10.13 INSTITUTE OF NUCLEAR MEDICINE & ALLIED SCIENCES, FARIDPUR

Institute of Nuclear Medicine & Allied Science (INMAS), Faridpur was established along with other three institutes in Mitford, Comilla and Bogra as a common project. The institute is situated in the premises of Faridpur medical college hospital. The foundation stone was laid on 15 September 1995 by the then minister of health and family planning, the peoples republic of Bangladesh. The construction was completed in early 1997 and the centre started functioning in October 1997. Patients from greater Faridpur district and adjacent areas usually attend the centre to receive nuclear medicine services if required. The institute has been rendering services through the following divisions:



              • Nuclear scanning /Scintigraphy Division

              • Thyroid Division

              • In-vitro Nuclear Medicine Division

              • Therapeutic Nuclear Medicine Division

              • Bone densitometry Division

              • Ultrasound Division

In the fiscal year 2012-2013, Institute of Nuclear Medicine and Allied Science (INMAS), Faridpur has done the following diagnostic patient studies, patient therapy, research and development works. Total 13237 patients attended the institute in that fiscal year.

      1. Patient Services

No.
Services

Total No. of Patients

1.
Ultrasonogram (normal and high resolution)

6567

2.

USG Guided FNAC

71

3.

High resolution USG / TVS

360

4.

Color Doppler Study

29

5.

Thyroid Scan & Uptake

355

6.
Renogram with or without GFR

84

7.
Whole body Bone Scan

29

8.

Radio iodine Therapy

26

9.
Thyroid Hormones (T3 T4 TSH FT3 FT4 TG)

4801

10.


Follicle stimulating hormone (FSH), Luteinzing Hormone (LH), Prolactin (PRL), Progesterone and Testosterone

915






Total =

13,237

10.13.2 Income

Tk.52,76,850/- (Taka fifty two lacks seventy six thousand eight hundred and fifty) only.



10.14 INSTITUTE OF NUCLEAR MEDICINE & ALLIED SCIENCES, COMILLA

This institute is equipped with one Dual Head SPECT camera, two RIA counter, Bone Mineral densitometry (BMD), Two Conventional ultrasound and one Color Doppler Ultrasound machine. The centre also has facility of Radio-iodine therapy for Hyperthyroidism and Ca-thyroid and -radiation in post surgery pterygium cases.



10.14.1 Routine Activities

Number of Paying Patients = 16201

Number of Free Patients = 155

Total Patients = 16356

Total Amount Received = Tk. 66,95,550/-.

10.14.2 New Activities


  • Tissue Banking.

  • Training (6 months) on Nuclear Medicine & Ultrasound.

III. ENGINEERING AND GENERAL SERVICES

1. ENGINEERING DIVISION, HQ
1.1 Objective

Bangladesh Atomic Energy Commission has been engaged in research and development (R & D) activities in the various fields of Nuclear Science and Technology in the country. Under the Charter of Bangladesh Atomic Energy Commission, Engineering Division (ED) has been entrusted with responsibility for installation, testing and operation of various scientific, nuclear and engineering equipments, facilities and building up & maintenance of physical infrastructures for smooth operation of R&D programs of BAEC. This division is also supposed to be a key responsible for installation, operation and maintenance of proposed 2000 MW Rooppur Nuclear Power Project (RNPP) at Rooppur, Pabna. Following activates already have been performed by Engineering Division during 2012-2013.

Following activates already have been performed by Engineering Division during 2012-2013.



1.2 Various ADP projects under implementation

  • Establishment of Radioactivity Testing and Monitoring Laboratory at Mongla, Khulna.

  • Establishment of positron Emission Tomography-Computed Tomography (PET-CT) with Cyclotron facilities.

  • Construction of 2000 MW Rooppur Nuclear Power Plant (First Phase).

  • Establishment of Institute of Nuclear Medical Physics, AERE, Savar.

  • National Data Centre (NDC) Project of CTBTO, Sitakundo, Chittagong.

  • Infrastructure Development and Capacity Enhancement of Institute of Food and Radiation Biology(IFRB), AERE, Savar

  • Establishment of Nuclear Medicine Centre & Sterile Insect Technique Unit at Cox’s Bazar.

1.3 Already completed projects under direct and indirect supervision

  • Establishment of Atomic Energy Centre Chittagong (1st revision).

  • Accomplishment of Essential Activities to Implement 600MW (e) Rooppur Nuclear Power (RNP) project, Pabna.

  • Upgrading of research and service facilities of nuclear medicine centres Bogra, Barishal, Khulna, Mymensingh, Rangpur and production of TC-99 KIT

  • Strengthening of Atomic Energy Research Establishment at Savar, Dhaka.

  • Extension of CNM&U (Centre for Nuclear Medicine & Ultrasound) Chittagong.

  • Extension of Nuclear Medicine & Ultrasound Center at Sylhet, Chittagong, Rajshahi and Dinajpur.

  • Modernization of Centre for Nuclear Medicine & Ultrasound Sylhet, Rajshahi, Dinajpur and Chittagong.

  • National Institute of Biotechnology (NIB) a Project of Ministry of Science and Information & Communication Technology at Ganakbari, Savar, Dhaka.

  • Bangladesh Atomic Energy Commission, Head Quarter Complex at Sher-e-Bangla Nagar, Dhaka-1207” Project.

  • Training Institute and Laboratories Facilities project

    • Tandem Accelerator Facilities project at AERE, Savar, Dhaka.

  • Completed the Vertical Extension of BAEC, HQ Bhaban project ( from 5th to 6th floor)

  • Modernization of Centre for Nuclear Medicine & Ultrasound Project, Chittagong

  • Modernization of Centre for Nuclear Medicine & Ultrasound, Mitford, Comilla & Faridpur Project.

  • Strengthening of Secondary Standard Dosimetry Laboratory (SSDL) Facilities, AERE, Savar.

  • Nuclear Medicine Centres Barisal, Khulna, Rangpur and Mymensingh.

  • Renovation of BSEC Cox’s Bazar and Upgradation of Pilot Plant.

  • Strengthening of Radiation Testing & Monitoring Laboratory, Chittagong.

  • Replacement of Damage Decay Tank of the Research Reactor at AERE,Savar.

  • Expansion and modernization of Research Facilities of Atomic Energy Centre Dhaka etc.

1.4 Works Completed

  • Design, drawing, procurement installation, repair and maintenance of air-conditioners of all institutes / centers / establishments located both in and outside of Dhaka.

  • Renovation/routine annual repair and maintenance works of Bangladesh Atomic Energy Commission Head Office, Dhaka, BAEC Housing Colony Banani, Dhaka & all other institutes / centers of BAEC in and outside of Dhaka.

  • Renovation work of Institute Building & ‘F’ type Residential Quarters of Beach Sand Exploitation Centre at Cox’s Bazar.

  • Repair and maintenance of 65 ton central air conditioning plant of Auditorium at BAEC, HQ.

  • Procurement & installation of local and foreign equipments/machineries/ spares for BAEC Head Office and 14 (fourteen) INMAS of BAEC.

  • Maintenance of 4’’ dia 465 feet depth deep tube well at Banani Housing Colony.

  • Design, drawing, procurement, installation, repair and maintenance of various scientific and engineering equipment at various establishment /centers /institute and BAEC, HQ.

  • Procurement, installation, testing, running, operation & maintenance of 250 KVA substations and other relative works at Beach Sand Minerals Exploitation Centre at Cox's Bazar.

  • Replacement of VCB (Vacuum Circuit Breaker) at IFRB, AERE, Savar.

  • Replacement of AVR (Automatic Voltage Regulator) of 10.5 KW generators at INMAS, Rajshahi.

  • Installation of foundation stone & related works for inaugural ceremony of "Construction of Rooppur Nuclear Power Plant project (1st Phase)".

  • Design, drawing, procurement, installation, repair and maintenance of fountain at AECD etc.

  • According to new design recast the water supply pipe line network system from pump house to overhead tank and overhead tank to different building and repairing of existing damaged sewerage pipe line at BAEC housing colony, Banani.

  • Renovation /repair and maintenance works of newly allotted and old allotted flat like C-type(old & new), D-type building, hostel building, annex building, guest house building, pump house, guard room, security shade, boundary etc at BAEC housing colony, Banani

  • Providing painting work outside of the existing C-type, D-type building, hostel building, guest house building, pump house, guard room, security shade including necessary dismantling and replastering of damaged cement plaster at BAEC housing colony, Banani.

  • Renovation (Acoustical) works of committee room at BAEC head quarter.

  • Repair and maintenance of various fire fighting and alarm system at BAEC, HQ.

  • Repair and maintenance of fountain at BAEC, HQ.

1.5 Services

  • Rendering various services related to repair & maintenance works (civil, electrical, mechanical & sanitary) of various facilities (Institutes/ Establishments/Centers) of BAEC.

  • Planning & designing services (civil, electrical, mechanical and sanitary) contributed to various facilities (Institutes/Establishments/Centers) of BAEC.

  • Providing technical expert services in various Centers/institutes/different projects of BAEC and other National Projects outside BAEC like

    • National Oceanographic Research Institute (NORI)

    • High Tech Park etc.

  • Taking necessary steps to find out technical problems in various facilities (civil, electrical, mechanical & sanitary) of centers / institutes / establishments of BAEC and taking of remedial measures.

  • Providing transport service including routine repair & maintenance of transports of BAEC transport pool.

  • Providing technical services to BAEC establishments / Centers / Institutes regarding civil, electrical, mechanical & sanitary works regularly in and outside of Dhaka.

  • vii) Responsible for implementation of CTBTO seismic auxiliary station-AS007, Bariodala, Chittagong, Bangladesh.

  • viii) Cleaning of existing ground water reservoir & overhead water tank at BAEC housing colony, Banani.

1.6 Preparing of Development Project Pro-forma (DPP)

This Division is directly contributing in preparation of Development Project Pro-forma (DPP) of various Development Projects of BAEC under Govt. ADP Program.



2. CENTRAL ENGINEERING FACILITIES, AERE

2.1 Introduction

The fundamental works of Central Engineering Facilities (CEF) in Atomic Energy Research Establishment (AERE) are to help all its institutions by providing all kinds of equipment as well as providing helps in their installation, repair replacement and maintenance needed in carrying out various R & D works. CEF has been taking care of the engineering facilities to be needed in AERE Campus. CEF is responsible for formulating all engineering related jobs as for example-designing, planning, installation, operation and maintenance of all facilities of AERE, the largest research complex of Bangladesh Atomic Energy Commission (BAEC). Power supply system, Gas system, water supply system, civil and sanitation system of AERE are the main lookouts of CEF. To fulfil the requirement of the R&D activities, the CEF is providing services for design, development, construction, technical support, implementation and maintenance of the infrastructures already developed at AERE. There are five divisions in the CEF and activities of each division during the reporting period are narrated in the sub-sections. In addition there is an on-going project under the CEF on solar energy utilization and development of related technology.



2.2 Mechanical Engineering Division

There are two section in the mechanical engineering division. The major activities of each section are given during the reporting period.



i) Mechanical Maintenance Section

Major activities of the Mechanical Maintenance Section

  • Repaired colony side pump 2A.

  • Repaired office side pump 2A

  • Repaired centrifugal pump 3c( ETA 80- 20) at colony

  • Repaired & Maintained of underground Water pipe line AERE

  • Painted fan , gates and other equipment in AERE office & residential area

  • Supply drinking Water Which use in different laboratories to the area of the office and residential area regularly

  • Operated & maintained deep-well turbine pump & other pumps regularly

ii) Air-Condition Section

Major activities of the Air-Condition Section

  • Installation work of 2 ton, 2 nos. Split type A/C for HPRWMU, INST at AERE

  • Installation Work of 3 ton, 1no. Split type A/C DG office at AERE

  • Seal type compressor installation, Repairing, Testing & Commissioning of Water chiller for Gamma Radiation (Co-60) Plant IRPT at AERE

  • General servicing around 60 nos. of window & 40 nos. split type A/c in all institute at AERE

  • Around 30 nos. of Refrigerator & Freeze have been repaired in different institute at AERE

  • Repaired Central air–conditioning plant in INST Auditorium (40ton)

  • Replaced around 20 nos. Compressor of freeze, window & Split type A/C in all institute at AERE.

  • Replaced around 8 nos. blowers of window & Split type A/C in all institute at AERE.

  • Repaired others Refrigeration system (cooling incubator, Dehumidifier etc).

  • Weekly operate & maintained central A/C of INST Auditorium.

2.3 Engineering Workshop Division

To carry out research and development activities, the engineering workshop division has been providing services for design, development and giving technical supports for implementation and maintenance of infrastructures of AERE.



Service Rendered

  • Planned and designed for workshop related work.

  • Repaired and maintained regularly of the existing AERE facilities based on demand.

    • Taken necessary steps to find out technical problems and to give out appropriate solution.

    • Designed and developed items & accessories required for research activities.

    • Performed machining, welding, sheet-metal works, carpentry works etc.

    • Managed repair and maintenance works related to door, window, furniture etc of AERE Office & AERA Colony.

Activities Conducted/Implemented

  • Drawing designed and fabricated a Rainfall Collector for Isotope Hydrology Division of INST.

  • Making contact for Mask using Thermal Evaporator for VLSI research.

  • Designed, fabricated and installation of wooden display board for TBBRU, AERE.

  • Drawing designed and fabricated a trolley for Tandem Accelerator Facilities Division of INST, AERE.

  • Drawing, designed and fabricated 164 nos of Led-Pot for Isotope carrying in different Centre for Nuclear Medicine & Ultrasound from IHD, INST.

  • Drawing designed and fabricated Mold for Shielding materials of Reactor and Neutron Physics Division of INST.

  • Drawing designed and fabricated a Rainfall Monitoring for HPRWMU of INST.

  • During the reporting period, this division has successfully completed job request of 35 nos. of machining work, 42 nos. of welding, 26 nos. of sheet-metal and 158 nos. of carpentry works received from different institutes of AERE.

2.4 Electrical Engineering Division

The following works have been completed by this division during the period from January 2013 to December 2013:



  • Supply, Installation and Repair/Maintenance work of IFRB 100 KVA sub-station at AERE, Savar, Dhaka.

  • Earthling device for Energy Institute at AERE, Savar, Dhaka.

  • Vertical extension (2nd and 3rd floor) of Officer Hostel (Electrical Estimate) at AERE, Savar, Dhaka.

  • Renovation Electrical works of Main Distribution Board (MDB) IFRB at AERE, Savar, Dhaka.

  • Electrical wiring of 60 KVA Diesel Generator connection from Generator room to SDB of TBBRU at AERE, Savar, Dhaka.

  • Renovation Electrical work of Hall-room ROMU at AERE, Savar, Dhaka.

  • Supply, Installation and Repair/ Maintenance work of IRPT 750 KVA sub-station at AERE, Savar, Dhaka.

  • Electrical renovation work in Insect Bio-technology division (Room No-211) at AERE, Savar, Dhaka.

  • Supply and Installation of 600 KVAR Power Factor Improvement (PFI) Plant CEF sub-station at AERE, Savar, Dhaka.

2.5 Civil Engineering Division

    • Construction of R.C.C Road in office area.

  • Construction of R.C.C Road in colony area

  • Construction of bituminous road in front of IFRB

  • Construction of master Drain in colony area

  • Construction of Tin Shed building beside anser Shed

  • Construction of Vertical Extension of Boundary wall From School gate to NIB border

  • Construction of Generator room of TBBRU

  • Repair maintenance of carpeting road in office area

  • Repair maintenance and painting work of ROMU, IFRB, CAD (partly)

  • Repair maintenance of Various quarters.

  • Rapair maintenance and painting works of ROMU

  • Bathroom modification work of ROMU

  • Screeding work of Reactor building.

Activities Conducted/Implemented

  • Designed, fabricated and installed repaired panel box for radio-isotope production division of INST, AERE.

  • Designed and fabricated mold of shielding materials for Reactor and Neutron Physics Division of INST, AERE.

  • Fabricated In-core irradiation safety experiment set-up for Reactor Operation and Maintenance Unit.

  • Repaired, maintained and fitting-fixing of Venetian blind of different laboratories of INST and IE.

  • Designed, fabricated and installed MS Framed laboratory table for NRC Division of INST.

  • This division has successfully completed job request of Machining work, welding, sheet-metal and carpentry works received from different institutes of AERE.

2.6 Engineering Design & Documentation Division

There is a Design & Documentation Division under the CEF. The main activities of this division is to design new buildings, wiring diagram of electrical substation, transmission, Plumbing & pipe fitting, gas line water supply line, generator installation, design & develop frame structure for installation of A/C etc.



Training Programme

The facility has so far been used to train up a total of 12 personal from Gopalgonj Polytechnic Institute, Patuakhali Polytechnic Institute & Alhaz Mokbul Hossain University Collage in different fields during the reporting period. The field is as follows.



Sl. No.

Name of Institution

Name of Trade

No. of Student

Total

1.

Alhaz Mokbul Hossain University Collage

Electrical

5

12


2.

Patuakhali Polytechnic Institute

Electrical

2

3.

Gopalgonj Polytechnic Institute

Refrigeration & Air-Conditioning

5

3. ENGINEERING AND GENERAL SERVICES DIVISION, AECD

Objective

The objective of the Division is to provide engineering and technical services to research & development activities of the centre. This division has following sections: Workshop section, Glass Blowing section, Electrical section, Draughting section, Air-conditioning section, Installation, Utility and Civil Engineering section to support divisional activities. This Division is also provides all utility services such as electricity, water supply, ventilation, air-conditioning, civil works etc. through the respective sections. Technical and expert services are provided to different Institutes/Division of BAEC and other National Scientific Educational Institutions in the country.



Brief Description of Work

During the reporting period this Division received 367 jobs requisition from different division of AECD, BAEC HQ, AERE and also other organization of the country. Besides the routine jobs involving the operation & maintenance of all utility services were done as usual.