1 Done by: P. H. Muath Alaadi ptw assessment Preparation


- What PH will write in dynamic risk review



Download 1.54 Mb.
View original pdf
Page15/29
Date12.11.2023
Size1.54 Mb.
#62580
1   ...   11   12   13   14   15   16   17   18   ...   29
PTW Assessment Preparation
119- What PH will write in dynamic risk review
I will write in dynamic review box the only time that I do pause and check
120- What help you to write the dynamic risk review
What helps me is the pause and checkbox
121- What is LTI?
Last Time Injuries (must know the latest LTI of PDO)


21

122- What is Hot Work
Work which may result/involve an open flame, Production of spark and any other source of ignition. e.g., Grinding, Cutting, Welding.
123- What is SCBA?
Self-Contain Breathing Apparatus It is used in high HS areas for breathing.
124- What are the main Rules of PDO?
There are 2 main rules of PDO.
1) Golden Rules
2) Life Saving Rules
125- What is the PDO Golden & Life Saving Rules
Golden Rules
1) Comply with the law, standards and Procedures.
2) Intervene on unsafe or non-compliant action.
3) Respect our neighbor. Life Saving Rules Obtain a valid work permit whenever requires. Do gas test whenever required. Verify isolation. A valid permit before entering confine space. Obtain a valid permit to work before overriding. Work at Height with fall Prevention equipment. Save mechanical lifting Driving Line of fire
126- What are the PDO lifesaving rules related to permit
Make sure that which point is related to the job Make a tick on the TRIC card Explain and discuss it with the team members
127- Write down the Procedure of working in a Process Facility
I need an authorized Permit from applicant, get it validated from area authority after I will accept the permit put Copy of Permit Rack Keep Tag marker on Location Board I will write name of worker, permit no and job in entry register I will place HS card in HS Rack Place mobile phones of all in rack Then I will ensure that there is no source of ignition with anybody If I am going to work in high HS areas then I will take 2 SCBA holders with me also. Enter with HS Monitor on condition Identify Assembly Point and Emergency exit gate Arrange toll box meeting and Brief Job to crew. And start the work



Download 1.54 Mb.

Share with your friends:
1   ...   11   12   13   14   15   16   17   18   ...   29




The database is protected by copyright ©ininet.org 2024
send message

    Main page