41. Worthing Development / Perimeter Center East – Demolition and Recycling of 8 commercial structures totaling 275,000 square feet; Processing and crushing of approximately 20,000 tons of concrete into screened aggregate; Project schedule 60 days; Contract Value - $600,000; Customer Contact – Steve Ingram (770) 522-5775; Atlanta, GA; 2006.

  42. Lane Construction / Lindmont Plaza – Demolition of a 52 multi-unit, multi-building apartment complex totaling approximately 400,000 Sq. Ft. Processing and crushing of approximately 40,000 Tons of concrete and block with 80% of the crushed debris recycled on-site. Contract Value - $1,000,000; Project Schedule 120 calendar days; Customer Contact – Ronnie Strickland (678) 249-7431; Atlanta, GA; 2006.

  43. Lane Realty Construction / Northwoods Apartments – Demolition and Recycling of 7 structures totaling 41,000 square feet and 32,000 square feet of asphalt, sidewalk and curb. Project schedule of 14 days; Contract Value $125,000; Customer Contact – Paul Seefried (770) 777-7500; Atlanta, GA; 2006.

  44. Coro Development / Habersham Court Apartments - Demolition and Recycling of 52,000 square feet of structures. Project schedule of 30 days; Contract Value of $160,000; Customer Contact – Adam Gilmore (404) 846-4000 agilmore@cororealty.com; Atlanta, GA; 2007.

  45. Alliance Residential Builders / Perimeter Park – Demolition, Abatement, Recycling and site development of approximately 80,000 square feet of offices and 60,000 square feet of asphalt. Project schedule 30 days; Contract Value approximately $880,000; Customer Contact – Bill Scott (404) 923-8330; Atlanta, GA; 2008.

  46. Perennial Properties / Foster & Company General Contractors / Pencil Factory – Demolition, Abatement and Recycling of approximately 75,000 square feet of structures and 80,000 square feet of concrete and asphalt; Contract Value $200,000; Customer Contact – Aaron Goldman (404) 881-0759; Atlanta, GA; 2007.

  47. Wood Partners / National Linen Building – Demolition, Recycling, tank removal, and Remediation of single story former linen factory totaling approximately 150,000 square feet. Project schedule of 45 days; Contract Value $290,000; Customer Contact: Matt Haynes; Atlanta, GA; 2006.

  48. Alliance Residential Builders / Ramada Inn Piedmont – Demolition, Abatement, Recycling and Site Development of hotel property, including 140,000 square feet of structures and recycling of 40,000 square feet of asphalt, sidewalk and curb. Project schedule of 45 days; Contract Value $489,000; Customer Contact – Joe Richardson (404) 923-8115; GA; 2007.

  49. Emory University / New South Construction / Eagle Row Realignment – Demolition and Recycling of laundry structure totaling approximately 25,000 square feet; Project Schedule – 15 days; Contract Value - $100,000; Customer Contact – Rachel Martin, project manager, (404) 443-4000; Atlanta, GA; 2008.

Equipment List

Atlanta Demolition owns and operates a full fleet of heavy and specialty equipment for commercial demolition, material handling and earthwork activities. Any equipment that is not part of our inventory is rented on an as-need basis. The following list is an overview of our equipment.

Equipment Description Manufacturer / Model Gross Weight Purpose

Excavator

Hyundai 450

107,000 lbs

Demolition

Excavator

Case 9060B

105,000 lbs

Demolition

Excavator

Hitachi EX450 LC

105,000 lbs

Demolition

Excavator

Hitachi EX450 LC

105,000 lbs

Demolition

Excavator

Case CX460

101,000 lbs

Demolition

Excavator

Case 460

101,000 lbs

Demolition

Excavator

Case 460

101,000 lbs

Demolition

Excavator

Case 460

101,000 lbs

Demolition

Excavator

Kobelco SK400 LC

95,000 lbs

Demolition

Excavator

Kobelco SK400 LC

95,000 lbs

Demolition

Excavator

Kobelco SK330 LC

78,000 lbs

Demolition

Excavator

Case 330 XL

82,000 lbs

Site

Excavator

Kobelco SK330 LC

78,000 lbs

Demolition

Excavator

Kobelco SK300 LC

78,000 lbs

Demolition

Excavator

Kobelco SK290 LC

75,000 lbs

Demolition

Excavator

Kobelco SK290 LC

75,000 lbs

Demolition

Excavator

Kobelco SK220 LC

55,000 lbs

Demolition

Excavator

Kobelco SK210 LC

55,000 lbs

Demolition

Excavator

Case 330 XL

80,000 lbs

Demolition

Excavator

Case 330 XL

80,000 lbs

Demolition

Excavator

Case 240 XL

55,000 lbs

Demolition

Excavator

Case 240 XL

55,000 lbs

Demolition

Excavator

Case 240 XL

55,000 lbs

Demolition

Mini-Compact Excavator

Case CX 36B

8,000 lbs

Demolition

Mini-Compact Excavator

Case CX 36B

8,000 lbs

Demolition

Track Loader

CAT 973

70,000 lbs

Demolition

Dozer

Case 850

60,000 lbs

Site

Track Loader

CAT 973

70,000 lbs

Demolition

Track Loaders

CAT 963

60,000 lbs

Demolition

Track Loaders

CAT 963

60,000 lbs

Demolition

Track Loaders

CAT 963

60,000 lbs

Demolition

Track Loader

CAT 953

48,000 lbs

Demolition

Skid Steer Loaders

Bobcat 843

N/A

Demolition

Skid Steer Loaders

Bobcat 773

N/A

Demolition

Skid Steer Loader

Bobcat 773

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Skid Steer Loader

CASE Bobcat 445

N/A

Demolition

Off Road Truck

Deere 250 C

25 Ton

Rock Hauling

Off Road Truck

Deere 300 C

30 Ton

Rock Hauling

Off Road Truck

Case 330

30 Ton

Rock Hauling

Off Road Truck

Case 330

30 Ton

Rock Hauling

Labounty Concrete

Processor (Excavation)

Twin Ram 2nd Member

N/A

Demolition & Debris Processing

Genesis Rebar Shear (Excavation)

Twin Cut Rebar Shear

N/A

Rebar

Processing

Material Processors /

Metal Shears (Excavation)

NPK-M38 - Concrete

Processor / Shear

N/A

Concrete / Metal

Processing

Material Processors /

Metal Shears (Excavation)

NPK-M38 - Concrete

Processor / Shear

N/A

Concrete /Metal Processing

Material Processors /

Metal Shears (Excavation)

NPK-M28 - Concrete

Processor / Shear

N/A

Debris

Processing

Material Processors / Concrete (Excavation)


NYE Concrete Processor

N/A

Concrete

Processing

Hydraulic Hammer (Excavation)

NPK E216 5500 lbs

N/A

Debris

Processing

Aggregate Crusher

Pegson Jaw XR 400 Jaw Crusher

102,000 lbs

Aggregate

Crushing

Aggregate Crusher

Pegson Trakpactor 1412 Impact Crusher

100,000 lbs

Aggregate

Crushing

Aggregate Screen

Chieftain Powerscreen 1800

72,000 lbs

Aggregate Screening

Aggregate Screen

Chieftain Powerscreen 2100

95,000 lbs

Aggregate Screening

Aggregate Screen

Warrior Powerscreen 1800

65,000 lbs

Aggregate Screening

5036 Radial Stacking Conveyor

Chieftain Powerscreen Stacker

12,500 lbs

Aggregate Processing

Rubber Tire Loader

Kawasaki 85Z

46,000 lbs

Aggregate Process Loading

Rubber Tire Loader

Kawasaki 85Z

46,000 lbs

Aggregate Process Loading

Rubber Tire Backhoe

CAT 416 B

14,000 lbs

Loading / Utility

Truck

2007 Mack Tractor

N/A

Debris Removal

Truck

2007 Mack Tractor

N/A

Debris Removal

Truck

2006 Mack Tractor

N/A

Debris Removal

Truck

2006 Mack Tractor

N/A

Debris Removal

Truck

2005 Mack Tractor

N/A

Debris Removal

Truck

2006 Mack Tri -Axle

N/A

Equipment Mobilization

Trailer

2005 Benson Dump

32 Ft

Debris Hauling

Trailer

2005 Benson Dump

32 Ft

Debris Hauling

Trailer

2004 Benson Dump

32 Ft

Debris Hauling

Trailer

2003 Benson Dump

32 Ft

Debris Hauling

Trailer

2007 Clement Dump

37 ft / 62 yard

Debris Hauling

Trailer

2007 Clement Dump

37 ft / 62 yard

Debris Hauling

Trailer

2007 Clement Dump

37 ft / 62 yard

Debris Hauling

Trailer

2007 Clement Dump

37 ft / 62 yard

Debris Hauling

Trailer

2007 Clement Dump

37 ft / 62 yard

Debris Hauling

Trailer

EAST - 100 Cubic Yd Live Floor

80,000 lbs

Debris Hauling

Trailer

EAST - 100 Cubic Yd Live Floor

80,000 lbs

Debris Hauling

Trailer

Trailking 100 Cubic Yd Live Floor

80,000 lbs

Debris Hauling

Load King Lowboy Trailer

2006 Load King 60-Ton

60 Ton

Equipment Mobilization

Liddell Lowboy Trailer

2005 Liddell 50-Ton

55 Ton

Equipment Mobilization

Utility Trailer

Hardeebuilt Dual-Axle

N/A

Equipment Mobilization

Job-Site Utility Trailer

Horton 16Ft Dual-Axle

16 Ft

Misc.

Debris Containers (20)

Roll Off Containers (20)

20-Yd, 30-Yd

and 40-Yd

Debris Hauling

Fuel and Lube Truck

Chevrolet Kodiak

30,000 lbs

Fuel and Lube

Service Trucks

Ford F250, F350, Chev K2500

N/A

Equipment Servicing

Insurance and Bonding


Atlanta Demolition is fully insured and maintains an $8,000,000 (single project) and a $12,000,000 (aggregate) bond line. Bonding at higher levels is available on a per-project needs basis. Our surety is The Gray Casualty & Surety Company.

Environmental References

One Consulting Group – Robert Brawner, (404) 817-8809



Rex Bray – Planners and Engineers Collaborative – (678) 684-6209

Conclusion

Atlanta Demolition has grown rapidly by continuously providing professionally superior services to our clients while always maximizing efficiency and safety on the job and minimizing costs. We have in-depth experience and the financial stability to equip and staff any size project with the proper mix of professional grade equipment and qualified personnel to complete a project on time, on budget and to your satisfaction. Our services are provided by the most efficient, best trained, knowledgeable and safety conscious personnel in the industry. Any requests / invitations for bid will be handled promptly and in a professional manner. We will ensure our quotation will meet your desires according to the best possible timeline, price and professional workmanship. We will strive to exceed your every expectation and it’s our past success that is best measured by the opinions of our clients. We invite you to contact any of our current or past references, and we look forward to working with your company.


Download 148.49 Kb.

Share with your friends:




The database is protected by copyright ©ininet.org 2024
send message

    Main page