Index harakevet part issues 70 87



Download 451.31 Kb.
Page2/5
Date19.10.2016
Size451.31 Kb.
#4901
1   2   3   4   5
HAIFA.

Haifa East Station repainting. May 2005. 70:04:(f).

Pollution at Diesel Depot. 70:04:(w).

Tender for works at Haifa East depot. 70:06:(ii).

Tender for construction at Qishon works. 70:06:(iii).

Historical notes. 70:08:(f).

Dispute with British Army, June 1948. 71:11.

Haifa Diesel Depot, night-time view. 71:14.

Haifa East - official opening date confirmed. (cf. 68:6). 72:07:(c).

Haifa East - more re-roofing at museum offices. 75:03:(f).

Haifa Central Station to be renamed “The Eight”. 77:04:(b.

Haifa Central renamed July 2007. 78:04:(f).

Road bridges being built north of Haifa 2008. 83:04:(i).

Plan to privatise Port. 86:04:(xv).
HAR TUV.

Mysterious boiler found. 84:10.
HAMENIYA LOCO.

Loco rediscovered at Kibbutz Na’an. 76:09.

1938 Article on loco. 76:10.

Colour photo of remains. 76:16.

Note on rails at Kibbutz Na’an. 77:07:(f).

Possible second loco & photos of remains. 79:07:(c), & rear cover.

Second loco – a false trail. 82:07:(d).
HARTMANN, RICHARD.

Biographical notes. 85:07: (a).

Hartmann locos in Indonesia. 86:08:(c).
HEDJAZ RAILWAY. (See also Jordan, Syria, Aqaba.)

Conference to be held at Haifa University, December 2005. 70:04:(t).

Notes on Yarmuk Gorge bridges. 70:08:(a).

T.E.F.S. Farewell Tour, June 2006 - Programme. 71:07:H:(a).

Article on journey Amman-Damascus, July 2005. 71:07:H:(b).

New book by James Nicholson. 71:07:H:(c).

Demolition of old bridge at Medina. 71:07:H:(d).

Rumours of Closure. October 2005. 71:07:H:(e).

GE Diesel shunting at Amman 1999. 72.01.

Report on 2000 LCGB Trip. 72:08:B:(i).

Note on Amman visit & museum. Sept. 2005. 72:08:C:(i).

Amman - Dera’a International Services. 72:08:C:(ii).

Query on post-war rolling stock. 72:08:C:(iii).

BBC World radio feature. 72:08:C:(iv).

Damascus Station report. 72:08:D:(i).

Cadem Works report. Aug. 2005. 72:08:D:(ii).

El Hame report. 72:08:D:(iii).

Dera’a report. 72:08:D:(iv).

Dera’a - Cadem trip report. 72:08:D:(v).

Article from ‘Lok Report’ 8/2000. 72:08:D:(vii).

Hartmann 2-8-0 at Gasim, Oct. 2005. 73:01.

RTC Tour October 2005. Report on locos. 73:08:B & C.

Bill Alborough’s Preparation Tour. March 2006. 73:08:D.

Gesher, photo of stock on bridge. 73:10.

Last HR train in Israel, 1951/2. 74:06:(g).

Demolition of old HR bridge in Medinah. 74:08:(E).

Photo of Hartmann 2-8-2 in Syria, 1980’s. 75:01.

Web site. (Nabataea.net). 75:07:(e).

Last HR Train on Afula Line? Line opened August 1951. 77:07:(d).

Junction Station in 1912 & WW1. (Nahal Soreq). 77:10.

Video Review. (American). 78:08:(G):(i).

Chinese proposal to rebuild and electrify. 2007. 78:08:(G):(ii).

Notes on February 2007 DGEG Tour. 79:08:E:(i) & (ii).

Photos of Damascus Kanawat rebuilding. 79:09.

Notes on Cadem & RTC Tour, Oct. 2007: 80:08:A, B.

TEFS Tour Reports of 2006 & 2007, by Andy Wilson. 80:08:H.

Photos of Damascus Kanawat & Interior. 80:13.

HJR Pacific 85 in new livery. 81:01.

Project for new LRT line Amman-Zarqa. 81:07:D.

Globotours proposed tour, Sept. 2008. 81:07:E.

International Park at Naharayim proposed. 81:08:(b).

Museum at Kfar Yehoshua opens June 2008. 81:08:(c).

Photo of Hartmann 2-8-2 in Yarmuk Gorge. 83:01.

Report of Far Rail Tour October 2007. 83:07:A:(i).

Planned ‘Globotrain’ Tour Oct. 2009. 83:07:A:(ii).

Museum at Medina 83:07:B:(i).

Full Steam Ahead” – Swiss newspaper article. 84:13.



Water trains proposal, ca. 2000. 84:07:(d).

1930 Film with HR scenes. 84:07:(g).

1908 ‘Geographical Journal’ article. 85:11.

Notes on Richard Hartmann & Loco Works. 85:07:(a).

Museum at Medain Saleh. 85:08:C.

Hartmann 2-8-2’s in Indonesia. 86:08:(c).

Jung 2-8-2’s in Brazil, similar to HR type. 86:08:(d).

Globotrains tour planned, Oct. 2010. 86:07:I.

Situation of SLM Works, 2009. 87:11:(ii).

Phantasrail Website showing photos. 87:10:G.
HOFFMAN & SONS, FOUNDRY. TEL AVIV.

Article on Decauville stock built. 1930’s. 77:12.

Catalogue Pictures & Notes. 79:07:(b) & 79:
HOLOCAUST MEMORIAL WAGONS.

Destruction of memorial at Verden. Jan. 2007. 76:07:(a).

Yad Vashem exhibits. 84:07:(e).
IC3 SETS.

Sets 46 & 47 arr. July 2005. 70:05:(b).

Sets at Ramta works. 71:13.
INDUSTRIAL RAILWAYS.

Survey of all known sites to date. (157). 72:07:(l).
INFRASTRUCTURE WORKS. (See also Doubling, Electrification.)

Works on various lines, summer 2008 82:04:(g).

Tel Aviv – Nahariyya – May 2008. 82:04:(g).

Kiryat Motzkin – Nahariyya Sept. 2008 82:04:(h).

Na’an – Beer-Sheva Sept. 2008. 82:04:(h).

Na’an – Beit Shemesh Sept. 2008. 82:04:(h).

Works on Rishon LeZion line. 82:05:().

Works to Beer-Sheva, Negev, Naharyiyya. 84:04: (h),( r),(s).

Works on main line, March 2009. 85:04:(c).

Trackwork at Tel Baruch. 85:01.

Beer-Sheva line. 85:04:(d).

Progress on Holon - Yavneh line. 85:04:(g).

Tender for doubling Na’an – Beer-Sheva line. 85:05:(ii).

Relaying at Tel Baruch, 2009. 85:01.

Permanent-Way machines at new Haifa P-Way Depot. 85:14.

New pedestrian subways near Bnei Beraq. 86:04:(i).

Thefts of copper cables. 2009. 86:04:(ii).

Beer-Sheva line works. 86:04:(v).

Rishon Line progress. 86:04:(vii).

Nahariyya line works. 86:04:(ix).

Approval of Jerusalem A1 route. 86:04:(x).

Reconstruction & Reopening of Yavneh East, Sept. 2009. 86:04:(xiii).

New bridge at Netanya. 86:04:(xvi).

Ayalon Corridor to Peleshet Junc. 86:04:(xvii).

Rishon line and Yavne East and West stations Sept. 2009 87:07.

Works in Tel-Aviv area. 87:04:(i).

Works on Beer-Seva line, oct. 2009 – Jan. 2010. 87:04:(ii).

More on Jerusalem A1 line. 87:04:(iv).

Works Haifa – Nahariyya and Beit Shemesh – Jerusalem. 87:04:(xiii).

Plans for Southern line Ashkelon – Ofakim - Beer-Sheva. 87:04:(xv).
INNOTRANS 2007.

Preliminary announcement. 76:07:(c).

Notes from 2008 Visit. 82:07:(g).
INTERNATIONAL.

International Railway Conference, December 2005. 72:04:(viii).
IRAN.

Paradiso 4-car d.m.u. on trial in Austria. 70:01

Depot scene at Tehran - former BR/WYPTE railbuses. 71:1.

Kerman-Bam line opened December 2004. 71:07:B:(i).

Romanian coach and loco exports. 71:07:B:(ii).

Details on ‘Paradiso’ units. 71:07:B:(iii).

More imports of Danish coaches. June 2005. 71:07:B:(iv).

Links to Kazakhstan and China. 71:07:B:(v).

Loco plinthed at Tabriz. (Broad gauge). 71:07:B:(vi).

Report on DGEG October 2005 Railtour. 72:08:E.

Second-hand coaches from Denmark. (photo). 73:03.

DGEG Tour report. 73:08:A:(i).

The Shah’s Royal Train. 73:08:A:(ii).

New Year Services March 2006. 73:08:A:(iii).

New Statistics, 2004. 73:08:A:(iv).

End of Quetta - Zahedan service. March 2006. 74:08:C.

Memoirs of Signalman on Trans-Persian Railway. 74:10.

Order from Cuba from Wagon Pars. 75:08:B.

Note on ÖBB Investment chaos and scandal. 76:08:A.

Purchase of DB 232-class Co-Co Diesels. 78:08:(A):(i).

Metro Projects & German Protests. 2007. 78:08:(A):(ii).

Teheran Metro Project report. 79:08:A.

Order by Cuba for rolling stock. 80:08:C.

Italian firm to build 6-car diesel sets & coaches. 81:07:A.

Iran-Iraq line Basra Khorramshahr to open 2008. 81:07:B.

Sapper Memories : Charles Earl 190 Rly.Optg.Coy RE. 81:13.

Notes from Innotrans 2008. 82:07:(g).

Major orders for rolling stock, 2008. 83:07:F:(i).

Plans for new lines and completion of Bam – Zahedan. 83:07:F:(ii).

1991 plan to purchase DR 232-class Co-Co Diesels. 83:07:F:(iii).

Tram networks being constructed in 10 cities. 83:07:K.

Link to Afghanistan under construction, 2008. 83:07:I.

Link to Armenia plan. 84:08:E.

Former Deutsche Reichsbahn coaches in Iran. 84:08:E.

Bam – Zahedan line completed.June 2009. 86:07:G:(i).

Tehran – Mashhad to be electrified. 86:07:G:(i).

New line to Kazakhstan begin, July 2009. 86:07:G:(ii):

Call in Los Angeles to boycott Siemens re. Trade with Iran. 86:07:G:(iii).

Obituary of Don Speight and account of 8F and camel, 1942.87:10:C.

IRAQ.

Problems with Trade with Iraq. 71:07:F:(i).

Study for rail links to Iran. 71:07:F:(ii).

Trackwork article, 1981. 73:08:I:(i).

Website info on former WD 8F 2-8-0. 75:08:D.

Level crossing accident. 2008. 80:08:F.

Baghdad suburban service? 84:08:A.

New Locos being moved from Turkey. 85:08:B:(i).

Works on Samawa line 1978. 85:08:B:().

Freight traffic Syria – Iraq. May 2009. 86:07:H:(i).

Glubb Pasha in Iraq in 1920’s. 87:10:B.
ISRAEL RAILWAYS. (see also ‘Accidents’, ‘Rolling Stock’, Level Crossings’.)

Management appointments. June 2005. 70:04:(h).

Resignation of Yossi Mor as General Manager. July 2005. 70:04:(i).

New G.M. Ofer Linchevski, Sept. 2005. 70:04:(j).

Safety Systems check. 70:04:(m).

Traffic Statistics. May 2005. 70:04:(p).

Traffic Statistics. July 2005. 70:04:(q).

Confirmation of Linchevski. 71:04:(a).

Electrification plans. 71:04:(h).

Double-tracking. 71:04:(m).

Traffic Statistics Sept. 2005. 71:04:(n).

Scandals on political appointments. 71:04:(p).

Buffer stops contract. 71:04:(i).

Delays and conflicts, Oct. 2005. 71:04:(r).

Commuter Pressure Group formed, 2005. 71:04:(v).

Passenger Complaints. 71:04:(w).

New Timetable, December 2005. 71:04:(x).

Dispute with British Army, Haifa, June 1938. 71:11.

Positive press reports, Nov. 2005. 72:04:(vii).

2006 Plans, forecasts, stock acquisition. 72:04:(xxv).

Traffic Statistics November 2005. 72:04:(xxvi).

Traffic Statistics, Dec. 2005 and whole year. 72:04:(xxvii).

Traffic Statistics, January 2006. 72:04:(xxviii).

Traffic Statistics, February 2006. 72:04:(xxix).

Market Share statistics. 72:04:(xxx).

Freight Haulage Statistics, 2005. 72:04:(xxxi).

More Freight Statistics, & wagons. 72:04:(xxxii).

Management Restructuring plans. Dec. 2005. 72:04:(xxxiii).

Public Satisfaction Survey. 72:04:(xxxiv).

New Timetable from 17.12.2005. 72:04:(xxxv).

Revival of former Main Line to Kokhav-Yair? 72:04:(xxxvi).

Differential ticket prices and off-peak fares. 72:04:(xxxvii).

Internet access at stations. 72:04:(xli).

Legal fight against media bias. 72:04:(xliii).

Agreement with Architects on design & fees. 72:04:(xlviii).

Transport Conference, Feb. 2006. ‘Hub’ scheme. 72:04:(xlix).

Punctuality Aims. 72:04:(l).

I.R. Steam Loco Kilometrages. 1948-1959. 72:10.

Travelogue, December 2005. (Editor). 72:09.

New agreement with Contractors. 73:04:(vi).

Clean-Up Campaign. 73:04:(viii).

Demographic Passenger Survey. 73:04:(ix).

Passover 2006 Extra Services. 73:04:(x).

Passover Statistics. 73:04:(xi).

Directorate Vacancy. 73:04:(xvii).

Environmental Impact of Future Plans. 73:04:(xviii).

New Transport Minister - Shaul Mofaz. May 2006. 73:04:(xix & xx).

Effects of War of Summer 2006. 74:03 (ii).

New Timetable due September 2006. 74:03:(iv)

- postponed to October due to war. 74:03:(vi).

Opening of Kfar Saba Merkaz, changes to Jerusalem service,

other changes. Analysis. 74:03:(vi).

Phone information services. 74:03:(xiii).

Cost Overruns on railway projects. 74:03:(xiv).

Timetable changes, February 2007 instead of Oct. 2006. 75:03:(j).

Budget issues. December 2006. 75:03:(l).

Strike. 29th. November 2006. 75:03:(m).

Directorate - vacancies for several months, 2006. 75:03:(r).

New spokeswoman, Maly Cohen. 75:03:(s).

Interview with Ophir Linchevski. 75:12.

Problems on investment and road issues. 76:04:(b).

Effect of train services on property prices. 76:04:(d).

Possible service cuts, February 2007. 76:04:(f).

Railway 2000” website notes. 76:04:(i).



Statistics, 2006 and projected to 2017. 76:04:(j).

Plans for Haifa - Nazareth line. 76:04:(k).

Compensation demands for poor service. 76:04:(l).

Use of Sherut taxis in public transport? 76:04:(n).

Tracklaying on Jezreel Valley line. 76:04:(o).

Suggested Improvements to P-Class locos, 1952. 76:13.

Use of captured ESR locos in 1957. 76:14.

Combined Infrastructure Projects with Roads. 2007. 77:04:(a).

Overcrowding on trains, April 2007. 77:04:(d).

Punctuality Statistics, 2007. 77:04:(e).

Strike over Privatization, April 2007. 77:04:(f).

Simulator Training. 77:04:(h).

New Control Centre & Automatic Traffic Control. 2007. 77:04:(j).

Corruption charges on construction contracts. 77:04:(n).

Statistics for Locos and Stock, 2007. 77:04:(o).

Separate services for Charedim? 78:04:(c).

Commuter savings with rail use. 78:04:(e).

New Timetable September 2007. 78:04:(h).

Planning for Roads and Railways. 2007. 78:04:(i).

Land Development Fees victory. 78:04:(k).

Linchevsky gives in notice, August 2007. 78:04:(n).

Infrastructure works on Tel Aviv - Haifa line, Aug. 2007. 78:04:(t).

Passenger Statistics July/August 2007 78:04:(w).

Lehavim station renamed. 78:04:(x).

Passenger Survey, 2007. 79:04:(g).

Budget Reinstatement. 79:04:(h).

Programme for redundancy payments and cheaper staff. 79:04:(i).

Public Transport - political statements. 2007. 79:04:(m).

Management Problems (Ha’aretz article). 79:04:(o).

New General Manager:Yitzhak Harel. 79:04:(p).

Punctuality problems. 79:04:(q).

Fault Detector for Electrified Rlys. 79:04:(r).

Data Security appointment. 79:04:(s).

Disabled Access. Promises. 79:04:(u).

Safety Conference, 2007. 79:04:(y).

Environmental Arguments over construction. 79:04:(w).

Free Newspapers on Trains? 80:04().

Earthquake training exercise. 80:0(b) & 84:04:(c).

New Chairman of Railways Directorate: Jacob Efrati. 80:04:(c).

Overcrowding caused by Soldiers. 80:04:(d)

Plans for 2008 and view of 2007 80:04:(e).

Radar Detection of Obstacles on the Line 80:04:(h) & 81:4(b).

Trip by Steve Waldenberg. 80:12:b

IC3 at Wadi Soreq old bridge. 80:14:

Problems with delivery of Siemens coaches. 81:04:(a).

Electrification – Consultancy reports. 81:04:(c).

Dumping Rubble in Judean Hills. 81:04:(d) & (l)..

Management Appointments. 81:04:(f).

New Summer 2008 Timetable. 81:04:(g).

Modi’in Opening. 81:04:(h) & 82:04:(e),(f).

State Comptroller’s Report. 81:04:(j).

More Arguments on Jerusalem A1 line. 81:04:(k).

Ganei Aviv Opening 20.05.08. 81:04:(m).

Train Failure on viaduct near Ben-Gurion. 81:04:(n).

Strike in Southern Region. June 2008. 81:04:(p).

IR Web Site. 81:04:(r).

2007 Report. 82:04:(b).

Siemens coaches delivery. June 2008. 82:04:(a), Unloading 84:01.

Siemens coaches Numbers: 84:04 (t).

Ashkelon - Beer-Sheva line financial arguments. 82:04:(c).

Environmental controversies over Modi’in, Jerusalem lines.82:04:(d).

Modi’in Opening and Problems. 82:04:(e),(f).

Petah-Tikva-Arie station opened; combined rail/bus tickets. 82:04:(i).

New Spokeswoman (Doveret), 2008. 82:04:(q).

Terrorism Exercise. 82:04:(s) & 83:10:(e).

Work on new Jerusalem station. 82:04:(t).

More Traffic Records, 2008. 82:04:(u).

Freight train Derailment. June 2008. 82:04:(v).

Mega Trains’ in peak periods. 82:04:(w) plus photo 82:01, & 83:10:(c)



UTIP Congress hosted in Israel, Sept. 2008. 82:04:(x).

IR Delegation sent to Innotrans. 82:04:(z).

Indictments re. Revadim accident. 82:04:(z3).

High Holy Day Timetables. 82:04:(z2).

60th. Anniversary new ticket design. 82:04:(k),

Loco ran out of fuel. 82:04:(l).

Train hits horse at Bnei Berak. April 2008. 82:04: (o).

DGEG Tour cancelled. Sept. 2008. 82:07:(f).

Rail grinding services. 83:04:(a).

Further environmental arguments re. Jerusalem line. 83:04:(b).

GPS Systems installed. 2008. 83:04:(c).

Beer-Sheva line doubling. 83:04:(d), 84:04:(s).

Road bridge near Binyamina. 83:04:(h).

Bridges north of Haifa. 83:04:(h).

Traffic Statistics 3rd. Quarter of 2008. 83:04:(j).

Design award for rail bridge. 83:04:(k).

Road underbridge at Beer-Sheva Ramot, 2008. 83:04:(l).

Bus shuttles B’nei Berak – Kiryat Atidim. 83:04:(n).

Funerals of Bombay terror victims at Kfar Chabad. 83:04:(o).

Car Parking improvements at Netana, Hadera, Miryat Motzkin.83:04:(q).

Smart Cards tender. 83:04:(r).

Travelling the whole IR system in a day! 83:10.(d).

Menachem Savidor: Tomb. 83:10:(a).

New Centralised Control Centre opens, Dec. 2008. 83:04:(s), (84: 04:(i).

Traffic Statistics Nov. 2008. 84:04:(a).

Corruption suspicions. 84:04:(b).

Trackworks, main line & Jerusalem line. 84:04:(g).

Wildcat Strike Feb. 2009. 84:04:(j).

Station locations in road median strips. Notes. 84:04:(l).

Ra’anana Shuttle buses. 84:04:(m).

Israel Elections, Transport as an issue. Feb. 2009. 84:04:(n).

Need to tender for new double-deck coaches. 84:04:(o).

IR Report for 2008. 84:04:(p).

IR Plans for 2009. 84:04:(q).

Planning ahead, 2009. 85:03.

Passenger numbers from stations. 85:04:(a).

Jerusalem Link tenders and troubles. 85:04: (b), (h) & (i).

Trackworks, main line & Beer-Sheva line. 85:04:(d).

Walking & Hiking offers from stations. 85:04:(f).

Progress on Holon – Yavne line. 85:04:(g).

2008 Traffic Statistics. 85:04:(k).

Revised criteria for employing LC watchmen 85:04:(l).

Hulda grade separation 2009 85:04:(m).

Rock Concert specials 85:04:(o).

Information by SMS / Text message. 85:04:(p).

Security developments. 85:04:(q)

Delays in implementing projects. 85:04:().

Current Data on IR. 85:04:(x).

Copper cable thefts, 2009. 86:04:(ii).

Budget for 2009-10. 86:04:(iii).

Appointment of Yaakov Ganot as MoT General Manager. 86:04:(iv).

Cow on Line. 86:04:(vi).

Progress on various lines. 86:04: (v), (vii), (ix), (xvii).

Electric Cars at railway stations. 86:04:(viii).

Approval of A1 Jerusalem route. 86:04:(x).

No Reservations due to congestion! 86:04:(xi).

Compensation case for delays. 86:04:(xii).

Reopening of Yavneh East station. Sept. 2009. 86:04:().

Derailment at Kfar Menachem. 86:04:(xiv) & 86:03.

Moves to privatise Haifa & Ashdod Ports. 86:04:(xv).

New road overbridge at Netanya. 86:04: (xvi).

Football Special Trains. 86:04:(xviii).

Madonna rock concert specials. 86:04:(xxii).

Shuttle bus service at Dimona. 86:04:(xix).

Shuttle bus service in Ashdod. 86:04:(xxvi).

Siemens coaches in operation. 86:04:(xxi).

Combined tickets in Samaria. 86:04:(xxiii).

High Holy Day 2009 special timetable. 86:04:(xxiv).

Possible Tourist Trains on Jerusalem line. 86:04:(xxv).

Combined Theatre & Train tickets. 86:04: (xxvii).

Works in Tel Aviv area. 87:04:(i).

Failures and Fire on train. 87:04:(ii).

Networking Train for Businessmen. 87:04:(vi).

Parking Improvements, Kiryat Motzkin, Netanya, Hadera etc.87:04:(vii).

Lectures on Trains. 87:04:(viii).

Customer Satisfaction Survey. Oct. 2009. 87:04:(ix).

Private Charter Trains available. 87:04:(x).

Joint ticket with Lohamei HaGetaot Museum. 87:04:(xi).

Football Specials. 87:04:(xii).

Special Offers for Groups. 87:04:(xvi).

Work on new Southern Line. 87:04:(xv).

New scheme for Rolling Stock Maintenance. 87:04:(xix).

Political Stress between IR and Transport Ministry. 87:04:(xxiii).

New Financial Arrangements – Payment by Results. 87:04:(xxiv).

Removal of Asbestos from Nahariyya line. 87:04:(xxv).

Problems of Overcrowding. 87:04: (xxviii).

End of old coaches in service. 87:04:(xxx) & see Rolling Stock.


Download 451.31 Kb.

Share with your friends:
1   2   3   4   5




The database is protected by copyright ©ininet.org 2024
send message

    Main page