MOUCHLY.
Snapshots from Jacob Mouchly. 70:10.
Notes on the photos. 71:06:(d).
MUSEUMS (HAIFA EAST etc.).
Signal frame from Qishon. 70:04:(v).
Tower Of David exhibition. 70:08:(d).
Theft of 6wh. tank wagon from Tel Hanan. 71:04:(b):(i).
Acquisition of 120T Well Wagon. 71:04:(b):(ii).
Acquisition of P-Class tender from No. 62. 71:04:(b):(iii).
Acquisition of shunting tractor from Qishon Works. 71:04:(b):(iv).
Opening times and restoration work. 72:04:(vi).
More on 120T well wagon. 72:07:(k).
Note on museums along Rakevet HaEmek. 75:07:(a).
Photo of tender for P-Class 62. 76:03.
Photo of SR Co-Co 163. 76:08a.
Eilat Museum (n.g. tubs.) 81:12.
Project for Museum at Beer-Sheva Old Station. 87:08.
NA’AN. (See also HaMeniya).
Article on n.g. line to Kibbutz orchard, and PR station. 76:09, 76:10.
Doubling from Lod. 87:05:(x).
NAHARIYYA.
Pedestrian bridge being built. 73:04:(vii).
Doubling from Kiryat Motzkin. 81:04:(i).
More on doubling 87:04:(xiii).
NAZARETH. (See also Jezreel Valley).
Proposal for line to Nazareth. January 2007. 75:03:(t).
Further notes on Haifa - Nazareth plans. 76:04:(k).
NEGEV.
DGEG spcial train at Ramat Hovav. Nov. 2004. 80:03
NETIVOT.
Tender for Beer Sheba - Netivot line. 70:06:(ix).
Further Tender for Beer Sheba - Netivot line. 72:05:(viii).
‘NEWS FROM THE HOLY LAND’
German reports, 1892. 79:10.
OBITUARIES.
Ja’akov Wahrman. 70:08:(o).
Paul Cotterell. 77:01, 03 etc.
Robert Richardson. 77:07:(e).
Pesach Zel. 79:07:(k).
Richard Bowen. 85:07:(d).
OFAKIM.
Corner stone for new sation laid. January 2007. 76:04:(e).
OMAN.
Tourist railway & 76cm. gauge railcar. 74:08:F.
Part of international plan. 83:07:E:().
ORENSTEIN & KOPPEL.
Berlin factory closure, 1981. 77:07:(c).
OTTOMAN PERIOD. (General).
Report on Kaiser Wilhelm’s visit, 1898. 71:06:(k).
Report on Titus Salt’s visit, 1871. 74:11.
PALESTINE.
Scheme for high speed rail link. July 2005. 71:07:G.
Transport Cooperation Agreement with Israel Sept. 2005. 71:04:(g).
‘Palastina’ in South America. 71:06:(j).
Participation in international railway conference. 2005. 72:04:(viii).
Possible branch line to Ramallah. 72:04:(xiv).
‘Palestine, Texas’. Railroad notes. 72:07:(h), & possible closure 78:09:(a).
Scheme for Gaza - West Bank line. 72:08:F.
Rails at Arafat’s tomb, Ramallah. 79:07:(i).
‘Palestine, Texas’. Line has been reprieved. 80:07:(a).
PALESTINE RAILWAYS.
1930’s Armoured Trains. 70:08:(e).
1933 Closures and former Halts. 70:08:(h).
Steam Rollers. 70:08:(q).
Coal Supply problems in 1943. 70:14.
Arthur Kirby’s 1948 article. 70:16.
Note on 1933 closures. 71:06:(e).
Derailments and incidents in 1944. 76:07:(b).
PR Trolleys 1944. 78:11.
Incident with brake van near Gaza, 1945/6. 80:07:(c).
Film from 1930. 84:07:(g).
Sabotage 1936, 1939. 85:09.
Train caught in Sandstorm, Sinai, March 1944. 85:12.
Arrival of Lotte Cohen at Tel Aviv, 1920’s. 86:08:(e).
Experiences of Viennese sports team, 1935. 86:08:(g).
PAT’EY MODI’IN. (and see also MODI’IN).
Photo of first passenger train, 2007. 78:13.
Press run report. 79:04:(b).
PETAH TIKVA.
Opening of Kiryat Arieh. (See Kiryat Arie.)
PERSIA. See Iran.
PHOTOGRAPHY.
Permits on IR. 2007. 77:07:(b).
Editorial Rant on problems with security men, Feb. 2009. 84:02.
PURIM.
Photo of Purim Parade in Tel Aviv, 1937. 84:14.
QATAR.
Feasibility study for ‘Transrapid’ maglev line. 2006. 73:08:H.
Deutsche Bahn to assist in rail development. 84:08:D.
RAFA.
Lifting of Rafa - Beersheba Line. 1927. 70:09.
File on Closure of Rafa-Beersheba Line. 77:11.
RAILSIM.
Further notes. 70:08:(p).
RAKEVET HA’EMEK. See Valley Railway.
RAMALLAH.
Proposal for branch line. 72:04:(xiv).
Rails at Arafat’s Tomb. 79:07:(i).
RAMAT HOVAV.
DGEG special train Nov. 2004. 80:03.
RAMTA. (See also Rolling Stock.)
Progress on construction of Double-Deck trains. 72:04:(xxii).
.
REVIEWS.
DVD “The World’s Greatest Railway Journeys,
Tunisia & Israel. 74:09.
“The Desert Railway”, Brandon Judd. WDR & WDER. 76:12.
“World Rail Atlas - Middle East & Caucasus.” 77:08.
Hedjaz Railway video. 78:08:(G):(i).
Book “The Israel-Arab Reader”. 81:08:(d).
‘On Chariots with Horses of Fire and Iron’, Tony Travis. 84:07:(a) (& notes 86:08:(b) & 87:11:(iii).)
Amateur 1930 film incl. ESR and HR scenes. 84:07:(g).
RISHON LE-ZION & LINE FROM TEL AVIV.
Contracts for line Rishon West-Ashdod. 70:04:(l).
Contracts for line Tel Aviv - Rishon. 70:04:(l).
Tender for contracts, Rishon-Ashdod line. 70:06:(v).
Tender for bridges on line. 71:05:(v).
Decauville in wine cellars, 1916. 71:06:(q).
Progress on line to Rishon West. Nov. 2005. 72:04:(xv).
Construction work on flyovers from Ayalon line. 73:04:(v).
Tender for work on line. Yoseftal-Dayan. 78:05:(i).
Tender for construction of Rishon West - Ashdod line. 79:05:(v).
Former Silicates industrial line. 80:11.
Tender for infrastructure work Tel Giborim-Wolfson. 82:05:()
Wolfson Suburban station. Tender issued Sept. 2008. 82:04:(y).
Tender for Holon-Wolfson Station granted. 84:04:(e).
Progress on line, March 2009. 85:04:(g).
Progress on line. July 2009. 86:04:(vii) & Pelshet Junc.(xvii).
Photos of works, Yavneh West. 87:07.
Tracklaying near Rishon West. 87:09.
‘Shortest piece of line’ with wagons. 87:07.
ROLLING STOCK, I.R.
IAI/Ramta - Bombardier Joint Agreement. May 2005. 70:05:(a).
IC3 sets 46 & 47 arrive. July 2005. 70:05:(b).
G12 111 to be scrapped. 70:05:(c).
Locos sold to Texas. 104,109, 127, 128, 129, 251. 70:05:(d).
Photo of loading. 70:18.
PR Coach at Beit Aharon. 70:08:(m).
Scrapping of SAFB 103 & Esslingen 221. 71:04:(c).
New double-deck coaches arrive. Oct. 2005. 71:04:(s).
Ramta/Bombardier pictures, 71:13.
Ramta works handover of Double-Deck coaches. 72:04:(xxii).
Siemens wins bid for single-deck coaches. 72:04:(xxiii).
3 Alstom coaches shipped to Spain for repairs. 72:04:(xxiv).
‘Foreign’ wagons on IR. 72:04:(xxxviii).
New double-deck coaches with disabled facilities. 72:04:(xlv) & 73:04:(ii)..
Tender for 75 new container flat wagons. 72:05:(v).
Note on possible purchaser of former IR locos. 72:07:(l), & 74:06:(c).
Arrival of Bo-Bos 767-768, 769,770 & coaches. 73:04:(i).
IC3 21 returned from repairs. 73:04:(i).
Supply of 2nd.-hand French container flats. 73:04:(i).
86 coaches ordered from Siemens. Option for up to 585. 73:04:(iii).
G12 108 on Haifa Port turn. 73:04:(iv).
Proposed Siemens single-deck push/pull sets. 74:01.
New stock enabling 5-coach Double-Deck sets,
withdrawal of ex-SNCF coaches,
jiggling of Alstom push/pull rakes after withdrawals 74:03:(vi):(k).
LMS 2-8-0 70414 & Film. Notes. 74:06:(i).
Alstom is now Vossloh. 74:06:(e).
Photo of burned-out coach. 75:01 & 75.04..
Ex-SNCF coaches condemned, August 2006. 75:04:(i).
Tender for sale of ex-SNCF coaches. 75:05:(x).
IC3 set 31 condemned after Revadim accident damage. 75:04:(ii).
Coaches 76 & 625 burned out, Haifa East. Jan. 2007. 75:04:(iii).
Push-Pull coaches repaired in Spain. 75:04:(iv).
Scheme to purchase WD steam locos in 1952-53. 75:07:(b).
Graffiti attack on Track recorder 832. 76:04:(g).
Jumbo Co-Co 602 livery notes, February 2007. 76:04:(h).
Statistics, End 2006. 77:04:(o).
Competition June 2007 to choose liveries for new stock. 79:04:(c).
Delays to Siemens stock delivery. 79:04:(v).
Note on Fiat railcars - abortive purchase. 79:07:(h).
Siemens coach delivery delay, & photo: 81:03 & 81:4:(a).
First Coaches delivered. June 2008. Technical problems. 82:04:(a).
Siemens coaches in Austria. (Photo.) 83:03.
Note on Double-Deckers. 83:10:().
Siemens coaches being unloaded at Ashdod. 84:01.
Notes on ROD 2-8-0’s. 84:07:(c).
Unloading Siemens coaches. 84:01.
Numbers for Siemens coaches. 84:04:(t).
Options and tender problems for more Double-Deck stock. 84:04:(o).
Siemens stock into service. 85:04:(e).
IR use of steam/diesel double-heading, 1956. 85:13.
Permanent Way machine at new Haifa depot. 85:14.
Siemens train in use. (photo). 86:01.
Former IR diesels 127 & 251 in USA. (photo). 86:10.
Yugoslav coach stabled at Bnei Beraq. 86:03a. (plus photo)
Impressions of Siemens coaches in operation. 86:04:(xxi).
Locos and Rolling Stock built in Germany in 1950’s. 87:11:(iv).
End of Slam-Door coaches on IR, 17.09.2009. 87:11:(vii).
Fate of Loco-Hauled Coaches. 87:04:(xxx).
Note on Austrian involvement in Siemens coach construction. 87:04:(v).
Scheme for new Rolling Stock Maintenance hubs. 87:04:(xix).
Possibility of purchase of more push/pull trains. 87:04:(xx).
Tenders for more Diesel locomotives. 2009. 87:04:(xx).
Tenders for more Double-Deck Coaches. 87:04:(xx).
ROMANIAN LOCOS FOR MIDDLE EAST.
Note, Feb. 2009. 85:08:F.
SABOTAGE.
Sabotage on Beer Sheba line,1956. 70:11.
Sabotage on Palestine Railways, 1936 & 1939. 85:09.
SAFETY & SECURITY. (See also Level Crossings).
System checking scheme. 2005. 70:04:(m).
Security systems contract. 71:04:o).
Report on Safety - Touchstone Renard - to be implemented. 71:04:(t).
Instructions on Level Crossing Safety, May 2006. 73:04:(xxi).
Tender for Luggage Scanning Machines. 79:05:(iv).
Collision Avoidance & Alert system. 2008. 83:04:(f).
SALT, TITUS.
Report on Visit to Egypt and Palestine,. 1871. 74:11.
SANDSTORMS.
Train caught, March 1944. 85:12.
SAUDI ARABIA.
Infrastructure modernisation bid. 72:08:G.
Argument over demolition of HR bridge in Medinah. 74:08:E.
Plans for expansion of system. 75:08:G.
Note on rail network expansion. 76:08:G.
Possible purchase of Romanian company. 78:08:H.
Russians win tender to build north-south line. 80:08:G.
High-speed line Mecca/Medina – Riyadh announced. 82:08:B.
Al-Madinah Railway Museum. 83:07:B:(i).
New line to link Red Sea and Persian Gulf. 83:07:B:(ii).
Four Croatian 2063 Locos sold. 83:07:B:(iii).
Plans for new network. 83:07:E.
HR Museum at Medain Salih. 2008. 85:08:C.
Siemens signalling & telecommunications equipment. 86:07:F:(i).
New high.speed lines planned Mecca – Jeddah – Medina. 86:07:F:(ii).
Mass conversions to Islam of Chinese rail workers. 86:07:F:(iii).
Knorr-Bremse supplying Metro in Mecca. 86:07:F:(iv).
SLM WINTERTHUR.
Current situation and history. 87:11: (ii).
SDEROT.
Work on line from Ashkelon commences. 72:04:(xl).
SEJED
Note on former station. cf. 51:11, 52:5:(h). 72:07:(g).
SHELLAL.
WW1 Bridge intact. 70:08:(b).
SILICATE BRICKWORKS.
Tel Aviv & Rishon LeZion, N.g. Loco. 80:11.
STEAM/DIESEL COMBINATIONS ON IR.
Article on 1956. (Cotterell). 85:13.
SYRIA. (See also Hedjaz).
Loco plinthed at Latakia. 72:08:D:(vi).
Article on C.F.S. 2000. 72:08:D:(vii).
DGEG Railtour Plan. 74:08:D.
Coach preserved at Cadem. 75:13.
New CFS diesel multiple units from South Korea. 75:08:E:(i).
Programme for DGEG Tour February 2007. 75:08:E:(ii).
Photo of CFS Co-Co 751 at Damascus 76:01.
Notes from DGEG railtour. 76:08:C.
New Korean diesel multiple units. 78:08:(E):(i).
History of SGP Railcars. 78:08:(E):(ii).
Notes on February 2007 DGEG Tour. 79:08:F:(i) & (ii).
Photos of Damascus Kanawat rebuilding. 79:09.
Notes from RTC Tour Oct. 2007. 80:08:A.
End of Damascus – Amman international service. 83:07:C:(i).
Far Rail Special steam charters. 83:07:C:(ii).
Damsacus tunnel and repair of Romanian locos. 83:07:C:(iii).
Globotrain tour Istanbul – Damascus 2009. 83:07:C:(iv).
Railway Holiday in Syria, 2008. (‘Fern Express’, M. Hille.) 84:09.
CFS Motive Power – complete tables. 84:12.
Goods traffic commences to Iraq May 2009. 86:07:H:(i).
Revised passenger service to Turkey. (No ‘Toros Express’). 86:07:H:(ii).
Website wth photos, and article in ‘EK’ 1/2010. 86:10.F.
SYRIA-OTTOMAN RAILWAY.
Construction attempts in 1890’s. 70:15.
Notes on the document. 71:06:(b).
Note on Tzomet Jelameh bridge. 71:06:(c). (& 70:08).
Article in ‘Et-Mol’. (Hebrew). 72:07:(j).
TEL AVIV. (See also Light Railway Schemes.)
Haganah Station construction of Plats. 3 & 4. 70:04:(u).
Hashalom Station upgrade. 72:04:(xvi).
Work on flyovers for Rishon line at Haganah. 73:04:(v).
Ayalon line, 4th.track proposed. 75:03:(n).
El Al office at Merkaz Stn. closed. 75:03:(o).
Tender for rebuilding of Haganah station Phase 3. 76:05:(x).
Tender for new building at Savidor. 76:05:(xix).
MegaTrain approaching Tel Aviv station. 82:01.
Purim Parade 1937. 84:14.
Lotte Cohen arriving, 1920’s. 86: (See Pal. Rlys.)
TEL SHARIA.
Disposal, 1926. (Paul Cotterell) 87:11a.
TENDERS. (When not covered elsewehere.)
Definitions. 70:06.
Change of tendering procedures. January 2007. 75:05:(i).
Archaeological excavations on new alignments, 2007. 77:05:(ii) & (iii) & (iv).
Catering trolleys at Binymaina, Pardess Hanna, Patei Modi’in. 77:05:(v) & (vi).
Passenger Information System for IR. 2007. 78:05:(iii).
Automatic ticketing and fare collection systems. 78:05:(iv).
Ultrasonic Rail Flaw Detection Vehicle. 78:05:(v).
Convenience stores at various stations. 78:05:(ix).
Lineside fencing in North of country. 80:05:().
Taxi stands at 12 stations. 80:05:(ii).
Repair of IC3 Transmissions. 80:05:(iii).
Provision of crossing timbers. 80:05:(iv).
New LC for garbage trucks, Petah Tikva Segula. 80:05:(v).
Upgrading Yavne East station. 80:05:(vii).
Sound.proofing on Kiryat Motzkin - Nahariyya line 81:05:(i).
Manpower services. 81:05:(ii).
Taxi services, Beit Yehoshua. 81:05:(iv).
Watchmen for level crossings. 81:05:(vii).
Renting old station buildings. 2009. 86:06:(iii).
Double-tracking& relaying Akko – Nahariyya line. 86:06:(vi).
Franchises for cafes, cash dispensers, cigarette machines. 86:06:Various.
Double-tracking Akko – Nahariyya line. 87:05:(i).
Planning new complex at Lod. 87:05:(ii).
Taxi service at Tel Aviv Savidor. 87:05:(iii).
Doubling Yad Mordechai – Netivot. 87:05:(iv).
Construction of bridges, Ashkelon – Beer-Sheva line. 2009.87:05:(v).
Doubling works Lod – Na’an. 2009. 87:05:(x).
Bridge Surveys. 87:05:(xi).
Share with your friends: |