Flood/Storm Hazard Mitigation Strategies




Flood/Storms Long Term Mitigation

Hazard:

Flood/Storm #1

Action Item:

Support Orange County Public Works, Flood Control Division and City of Huntington Beach in finding funding for C05 E.G.G. Wintersburg Channel – Including Tide gates to 4,000’ d/s Graham

Coordinating

Organization:

CCCD Facilities Division



Description

The length is approximately 2800’ (southerly side only). The ultimate improvement is

currently in the design process.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2015-2016

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property

CCCD Sites Impacted

Golden West College



Hazard:

Flood/Storm #2

Action Item:

Support Orange County Public Works, Flood Control Division and City of Huntington Beach in finding funding for C05 E.G.G. Wintersburg Channel – 4000' d/s of Graham to u/s Graham

Coordinating

Organization:

CCCD Facilities Division



Description

The existing geometrics of this channel is a trapezoidal channel (120-ft to 70-ft) base width)

lined with riprap. This channel will ultimately be improved as a rectangular channel,

soft bottom, with vertical wall soil-mixed columns armored with sheet piles on

both sides of the wall. The length is approximately 4,000 ft (southerly side only)

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2009-2010

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property

CCCD Sites Impacted

Golden West College



Hazard:

Flood/Storm #3

Action Item:

Support Orange County Public Works, Flood Control Division and City of Huntington Beach in finding funding for C05 E.G.G. Wintersburg Channel – u/s Graham to u/s Warner

Coordinating

Organization:

CCCD Facilities Division



Description

The existing geometrics of this channel is a trapezoidal channel lined with riprap. This

Channel will ultimately be improved as a rectangular channel, soft bottom, (146-ft wide)

with vertical wall soil-mixed columns armored with sheet pile on both sides of wall.)

The length is approximately 2,600 ft.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2009-2010

Constraints:

The CCCD has no official authority and no means of assisting financially

Plan Goals

Protect Life and Property

CCCD Sites Impacted

Golden West College



Hazard:

Flood/Storm #4

Action Item:

Support Orange County Public Works, Flood Control Division and the City of Huntington Beach in finding funding for C05 E.G.G. Wintersburg Channel – u/s Warner to d/s Goldenwest

Coordinating

Organization:

CCCD Facilities Division



Description

The existing geometrics of this channel is a trapezoidal channel lined with riprap. This

Channel will ultimately be improved as a rectangular channel, soft-bottom, (146-ft wide)

with vertical wall soil-mixed columns armored with sheet piles on both sides of wall.)

The length is approximately 5,200 ft.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A.

Time Line:

FY 2010-2011

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property

CCCD Sites Impacted

Golden West College



Hazard:

Flood/Storm #5

Action Item:

Support Orange County Public Works, Flood Control Division, City of Huntington Beach and the City of Westminster in finding funding for C05 E.G.G. Wintersburg Channel – Confluence with Oceanview Channel (C06) to d/s Beach

Coordinating

Organization:

CCCD Facilities Division

Description

The existing geometrics of this channel is a trapezoidal channel lined with riprap.

This channel will ultimately be improved as a concrete lined rectangular channel,

(60-ft wide). The length is approximately 2800 ft.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2012-2013

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property

CCCD Sites Impacted





Hazard:

Flood/Storm #6

Action Item

Support Orange County Public Works, Flood Control Division, the City of Huntington Beach and City of Westminster in finding funding for C05 E.G.G. Wintersburg Channel – u/s Beach to d/s Woodruff

Coordinating

Organization

CCCD Facilities Division

Description

The existing geometries of this channel is a trapezoidal channel lined with riprap.

This channel will ultimately be improved as a rectangular concrete lined channel, (60-

ft wide). The length is approximately 2200 ft.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2013-2014

Constraints

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property

CCCD Sites Impacted

  • Golden West College

  • Coastline OC Regional One Stop Center Westminster

  • Coastline Community College Le-Jao Center








Hazard:

Flood/Storm #7




Action Item:

Support Orange County Public Works, Flood Control Division, the City of Westminster and City of Fountain Valley in finding funding for C05 E.G.G. Wintersburg Channel – Quartz to Bushard




Coordinating

Organization:

CCCD Facilities Division

Flood Control Division






Description

The existing geometrics of this channel is a trapezoidal channel (=30-ft base width)




lined with riprap/concrete. This channel will ultimately be improved as a rectangular channel,




Concrete lined, one-fourth of the downstream reach varies in width 44-ft to 60-ft and three-




fourths of the upstream reach is 50-ft wide. The length is approximately 4,200 ft.




This project is located in an identified FEMA Special Hazard Flood Area, Zone A




Time Line:

Qualified Future Projects Beyond FY 2015-2016




Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project




Plan Goals

Protect Life and Property




Addressed:

City of Westminster, City of Fountain Valley

CCCD Sites Impacted

  • Golden West College (downstream)

  • Coastline OC Regional One Stop Center in Westminster

  • Coastline Community College Le-Jao Center in Westminster

  • Coastline Administrative Center in Fountain Valley





Hazard:

Flood/Storm #8

Action Item:

Support Orange County Public Works, Flood Control Division and the City of Garden Grove in finding funding for C05 E.G.G. Wintersburg Channel – (C05B02/C05PS1) Haster Retarding Basin & Pump Station

Coordinating

Organization:

CCCD Facilities Division



Description

This segment of the channel system exists as a retarding basin. It will ultimately be

regraded and a new pump station will be constructed to regulate the flow.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2010-2011

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property


CCCD Sites Impacted

  • Golden West College (downstream)

  • Coastline OC Regional One Stop Center in Westminster (downstream)

  • Coastline Community College Le-Jao Center in Westminster (downstream)

  • Coastline Administrative Center in Fountain Valley (downstream)

  • Coastline Community College Garden Grove Center



Hazard:

Flood/Storm #9

Action Item:

Support Orange County Public Works, Flood Control Division and the City of Garden Grove in finding funding for C05 E.G.G. Wintersburg Channel – 300’ d/s Haster to 800’ u/s Lampson

Coordinating

Organization:

CCCD Facilities Division

Description

The existing geometrics of this channel is a single-cell, reinforced concrete box

culvert (9-ft wide by 6-ft high). The ultimate improvements shall include the addition

of a single-cell RCB of same dimensions. The length is approximately 1150 ft.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2013-2014

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property


CCCD Sites Impacted

  • Golden West College (downstream)

  • Coastline OC Regional One Stop Center in Westminster (downstream)

  • Coastline Community College Le-Jao Center in Westminster (downstream)

  • Coastline Administrative Center in Fountain Valley (downstream)

  • Coastline Community College Garden Grove Center


Hazard:

Flood/Storm #10

Action Item:

Support Orange County Public Works, Flood Control Division, City of Huntington Beach and City of Westminster in finding funding for C05S01 Newland Storm Channel – C05 Channel to u/s McFadden Ave

Coordinating

Organization:

CCCD Facilities Division

Description



The existing channel-culvert was designed for a 25-year storm event and constructed in the

1960’s. The proposed project consists of making improvements to this hydraulically deficient

channel to convey a 100-yr storm event without overtopping. The proposed design is a reinforced

Reinforced concrete rectangular channel with wall heights ranging from 6 ft to 11 ft high.

The width is 26 ft throughout the 3,800-ft long reach. Three roadway under crossings will be

improved; two of which will maintain the existing cell (Carnegie Ave, Palos Verdes Ave).

The additional RCB’s are 4.75-ft wide by 7-ft high on both sides of the existing structure.

The last Undercrossing, Edinger Ave, will be removed and completely improved to a

double barrel 14’x6.75’ RCB.

This project is located in an identified FEMA Special Hazard Flood Area, Zone A

Time Line:

FY 2011-2012

Constraints:

The CCCD has no official authority and no means of assisting financially; however, the CCCD can offer our political support for securing grants for the project

Plan Goals

Protect Life and Property

CCCD Sites Impacted

  • Golden West College

  • Coastline OC Regional One Stop Center Westminster

  • Coastline Community College Le-Jao Center






Download 0.86 Mb.

Share with your friends:
1   2   3   4   5   6   7   8




The database is protected by copyright ©ininet.org 2024
send message

    Main page