SECTION 11: SUBSTATIONS AND HIGH VOLTAGE INSTALLATION
MV Network Design requirements (11-22 KV)
General Requirements for Substation Construction within Private plot
Substation Location & Access
Substation Types and Area
Substation Ventilation for Ground Floor
Forced Ventilation(Only for basement transformer rooms)
Methods of equipment transportation to Basement Transformer rooms
Substation cable arrangement (subject to DEWA design)
Direct 11kV Supply for High - Rise Towers above 200m / Industrial / Private Load
Intake arrangement and protection requirements
Power factor at point of supply should be maintained at 0.95 or higher.
SECTION 12: GREEN BUILDING REGULATIONS
Compliance Requirements
Specific regulations applied by DEWA
Elevators and escalators
Lighting power density – interior
Lighting power density – exterior
Lighting controls
Electronic ballasts
Smart Electricity metering
Central control and monitoring system
On-site renewable energy – small to medium scale embedded generators
On-site renewable energy – outdoor lighting
APPENDIX
Reference Standards
Contractors Inspection Certificate(Format)
A-Typical arrangement of kWh meters in electric services room. B-Typical arrangement of metering cabinet on compound wall. C- Arrangement of metering in main LV panel.
D1- Typical electrical services room with 1 No. cubicle type LV. Switchboard /panel. D2- Two LV panels arrangement in LV switch room.
E – Typical electrical service room with 1 No. MDB (MAX. 400 AMPS RATING)
Data Schedule For LV Electricity Meters And Current Transformers
Selection of cables
Table 1:-Single Core PVC Insulated Non-Armoured, Standard Copper Conductors
Table 2 :-Multi Core Armoured PVC Insulated Copper Conductors Table-3 :-Multi Core Armoured XLE Insulated Copper Conductors
Colour Identification Of Unarmoured, Armoured And Flexible Cable Cores And Bare Conductors
Specifications Of MDBS/SMDBS(Format)
Specification Of DBS (Format)
Earth Continuity Conductors (ECCs and Equi-Potential Bonding Conductors.
Earth Leakage Protection
Spacing Of Support For Trunking, Conduiting and Cables
Number Of Cables that may be installed in Trunking Conduits and Trays
General conditions/ requirements for provision of attic slab above substation and LV electrical room.
General dimensional details within buildings.
General arrangements and details of substation equipment within buildings.
Details of substation doors (A).
Details of substation doors (B).
Force ventilation for transformer room at basements.
Cable laying arrangement in concrete trench (Section T-T)