HAIFA.
Haifa East Station repainting. May 2005. 70:04:(f).
Pollution at Diesel Depot. 70:04:(w).
Tender for works at Haifa East depot. 70:06:(ii).
Tender for construction at Qishon works. 70:06:(iii).
Historical notes. 70:08:(f).
Dispute with British Army, June 1948. 71:11.
Haifa Diesel Depot, night-time view. 71:14.
Haifa East - official opening date confirmed. (cf. 68:6). 72:07:(c).
Haifa East - more re-roofing at museum offices. 75:03:(f).
Haifa Central Station to be renamed “The Eight”. 77:04:(b.
Haifa Central renamed July 2007. 78:04:(f).
Road bridges being built north of Haifa 2008. 83:04:(i).
Plan to privatise Port. 86:04:(xv).
HAR TUV.
Mysterious boiler found. 84:10.
HAMENIYA LOCO.
Loco rediscovered at Kibbutz Na’an. 76:09.
1938 Article on loco. 76:10.
Colour photo of remains. 76:16.
Note on rails at Kibbutz Na’an. 77:07:(f).
Possible second loco & photos of remains. 79:07:(c), & rear cover.
Second loco – a false trail. 82:07:(d).
HARTMANN, RICHARD.
Biographical notes. 85:07: (a).
Hartmann locos in Indonesia. 86:08:(c).
HEDJAZ RAILWAY. (See also Jordan, Syria, Aqaba.)
Conference to be held at Haifa University, December 2005. 70:04:(t).
Notes on Yarmuk Gorge bridges. 70:08:(a).
T.E.F.S. Farewell Tour, June 2006 - Programme. 71:07:H:(a).
Article on journey Amman-Damascus, July 2005. 71:07:H:(b).
New book by James Nicholson. 71:07:H:(c).
Demolition of old bridge at Medina. 71:07:H:(d).
Rumours of Closure. October 2005. 71:07:H:(e).
GE Diesel shunting at Amman 1999. 72.01.
Report on 2000 LCGB Trip. 72:08:B:(i).
Note on Amman visit & museum. Sept. 2005. 72:08:C:(i).
Amman - Dera’a International Services. 72:08:C:(ii).
Query on post-war rolling stock. 72:08:C:(iii).
BBC World radio feature. 72:08:C:(iv).
Damascus Station report. 72:08:D:(i).
Cadem Works report. Aug. 2005. 72:08:D:(ii).
El Hame report. 72:08:D:(iii).
Dera’a report. 72:08:D:(iv).
Dera’a - Cadem trip report. 72:08:D:(v).
Article from ‘Lok Report’ 8/2000. 72:08:D:(vii).
Hartmann 2-8-0 at Gasim, Oct. 2005. 73:01.
RTC Tour October 2005. Report on locos. 73:08:B & C.
Bill Alborough’s Preparation Tour. March 2006. 73:08:D.
Gesher, photo of stock on bridge. 73:10.
Last HR train in Israel, 1951/2. 74:06:(g).
Demolition of old HR bridge in Medinah. 74:08:(E).
Photo of Hartmann 2-8-2 in Syria, 1980’s. 75:01.
Web site. (Nabataea.net). 75:07:(e).
Last HR Train on Afula Line? Line opened August 1951. 77:07:(d).
Junction Station in 1912 & WW1. (Nahal Soreq). 77:10.
Video Review. (American). 78:08:(G):(i).
Chinese proposal to rebuild and electrify. 2007. 78:08:(G):(ii).
Notes on February 2007 DGEG Tour. 79:08:E:(i) & (ii).
Photos of Damascus Kanawat rebuilding. 79:09.
Notes on Cadem & RTC Tour, Oct. 2007: 80:08:A, B.
TEFS Tour Reports of 2006 & 2007, by Andy Wilson. 80:08:H.
Photos of Damascus Kanawat & Interior. 80:13.
HJR Pacific 85 in new livery. 81:01.
Project for new LRT line Amman-Zarqa. 81:07:D.
Globotours proposed tour, Sept. 2008. 81:07:E.
International Park at Naharayim proposed. 81:08:(b).
Museum at Kfar Yehoshua opens June 2008. 81:08:(c).
Photo of Hartmann 2-8-2 in Yarmuk Gorge. 83:01.
Report of Far Rail Tour October 2007. 83:07:A:(i).
Planned ‘Globotrain’ Tour Oct. 2009. 83:07:A:(ii).
Museum at Medina 83:07:B:(i).
“Full Steam Ahead” – Swiss newspaper article. 84:13.
Water trains proposal, ca. 2000. 84:07:(d).
1930 Film with HR scenes. 84:07:(g).
1908 ‘Geographical Journal’ article. 85:11.
Notes on Richard Hartmann & Loco Works. 85:07:(a).
Museum at Medain Saleh. 85:08:C.
Hartmann 2-8-2’s in Indonesia. 86:08:(c).
Jung 2-8-2’s in Brazil, similar to HR type. 86:08:(d).
Globotrains tour planned, Oct. 2010. 86:07:I.
Situation of SLM Works, 2009. 87:11:(ii).
Phantasrail Website showing photos. 87:10:G.
HOFFMAN & SONS, FOUNDRY. TEL AVIV.
Article on Decauville stock built. 1930’s. 77:12.
Catalogue Pictures & Notes. 79:07:(b) & 79:
HOLOCAUST MEMORIAL WAGONS.
Destruction of memorial at Verden. Jan. 2007. 76:07:(a).
Yad Vashem exhibits. 84:07:(e).
IC3 SETS.
Sets 46 & 47 arr. July 2005. 70:05:(b).
Sets at Ramta works. 71:13.
INDUSTRIAL RAILWAYS.
Survey of all known sites to date. (157). 72:07:(l).
INFRASTRUCTURE WORKS. (See also Doubling, Electrification.)
Works on various lines, summer 2008 82:04:(g).
Tel Aviv – Nahariyya – May 2008. 82:04:(g).
Kiryat Motzkin – Nahariyya Sept. 2008 82:04:(h).
Na’an – Beer-Sheva Sept. 2008. 82:04:(h).
Na’an – Beit Shemesh Sept. 2008. 82:04:(h).
Works on Rishon LeZion line. 82:05:().
Works to Beer-Sheva, Negev, Naharyiyya. 84:04: (h),( r),(s).
Works on main line, March 2009. 85:04:(c).
Trackwork at Tel Baruch. 85:01.
Beer-Sheva line. 85:04:(d).
Progress on Holon - Yavneh line. 85:04:(g).
Tender for doubling Na’an – Beer-Sheva line. 85:05:(ii).
Relaying at Tel Baruch, 2009. 85:01.
Permanent-Way machines at new Haifa P-Way Depot. 85:14.
New pedestrian subways near Bnei Beraq. 86:04:(i).
Thefts of copper cables. 2009. 86:04:(ii).
Beer-Sheva line works. 86:04:(v).
Rishon Line progress. 86:04:(vii).
Nahariyya line works. 86:04:(ix).
Approval of Jerusalem A1 route. 86:04:(x).
Reconstruction & Reopening of Yavneh East, Sept. 2009. 86:04:(xiii).
New bridge at Netanya. 86:04:(xvi).
Ayalon Corridor to Peleshet Junc. 86:04:(xvii).
Rishon line and Yavne East and West stations Sept. 2009 87:07.
Works in Tel-Aviv area. 87:04:(i).
Works on Beer-Seva line, oct. 2009 – Jan. 2010. 87:04:(ii).
More on Jerusalem A1 line. 87:04:(iv).
Works Haifa – Nahariyya and Beit Shemesh – Jerusalem. 87:04:(xiii).
Plans for Southern line Ashkelon – Ofakim - Beer-Sheva. 87:04:(xv).
INNOTRANS 2007.
Preliminary announcement. 76:07:(c).
Notes from 2008 Visit. 82:07:(g).
INTERNATIONAL.
International Railway Conference, December 2005. 72:04:(viii).
IRAN.
Paradiso 4-car d.m.u. on trial in Austria. 70:01
Depot scene at Tehran - former BR/WYPTE railbuses. 71:1.
Kerman-Bam line opened December 2004. 71:07:B:(i).
Romanian coach and loco exports. 71:07:B:(ii).
Details on ‘Paradiso’ units. 71:07:B:(iii).
More imports of Danish coaches. June 2005. 71:07:B:(iv).
Links to Kazakhstan and China. 71:07:B:(v).
Loco plinthed at Tabriz. (Broad gauge). 71:07:B:(vi).
Report on DGEG October 2005 Railtour. 72:08:E.
Second-hand coaches from Denmark. (photo). 73:03.
DGEG Tour report. 73:08:A:(i).
The Shah’s Royal Train. 73:08:A:(ii).
New Year Services March 2006. 73:08:A:(iii).
New Statistics, 2004. 73:08:A:(iv).
End of Quetta - Zahedan service. March 2006. 74:08:C.
Memoirs of Signalman on Trans-Persian Railway. 74:10.
Order from Cuba from Wagon Pars. 75:08:B.
Note on ÖBB Investment chaos and scandal. 76:08:A.
Purchase of DB 232-class Co-Co Diesels. 78:08:(A):(i).
Metro Projects & German Protests. 2007. 78:08:(A):(ii).
Teheran Metro Project report. 79:08:A.
Order by Cuba for rolling stock. 80:08:C.
Italian firm to build 6-car diesel sets & coaches. 81:07:A.
Iran-Iraq line Basra Khorramshahr to open 2008. 81:07:B.
Sapper Memories : Charles Earl 190 Rly.Optg.Coy RE. 81:13.
Notes from Innotrans 2008. 82:07:(g).
Major orders for rolling stock, 2008. 83:07:F:(i).
Plans for new lines and completion of Bam – Zahedan. 83:07:F:(ii).
1991 plan to purchase DR 232-class Co-Co Diesels. 83:07:F:(iii).
Tram networks being constructed in 10 cities. 83:07:K.
Link to Afghanistan under construction, 2008. 83:07:I.
Link to Armenia plan. 84:08:E.
Former Deutsche Reichsbahn coaches in Iran. 84:08:E.
Bam – Zahedan line completed.June 2009. 86:07:G:(i).
Tehran – Mashhad to be electrified. 86:07:G:(i).
New line to Kazakhstan begin, July 2009. 86:07:G:(ii):
Call in Los Angeles to boycott Siemens re. Trade with Iran. 86:07:G:(iii).
Obituary of Don Speight and account of 8F and camel, 1942.87:10:C.
IRAQ.
Problems with Trade with Iraq. 71:07:F:(i).
Study for rail links to Iran. 71:07:F:(ii).
Trackwork article, 1981. 73:08:I:(i).
Website info on former WD 8F 2-8-0. 75:08:D.
Level crossing accident. 2008. 80:08:F.
Baghdad suburban service? 84:08:A.
New Locos being moved from Turkey. 85:08:B:(i).
Works on Samawa line 1978. 85:08:B:().
Freight traffic Syria – Iraq. May 2009. 86:07:H:(i).
Glubb Pasha in Iraq in 1920’s. 87:10:B.
ISRAEL RAILWAYS. (see also ‘Accidents’, ‘Rolling Stock’, Level Crossings’.)
Management appointments. June 2005. 70:04:(h).
Resignation of Yossi Mor as General Manager. July 2005. 70:04:(i).
New G.M. Ofer Linchevski, Sept. 2005. 70:04:(j).
Safety Systems check. 70:04:(m).
Traffic Statistics. May 2005. 70:04:(p).
Traffic Statistics. July 2005. 70:04:(q).
Confirmation of Linchevski. 71:04:(a).
Electrification plans. 71:04:(h).
Double-tracking. 71:04:(m).
Traffic Statistics Sept. 2005. 71:04:(n).
Scandals on political appointments. 71:04:(p).
Buffer stops contract. 71:04:(i).
Delays and conflicts, Oct. 2005. 71:04:(r).
Commuter Pressure Group formed, 2005. 71:04:(v).
Passenger Complaints. 71:04:(w).
New Timetable, December 2005. 71:04:(x).
Dispute with British Army, Haifa, June 1938. 71:11.
Positive press reports, Nov. 2005. 72:04:(vii).
2006 Plans, forecasts, stock acquisition. 72:04:(xxv).
Traffic Statistics November 2005. 72:04:(xxvi).
Traffic Statistics, Dec. 2005 and whole year. 72:04:(xxvii).
Traffic Statistics, January 2006. 72:04:(xxviii).
Traffic Statistics, February 2006. 72:04:(xxix).
Market Share statistics. 72:04:(xxx).
Freight Haulage Statistics, 2005. 72:04:(xxxi).
More Freight Statistics, & wagons. 72:04:(xxxii).
Management Restructuring plans. Dec. 2005. 72:04:(xxxiii).
Public Satisfaction Survey. 72:04:(xxxiv).
New Timetable from 17.12.2005. 72:04:(xxxv).
Revival of former Main Line to Kokhav-Yair? 72:04:(xxxvi).
Differential ticket prices and off-peak fares. 72:04:(xxxvii).
Internet access at stations. 72:04:(xli).
Legal fight against media bias. 72:04:(xliii).
Agreement with Architects on design & fees. 72:04:(xlviii).
Transport Conference, Feb. 2006. ‘Hub’ scheme. 72:04:(xlix).
Punctuality Aims. 72:04:(l).
I.R. Steam Loco Kilometrages. 1948-1959. 72:10.
Travelogue, December 2005. (Editor). 72:09.
New agreement with Contractors. 73:04:(vi).
Clean-Up Campaign. 73:04:(viii).
Demographic Passenger Survey. 73:04:(ix).
Passover 2006 Extra Services. 73:04:(x).
Passover Statistics. 73:04:(xi).
Directorate Vacancy. 73:04:(xvii).
Environmental Impact of Future Plans. 73:04:(xviii).
New Transport Minister - Shaul Mofaz. May 2006. 73:04:(xix & xx).
Effects of War of Summer 2006. 74:03 (ii).
New Timetable due September 2006. 74:03:(iv)
- postponed to October due to war. 74:03:(vi).
Opening of Kfar Saba Merkaz, changes to Jerusalem service,
other changes. Analysis. 74:03:(vi).
Phone information services. 74:03:(xiii).
Cost Overruns on railway projects. 74:03:(xiv).
Timetable changes, February 2007 instead of Oct. 2006. 75:03:(j).
Budget issues. December 2006. 75:03:(l).
Strike. 29th. November 2006. 75:03:(m).
Directorate - vacancies for several months, 2006. 75:03:(r).
New spokeswoman, Maly Cohen. 75:03:(s).
Interview with Ophir Linchevski. 75:12.
Problems on investment and road issues. 76:04:(b).
Effect of train services on property prices. 76:04:(d).
Possible service cuts, February 2007. 76:04:(f).
“Railway 2000” website notes. 76:04:(i).
Statistics, 2006 and projected to 2017. 76:04:(j).
Plans for Haifa - Nazareth line. 76:04:(k).
Compensation demands for poor service. 76:04:(l).
Use of Sherut taxis in public transport? 76:04:(n).
Tracklaying on Jezreel Valley line. 76:04:(o).
Suggested Improvements to P-Class locos, 1952. 76:13.
Use of captured ESR locos in 1957. 76:14.
Combined Infrastructure Projects with Roads. 2007. 77:04:(a).
Overcrowding on trains, April 2007. 77:04:(d).
Punctuality Statistics, 2007. 77:04:(e).
Strike over Privatization, April 2007. 77:04:(f).
Simulator Training. 77:04:(h).
New Control Centre & Automatic Traffic Control. 2007. 77:04:(j).
Corruption charges on construction contracts. 77:04:(n).
Statistics for Locos and Stock, 2007. 77:04:(o).
Separate services for Charedim? 78:04:(c).
Commuter savings with rail use. 78:04:(e).
New Timetable September 2007. 78:04:(h).
Planning for Roads and Railways. 2007. 78:04:(i).
Land Development Fees victory. 78:04:(k).
Linchevsky gives in notice, August 2007. 78:04:(n).
Infrastructure works on Tel Aviv - Haifa line, Aug. 2007. 78:04:(t).
Passenger Statistics July/August 2007 78:04:(w).
Lehavim station renamed. 78:04:(x).
Passenger Survey, 2007. 79:04:(g).
Budget Reinstatement. 79:04:(h).
Programme for redundancy payments and cheaper staff. 79:04:(i).
Public Transport - political statements. 2007. 79:04:(m).
Management Problems (Ha’aretz article). 79:04:(o).
New General Manager:Yitzhak Harel. 79:04:(p).
Punctuality problems. 79:04:(q).
Fault Detector for Electrified Rlys. 79:04:(r).
Data Security appointment. 79:04:(s).
Disabled Access. Promises. 79:04:(u).
Safety Conference, 2007. 79:04:(y).
Environmental Arguments over construction. 79:04:(w).
Free Newspapers on Trains? 80:04().
Earthquake training exercise. 80:0(b) & 84:04:(c).
New Chairman of Railways Directorate: Jacob Efrati. 80:04:(c).
Overcrowding caused by Soldiers. 80:04:(d)
Plans for 2008 and view of 2007 80:04:(e).
Radar Detection of Obstacles on the Line 80:04:(h) & 81:4(b).
Trip by Steve Waldenberg. 80:12:b
IC3 at Wadi Soreq old bridge. 80:14:
Problems with delivery of Siemens coaches. 81:04:(a).
Electrification – Consultancy reports. 81:04:(c).
Dumping Rubble in Judean Hills. 81:04:(d) & (l)..
Management Appointments. 81:04:(f).
New Summer 2008 Timetable. 81:04:(g).
Modi’in Opening. 81:04:(h) & 82:04:(e),(f).
State Comptroller’s Report. 81:04:(j).
More Arguments on Jerusalem A1 line. 81:04:(k).
Ganei Aviv Opening 20.05.08. 81:04:(m).
Train Failure on viaduct near Ben-Gurion. 81:04:(n).
Strike in Southern Region. June 2008. 81:04:(p).
IR Web Site. 81:04:(r).
2007 Report. 82:04:(b).
Siemens coaches delivery. June 2008. 82:04:(a), Unloading 84:01.
Siemens coaches Numbers: 84:04 (t).
Ashkelon - Beer-Sheva line financial arguments. 82:04:(c).
Environmental controversies over Modi’in, Jerusalem lines.82:04:(d).
Modi’in Opening and Problems. 82:04:(e),(f).
Petah-Tikva-Arie station opened; combined rail/bus tickets. 82:04:(i).
New Spokeswoman (Doveret), 2008. 82:04:(q).
Terrorism Exercise. 82:04:(s) & 83:10:(e).
Work on new Jerusalem station. 82:04:(t).
More Traffic Records, 2008. 82:04:(u).
Freight train Derailment. June 2008. 82:04:(v).
‘Mega Trains’ in peak periods. 82:04:(w) plus photo 82:01, & 83:10:(c)
UTIP Congress hosted in Israel, Sept. 2008. 82:04:(x).
IR Delegation sent to Innotrans. 82:04:(z).
Indictments re. Revadim accident. 82:04:(z3).
High Holy Day Timetables. 82:04:(z2).
60th. Anniversary new ticket design. 82:04:(k),
Loco ran out of fuel. 82:04:(l).
Train hits horse at Bnei Berak. April 2008. 82:04: (o).
DGEG Tour cancelled. Sept. 2008. 82:07:(f).
Rail grinding services. 83:04:(a).
Further environmental arguments re. Jerusalem line. 83:04:(b).
GPS Systems installed. 2008. 83:04:(c).
Beer-Sheva line doubling. 83:04:(d), 84:04:(s).
Road bridge near Binyamina. 83:04:(h).
Bridges north of Haifa. 83:04:(h).
Traffic Statistics 3rd. Quarter of 2008. 83:04:(j).
Design award for rail bridge. 83:04:(k).
Road underbridge at Beer-Sheva Ramot, 2008. 83:04:(l).
Bus shuttles B’nei Berak – Kiryat Atidim. 83:04:(n).
Funerals of Bombay terror victims at Kfar Chabad. 83:04:(o).
Car Parking improvements at Netana, Hadera, Miryat Motzkin.83:04:(q).
Smart Cards tender. 83:04:(r).
Travelling the whole IR system in a day! 83:10.(d).
Menachem Savidor: Tomb. 83:10:(a).
New Centralised Control Centre opens, Dec. 2008. 83:04:(s), (84: 04:(i).
Traffic Statistics Nov. 2008. 84:04:(a).
Corruption suspicions. 84:04:(b).
Trackworks, main line & Jerusalem line. 84:04:(g).
Wildcat Strike Feb. 2009. 84:04:(j).
Station locations in road median strips. Notes. 84:04:(l).
Ra’anana Shuttle buses. 84:04:(m).
Israel Elections, Transport as an issue. Feb. 2009. 84:04:(n).
Need to tender for new double-deck coaches. 84:04:(o).
IR Report for 2008. 84:04:(p).
IR Plans for 2009. 84:04:(q).
Planning ahead, 2009. 85:03.
Passenger numbers from stations. 85:04:(a).
Jerusalem Link tenders and troubles. 85:04: (b), (h) & (i).
Trackworks, main line & Beer-Sheva line. 85:04:(d).
Walking & Hiking offers from stations. 85:04:(f).
Progress on Holon – Yavne line. 85:04:(g).
2008 Traffic Statistics. 85:04:(k).
Revised criteria for employing LC watchmen 85:04:(l).
Hulda grade separation 2009 85:04:(m).
Rock Concert specials 85:04:(o).
Information by SMS / Text message. 85:04:(p).
Security developments. 85:04:(q)
Delays in implementing projects. 85:04:().
Current Data on IR. 85:04:(x).
Copper cable thefts, 2009. 86:04:(ii).
Budget for 2009-10. 86:04:(iii).
Appointment of Yaakov Ganot as MoT General Manager. 86:04:(iv).
Cow on Line. 86:04:(vi).
Progress on various lines. 86:04: (v), (vii), (ix), (xvii).
Electric Cars at railway stations. 86:04:(viii).
Approval of A1 Jerusalem route. 86:04:(x).
No Reservations due to congestion! 86:04:(xi).
Compensation case for delays. 86:04:(xii).
Reopening of Yavneh East station. Sept. 2009. 86:04:().
Derailment at Kfar Menachem. 86:04:(xiv) & 86:03.
Moves to privatise Haifa & Ashdod Ports. 86:04:(xv).
New road overbridge at Netanya. 86:04: (xvi).
Football Special Trains. 86:04:(xviii).
Madonna rock concert specials. 86:04:(xxii).
Shuttle bus service at Dimona. 86:04:(xix).
Shuttle bus service in Ashdod. 86:04:(xxvi).
Siemens coaches in operation. 86:04:(xxi).
Combined tickets in Samaria. 86:04:(xxiii).
High Holy Day 2009 special timetable. 86:04:(xxiv).
Possible Tourist Trains on Jerusalem line. 86:04:(xxv).
Combined Theatre & Train tickets. 86:04: (xxvii).
Works in Tel Aviv area. 87:04:(i).
Failures and Fire on train. 87:04:(ii).
Networking Train for Businessmen. 87:04:(vi).
Parking Improvements, Kiryat Motzkin, Netanya, Hadera etc.87:04:(vii).
Lectures on Trains. 87:04:(viii).
Customer Satisfaction Survey. Oct. 2009. 87:04:(ix).
Private Charter Trains available. 87:04:(x).
Joint ticket with Lohamei HaGetaot Museum. 87:04:(xi).
Football Specials. 87:04:(xii).
Special Offers for Groups. 87:04:(xvi).
Work on new Southern Line. 87:04:(xv).
New scheme for Rolling Stock Maintenance. 87:04:(xix).
Political Stress between IR and Transport Ministry. 87:04:(xxiii).
New Financial Arrangements – Payment by Results. 87:04:(xxiv).
Removal of Asbestos from Nahariyya line. 87:04:(xxv).
Problems of Overcrowding. 87:04: (xxviii).
End of old coaches in service. 87:04:(xxx) & see Rolling Stock.
Share with your friends: |