Completion of wells
Well
interventions and workovers; and
Plugging, blocking, capping, or abandonment of any well whether temporarily or permanently. Fora well under
a Production Safety permit, activities that do not change the normal pressure containment boundary of the well or introduce wire, cable or hollow pipe into the well are not Well Work Activities and can be carried on pursuant to being included Production Safety Case. Examples of such designated petroleum activities include, but are not limited to
Production through
an existing completion
Formation stimulation operations where the pressure containment boundary is not altered, e.g. acidizing or chemical injection by bullheading; and
Well testing through an existing completion. If the above activities are being carried on from a
non-production installation as, for example, part of a well test, they would need to be included in the combination of the Well Work Safety Case and the Non-production Safety Case.