Department of agricultural and rural development



Download 3.76 Mb.
Page3/10
Date02.06.2018
Size3.76 Mb.
#53009
1   2   3   4   5   6   7   8   9   10


Figure 1.3: reinforcement stones at upstream slope are broken completely



Spillway, is free spillway, the width is B=30m. length of spillway is 50m, dissipation yard at downstream is stone structure, downstream is accumulated (picture no.5).





Figure 1.4: Width of dam surface is narrowed; different dam elevations



Figure 1.5: Downstream area of dissipation yard is accumulated



Intake culvert, was built in 1990, culvert is broken now, seepage collar are damaged and lead to water lost. The valve of the outlet work intake have been broken and un-controllable (picture no. 6)
Service road: The road started at Son Loc bridge to Dam, L=845,4 m, width = 2,5m. Earth road, road surface is rough that leading to muddy in rainy season. Less population density along road. two sides of road are paddy field and crops land (picture 7, 8, 9, 10).

Figure 1.6: intake culvert is broken



Figure 1.7: Service road is wet in rainy season



Figure 1.8:: Location of service road (taken from satellite)



Download 3.76 Mb.

Share with your friends:
1   2   3   4   5   6   7   8   9   10




The database is protected by copyright ©ininet.org 2024
send message

    Main page