Project concept project Name Target market Basis of Design Project Location



Download 3.89 Mb.
Date11.11.2019
Size3.89 Mb.
#54251
KOKORI-GAS-PRESENTATION1
  • PROJECT CONCEPT
      • Project Name
      • Target market
      • Basis of Design
      • Project Location
  • PROJECT VOLUME AND RECOVERY
  • FEEDSTOCK COMPOSITION
  • PRODUCT EVACUATION SCHEME
  • SAFETY PROVISIONS & PRELIMINARY EIA STUDY
  • INFRASTRUCTURAL SUPPORT STRATEGY
  • STAFFING
  • FINANCIAL PLAN
      • Total amount required
      • Product yield/Annual Revenue
  • LOCAL CONTENT PLAN
  • PRESENTED TO THE NIGERIAN PETROEUM DEVELOPMENT COMPANY
  • BY
  • Amalem Resources Ltd

BASIC DESIGN

  • BASIC DESIGN
      • Selection of Process System
      • Block Flow Scheme
      • Process Flow Diagram
  • CODES AND STANDARDS APPLICABLE TO PROJECT
  • PLOT PLAN AND EQUIPMENT GENERAL ASSEMBLY
  • WORK SCHEDULE AND IMPLEMENTATION

Project Name: Establishment of one 500 tons/day small- scale LNG Plant at Kokori, Delta State

  • Project Name: Establishment of one 500 tons/day small- scale LNG Plant at Kokori, Delta State
  • Target Market: Domestic – We are already discussing with potential off takers in Port Harcourt, Onitsha and Benin. That possess the capacity to purchase the daily production from the proposed plant
  • Basis of Design: To liquify and monetize flared/captive Natural Gas

Feed Gas Composition Mole %

Estimated yield from processing of 33MMscf/day is as follows:

  • Estimated yield from processing of 33MMscf/day is as follows:
  • PRODUCT YIELD (Tons/Day)
      • LNG 500
      • LPG 90
      • PROPANE 120
      • CONDENSATE 360 Barrels
      • Power Requirement 6MMscf/day

LNG to be moved by road in double hulled vacuum insulated cryogenic tanks.

  • LNG to be moved by road in double hulled vacuum insulated cryogenic tanks.

Four Safety provisions applies to this project

  • Four Safety provisions applies to this project
        • Primary containment
        • Secondary containment
        • Safeguard systems
        • Separation distance

We are discussing with reputable international small LNG equipment providers with proven track record e.g General Electric, Chart LNG, Siemens etc.

  • We are discussing with reputable international small LNG equipment providers with proven track record e.g General Electric, Chart LNG, Siemens etc.

GE. is a cryogenic plant manufacturer, specializing in the design, engineering, and production of skid mounted Liquefied Natural Gas (LNG) plants.

  • GE. is a cryogenic plant manufacturer, specializing in the design, engineering, and production of skid mounted Liquefied Natural Gas (LNG) plants.
    • In Nigeria GE has built to its credit a small LNG plant in Port Harcourt of the same capacity as our proposed plant. Aside Nigeria GE has built more than 29 mini and small LNG plants all over the world.

Total staff strength of 310 of which 140 will be tanker drivers while the rest are management, plant operators, maintenance, health, safety, security and administrative staff.

  • Total staff strength of 310 of which 140 will be tanker drivers while the rest are management, plant operators, maintenance, health, safety, security and administrative staff.

Total sum required for the project = $150 million this includes cost of the plant, and delivery trucks.

  • Total sum required for the project = $150 million this includes cost of the plant, and delivery trucks.
  • Following projections show positive pre-tax returns for a 33mmscfd plant
  • SALES
  • Qty
  • Unit
  • Rate(USD)
  • Amt/day(USD)
  • LNG
  • 500
  • Ton
  • 375
  • 187,500
  • 61,875,000
  • LPG
  • 90
  • Ton
  • 40
  • 3,600
  • 1,188,000
  • Condensate
  • 360
  • bbls
  • 50
  • 18,000
  • 5,940,000
  •  
  •  
  •  
  •  
  •  
  •  
  • Total/day
  •  
  •  
  •  
  • 209,100
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  • Total/year
  •  
  •  
  •  
  • 69,003,000
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  • COSTS
  •  
  •  
  •  
  •  
  •  
  • Natural Gas
  • 33000
  • mscf
  • 2
  • 66,000
  • 21,780,000
  • Opex/Consumables
  • 33000
  •  
  • 0.5
  • 16,500
  • 5,445,000
  •  
  •  
  •  
  •  
  • 82,500
  •  
  • Total/year
  •  
  •  
  •  
  • 27,225,000
  •  
  • 41,778,000

The plant modules will be sourced abroad. assembling of modules to be done by a joint effort between Nigerians and expatriates. Access road at location, site preparation and hard stand will be handled by Nigerians.

  • The plant modules will be sourced abroad. assembling of modules to be done by a joint effort between Nigerians and expatriates. Access road at location, site preparation and hard stand will be handled by Nigerians.
  • Plant to be run by equipment supplier with Nigerians to understudy for at most five years with Nigerians fully taking over at the expiration of their contract.
  • 11. PRODUCTION PROCESS

Selection of Process System

  • Selection of Process System

Expansion cycle (EXP) using Nitrogen

  • Expansion cycle (EXP) using Nitrogen
  • Mixed refrigerant – Single mixed refrigerant (SMR) utilizing a cocktail of nitrogen and hydrocarbons that cool the natural gas. To be adopted, since it has higher efficiency (40%) and lower operating cost than EXP

US CODE OF FEDERAL REGULATION (CFR) PART 193

  • US CODE OF FEDERAL REGULATION (CFR) PART 193
  • NFPA 59A
  • EUROPE STANDARD EN 1473
  • EEMUA U.K. (ENGINEERING EQUIPMENT AND MATERIALS USERS ASSOCIATION) 14743

THANK YOU FOR LISTENING