Doc PS Rev Rb Technical requirements (1) The technical requirements listed here
willapply
to the S range of Controllers, it is accepted that the S range has more capability and capacity than the S range, and these technical requirements
maynot
be met by the S, where there is a significant compromise or limitation in relation to the S range, this
shallbe identified in the design documentation.
Share with your friends: