Emergency towing procedure


) EQUIPMENT FOR EMERGENCY TOWING OPERATION



Download 0.93 Mb.
Page7/7
Date07.04.2023
Size0.93 Mb.
#61068
1   2   3   4   5   6   7
BGPO-Emergency Towing Procedure V2
BGPO-TRA-MISC-001parceltransfer201908262137

12) EQUIPMENT FOR EMERGENCY TOWING OPERATION


A. For Seismic Ship

Items

BGP Explorer

BGP Innovator

Stanford Volga

Messenger Rope (at least Ф16mm):at least 50 meters x 1 pc

Yes

Yes

Yes

Main Tow Rope, at least Polypropylene 8 strand rope c/w soft eye both ends. Length 100~120m. Qty: 1 string. MBL: minimum 39,500 kgs

Yes

Yes

Yes

Heaving line or Line Thrower Appliance

Yes

Yes

Yes

B. For Towing Tug

  • Crest Radiant 5




Towing wire

Diameter 50.8 mm

Length 400 m

Emergency towing rope

Diameter 80 mm

Length 180 m

Messenger line:

Diameter 22 mm

Length 200 m



13) Break tow


In the event of an emergency towing situation where the Towing Tug experiences difficulties and is required to break the tow, the following procedures should be followed:



  • The Tug Master shall immediately inform the Seismic Ship Officer of the Watch (OOW) and request a broken tow.

  • The seismic ship crew should stand by on the bow and prepare to lift the Tow rope off the bollard once the rope is not on tension.

  • The Seismic vessel crew will signal the Towing Tug to release Rope tension.

  • Upon receiving the "GO" signal from the Seismic Ship, the Towing Tug shall ease the tension and allow the seismic ship crew to remove the Towline from the Bollard.

  • The Towing Tug should then retrieve the tow line.

  • It is essential that all personnel involved in the emergency towing operation remain vigilant and maintain clear communication throughout the procedure. The safety of all personnel involved should always be the top priority.