Proposed position



Download 98.38 Kb.
Page68/76
Date04.03.2021
Size98.38 Kb.
#55993
1   ...   64   65   66   67   68   69   70   71   ...   76
Sam's CV (current as of Aug 2019) Envi Only
Activities performed: Scopes consisted of assessment of various ecosystems (upland and forest, coastal and marine, freshwater, aquatic and terrestrial) in the province and provide environmental strategies to preserve and protect the general environment of the province.




Name of assignment or project: Environmental Compliance for DMPC of Diesel Fired Power Plants

Year: 2001-2002

Location: Metro Manila, Philippines

Client: East Asia Diesel Power Corporation

Main project features: Fulfilling the Compliance requirements of DMPC’s diesel fired power plants.

Position held: Environmental Specialist

Activities performed: The scope involved fulfilling requirements posted in the notice of violation by the DENR to include the Environmental Risk Assessment (ERA), air quality monitoring report, continuous emission monitoring system, etc.






Download 98.38 Kb.

Share with your friends:
1   ...   64   65   66   67   68   69   70   71   ...   76




The database is protected by copyright ©ininet.org 2024
send message

    Main page