Oklahoma department of environmental quality



Download 2.8 Mb.
Page10/27
Date16.08.2017
Size2.8 Mb.
#33136
1   ...   6   7   8   9   10   11   12   13   ...   27

D.2.6. SIGNIFICANT IMPACT ANALYSIS



Purpose and Methodology

The significant impact analysis is the first phase of the Source Impact Analysis and determines two results: 1) the maximum impacts from the project emissions increase and 2) the location of predicted impacts greater than significant impact levels (SILs). The area of these impacts defines the impact area of the project and the significant impact distance (SID).


G-P performed a significant impact analysis to determine whether the emission increases result in maximum predicted impacts greater than the PSD modeling SILs or the EPA monitoring de minimis concentrations. Current EPA and ODEQ policies stipulate that G-P compare the highest predicted short-term impacts to these levels. Table D-3 presents the SILs and de minimis concentrations.
Table D-3

Pollutant

Averaging Time

Significant Impact Levels (μg/m3)

De Minimis Concentration (μg/m3)

PM10

24-hour

5

10

Annual

1

--

NO2

Annual

1

14

SO2

3-hour

25

--

24-hour

5

13

Annual

1

--

CO

1-hour

2,000

--

8-hour

500

575

Model Inventory

For the significant impact analysis, the model inventory only includes point and fugitive sources that will experience an increase or decrease in emissions due to the project. The emission increase represents two sets of sources. For sources physically modified, G-P determined an emission increase by calculating the difference between the potential maximum emissions limited by permit or source capacity, and the actual level of emissions for the period 2002-2003. G-P calculated annual and short-term average emission changes. Table D-4 presents the baseline emissions, potential emissions and computes the difference in particulate matter (PM10) emissions from the modified project sources.




Table D-4

PM10 Significant Impact Analysis Emiss. Rates

Model ID

Source Description

Baseline (TPY)

Potential (TPY)

Project (TPY)

Project (g/s)

No. 11 and 12 Paper Machines (a) (b)

1112_8

PM 11 Yankee Wet End Exh. - process

1.16

2.19

2.17

0.062

PM 11Yankee Wet End Exh. - burner

0.26

1.40

PM 11 Yankee Wet End Exh. - total

1.42

3.59

1112_7

PM 11 Yankee Dry End Exh. - process

1.16

2.19

2.17

0.062

PM 11Yankee Dry End Exh. - burner

0.26

1.40

PM 11 Yankee Dry End Exh. - total

1.42

3.59

1112_20

PM12 Yankee Exh -process

3.71

6.13

4.32

0.124

PM12 Yankee Exh -burner

0.90

2.80

PM12 Yankee Exh -total

4.61

8.93

1112_1

Building Exhaust

0.35

0.61

0.26

0.0077

1112_2

Building Exhaust

0.35

0.61

0.26

0.0077

1112_3

Building Exhaust

0.35

0.61

0.26

0.0077

1112_4

Building Exhaust

0.35

0.61

0.26

0.0077

1112_5

Building Exhaust

0.35

0.61

0.26

0.0077

1112_9

Building Exhaust

0.35

0.61

0.26

0.0077

1112_10

Building Exhaust

0.35

0.61

0.26

0.0077

1112_11

Building Exhaust

0.35

0.61

0.26

0.0077

1112_13

Building Exhaust

0.35

0.61

0.26

0.0077

1112_14

Building Exhaust

0.35

0.61

0.26

0.0077

1112_15

Building Exhaust

0.35

0.61

0.26

0.0077

1112_17

After Dryer Exh.

0.29

0.51

0.22

0.0064

1112_18

After Dryer Exh.

0.29

0.51

0.22

0.0064

1112_19

After Dryer Exh.

0.29

0.51

0.22

0.0064

1112_22

Vacuum Pump

0.18

0.31

0.13

0.0039

1112_23

Vacuum Pump

0.18

0.31

0.13

0.0039

1112_24

Former Exh

0.37

0.65

0.28

0.0082

1112_25

Fan Pump Silo

0.04

0.07

0.03

0.00091

1112_26

Wall Exh.

0.18

0.31

0.13

0.0039

1112_28

Wall Exh.

0.18

0.31

0.13

0.0039

1112_29

Fan Pump Silo

0.04

0.06

0.03

0.0008

1112_30

Former Exh

0.36

0.63

0.27

0.0079

1112_31

Wall Exh.

0.18

0.31

0.13

0.0039

1112_27

Wall Exh.

0.18

0.31

0.13

0.0039

1112_32

Wall Exh.

0.18

0.31

0.13

0.0039

Paper Machine 13

13_13

Yankee Economizer - burner

0.729

2.796

3.92

0.113

Yankee Economizer - process

3.406

5.256

Yankee Economizer - total

4.135

8.052

13_1

Roof Exhausts

0.30

0.47

0.17

0.005

13_2

Roof Exhausts

0.30

0.47

0.17

0.005

13_3

Roof Exhausts

0.30

0.47

0.17

0.005

13_4

Roof Exhausts

0.30

0.47

0.17

0.005

13_5

Roof Exhausts

0.30

0.47

0.17

0.005

13_6

Roof Exhausts

0.30

0.47

0.17

0.005

13_7

Roof Exhausts

0.30

0.47

0.17

0.005

13_10

After Dryer Hood Exh

0.56

0.86

0.30

0.009

13_14

Fan Pump Silo

0.06

0.09

0.03

0.001

13_17

Vacuum Pump

0.25

0.39

0.14

0.004

13_18

Former Exh

0.41

0.64

0.22

0.006

13_19

Wall Exh. Fan

0.21

0.33

0.11

0.003

13_20

Wall Exh. Fan

0.21

0.33

0.11

0.003

Paper Machine 14

14_13

Yankee Wet End Exh. - burner

0.255

1.398

1.968

0.057

Yankee Wet End Exh. - process

1.803

2.628

Yankee Wet End Exh. - total

2.058

4.026

14_17

Yankee Dry End Exh.burner

0.255

1.398

1.968

0.057

Yankee Dry End Exh.process

1.803

2.628

Yankee Dry End Exh. total

2.058

4.026

14_1

Vacuum Pump exh.

0.18

0.26

0.08

0.010

14_2

Building exh.

0.33

0.48

0.15

0.002

14_3

Building exh.

0.33

0.48

0.15

0.004

14_4

Building exh.

0.33

0.48

0.15

0.004

14_5

Building exh.

0.33

0.48

0.15

0.004

14_6

Building exh.

0.33

0.48

0.15

0.004

14_7

Building exh.

0.33

0.48

0.15

0.004

14_8

Building exh.

0.33

0.48

0.15

0.004

14_9

Building exh.

0.33

0.48

0.15

0.004

14_10

Fan Pump Silo Exh.

0.27

0.40

0.13

0.004

14_11

Former Exh.

0.32

0.46

0.15

0.004

14_20

Wall Exh. Fan

0.27

0.40

0.13

0.004

14_21

Wall Exh. Fan

0.27

0.40

0.13

0.004

14_22

Wall Exh. Fan

0.27

0.40

0.13

0.004

Paper Machine 15

15_13

Yankee Wet End Exh. - burner

0.214

0.999

1.427

0.041

Yankee Wet End Exh. - process

1.778

2.420

Yankee Wet End Exh. - total

1.992

3.419

15_18

Yankee Dry End Exh.burner

0.214

0.999

1.427

0.041

Yankee Dry End Exh.process

1.778

2.420

Yankee Dry End Exh. total

1.992

3.419

15_11

Riffler Roof Exhaust

0.20

0.28

0.074

0.002

15_12

Former Exhaust w/ separator

0.50

0.67

0.179

0.005

15_2

Roof Exh.

0.28

0.39

0.102

0.0029

15_3

Roof Exh.

0.28

0.39

0.102

0.0029

15_4

Roof Exh.

0.28

0.39

0.102

0.0029

15_5

Roof Exh.

0.28

0.39

0.102

0.0029

15_6

Roof Exh.

0.28

0.39

0.102

0.0029

15_7

Roof Exh.

0.28

0.39

0.102

0.0029

15_8

Roof Exh.

0.28

0.39

0.102

0.0029

15_9

Roof Exh.

0.28

0.39

0.102

0.0029

15_22

Roof Exh.

0.28

0.39

0.102

0.0029

15_1

Vacuum Pump Silo

0.34

0.46

0.123

0.0035

15_19

Wall Fan

0.24

0.32

0.085

0.0025

15_20

Wall Fan

0.24

0.32

0.085

0.0025

15_21

Fan Pump Silo

0.14

0.20

0.052

0.0015


Download 2.8 Mb.

Share with your friends:
1   ...   6   7   8   9   10   11   12   13   ...   27




The database is protected by copyright ©ininet.org 2024
send message

    Main page