capacity of pump sets vary in accordance with the size and depth of padasekharams. Ina
single padasekharam called Thekkethollayiram at Ramankari
with a total area of 90 acres 9 pump sets are installed and their capacity ranges from 25 to 50 HP. The task of dewatering is entrusted to private contractors who get the contract in auction. Like
the ring bund repair charges, dewatering charges are also shared jointly by the concerned farmers in each padasekharam on the basis of their paddy land sizes. Usually dewatering operations for the summer crop begin by the end of September when the water level in padasekharams declines to manageable limits and it lasts for 3 to 5 weeks without break.
Share with your friends: