Submission of proposals



Download 1.22 Mb.
Page2/55
Date17.12.2020
Size1.22 Mb.
#54991
1   2   3   4   5   6   7   8   9   ...   55
55034

Please Note!





  • The Army requires proposers to submit the Proposal Cover Sheet (formerly Appendix A and B) and Company Commercialization Report (formerly, Appendix E) electronically. Visit the Army SBIR Website (address: http://www.aro.army.mil/arowash/rt/ ) to get started. This page has a link to the DoD-wide SBIR proposal submission system (available directly at http://www.dodsbir.net/submission), which will lead you through the preparation of the Proposal Cover Sheet and Company Commercialization Report. Refer to section 3.4n at the front of this solicitation for detailed instructions on the Company Commercialization Report. You must print out these forms directly from the Website, sign them, and submit them with the hard copies of your proposal. Please note that a proposal is not considered accepted until the Army receives the entire packet in hard copy. Please read the detailed electronic submission instructions, which follow. Improper handling of these forms may result in the proposal being substantially delayed. Information provided on the Company Commercialization Report will have a direct impact on the evaluation of the proposal.




  • This year the Army will also accept the full technical proposal and the Cost Proposal (Reference A of this solicitation) via the Internet on a voluntary basis. Follow the instructions on the DoD SBIR proposal submission site. This is a test in preparation for full electronic proposal submission in the future.



1   2   3   4   5   6   7   8   9   ...   55




The database is protected by copyright ©ininet.org 2024
send message

    Main page