Schedule 3.2 (Engineering Services).

Acid resistant paint shall be used to protect signal cases and housings from battery acid damage. This paint shall be applied as required to prevent corrosion.

Only manufacturer-recommended or -approved replacement parts and procedures shall be used to repair broken signal and communication apparatus on a permanent basis. The Operator must be prepared to replace failed equipment with approved materials or rebuild as necessary, all parts deemed to be obsolete by the manufacturer.

Temporary repairs shall be permanently repaired commencing on the next business day after the installation of the temporary repair. In the event replacement parts are not readily available, MBTA shall immediately be notified in writing. The missing parts must be added to the “None on Hand” list per procedures described in Schedule 3.4 (Materials Management and Procurement) of this Agreement and MBTA apprised on the status of parts order status until delivery is made and necessary repairs effected.

Material that can be much more economically repaired, or has proprietary rights or patents established, or is covered by warranty, may be repaired by an outside vendor. This would include materials such as circuit card repair and return, and the equivalent.

The Operator shall follow applicable FRA regulations regarding investigation and reporting of false proceeds. The Operator shall also submit the following reports to the MBTA after every false proceed:

A preliminary report (ODRL 3.2-063), within 24 hours of the reported false proceed, in electronic format.

A final report (ODRL 3.2-064), within 15 days of the false proceed, filed on form FRA F 6180-14, in electronic format.

The Operator shall provide an annual signal failure reduction program (ODRL 3.2-065) for MBTA approval as part of the annual Engineering Services Plan. The goal of the program shall be to produce an annual five percent reduction from the previous Agreement Year's totals on all preventable signal failures causing train delays. Goals shall be met when a five percent reduction is achieved by the end of the MBTA fiscal year. A preliminary plan shall be submitted to the MBTA no later than 120 days after NTP (ODRL 3.2-066).

Non-preventable signal failures causing train delays shall be included in this program, but shall not require a yearly five percent reduction.

Three failure areas shall be identified yearly by the Operator from the activity report categories, which shall require a five percent reduction from the previous Agreement Year’s totals.

A monthly Train Delay Report shall be forwarded to the MBTA's Chief Engineer no later than the date of the submission by the Operator of its monthly invoice to the MBTA.

The report shall include a breakdown of preventable and non-preventable signal and communications failures.

Adjustments to the report shall be made only after review and with concurrence of both the Operator and the MBTA Chief Engineer.

Tests and Inspections

All signal and communication systems in use on the Service Property shall be tested and inspected by the Operator to assure that they are all in Good Working Condition. This shall be accomplished by periodic tests and inspection of MBTA signal and communication systems and apparatus as required by this Agreement, MBTA’s CS-1, FRA Parts 234 and 236, and any other applicable laws, rules or regulations.

In addition to meeting any applicable FRA reporting requirements the Operator shall submit the following reports to the MBTA after every FRA signal and train control test or inspection:

A preliminary written report (ODRL 3.2-067) by the end of the next business day of the test or inspection, in both hardcopy and electronic formats.

A final written report (ODRL 3.2-068) indicating the corrective action taken or plan to correct by the Operator, within two (2) business days of the preliminary written report, in electronic formats.

All corrections or repairs shall be made within time limits specified by FRA Parts 234 and 236 for correction.

Test and inspection dates and results, including digital photographs where appropriate, shall be recorded in the Commuter Rail IT Environment and summarized in the monthly Report on FRA Test Compliance (ODRL 3.2-069).

Signal and Communications Repair Facilities

The MBTA provides signal and communications repair facilities in which the Operator shall repair relays, switch machines, switch circuit controllers, and other signal and communications apparatus necessary to maintain the Service Property in a Good Working Condition.

These repair facilities provide limited space both inside and outside to build signal cases, bungalows and other apparatus necessary to support the performance of the Agreement Services. These repair facilities shall be used for repairing or constructing signal and communications apparatus to be used on the Service Property. For any other use of these repair facilities, the Operator must obtain prior written approval from the MBTA Chief Engineer.

Signal Design

The Operator shall produce and maintain a complete set of “as-built” plans reflecting the current circuitry on all new system installations or newly modified pieces of such systems. The Operator shall create these plans and store them in the Commuter Rail IT Environment (ODRL 3.2-070) within 30 days of the time any modification or new installation to the Service Property is placed in service.

Updated field plans reflecting changes made shall be supplied to the MBTA by the Operator within 30 calendar days of the time such field change is placed in service.

The Operator shall keep correct, as-in-service, up-to-date, and legible plans at all interlockings, control points, automatic signals, grade crossings and any other locations that are required by FRA Parts 234 and 236 regulations.

Six complete sets of current line plans, track charts, and interlocking books (ODRL 3.2-071) for active commuter rail routes shall be submitted to the MBTA by February 1st of each Agreement Year.

Supervisory Control Systems

Redundant carrier lines shall be maintained in an operable condition at all times when available and periodic testing/usage by the Operator shall be performed to ensure their integrity and that they are in Good Working Condition. The Operator shall ensure survivability and continuity of network services in the case of any catastrophic event or incident and ensure communications between CROCC and the CRMF, and as further required by Schedules 3.15 (Intellectual Property; Ownership) through 3.17 (IT Security) of this Agreement.

Where available, MBTA communication facilities, including lines, wires, fiber optics, radio frequencies, and the like shall be used by the operator.

The Operator shall provide all qualified technical personnel required to maintain the programmable logic controllers (“PLCs”) used for supervisory control, as well as all electronic equipment used for train control systems including code servers, code emulators, and Vital Processor Control Interlockings.

Grade Crossings

The Operator shall provide information to the MBTA regarding railroad operations involving specific highway rail grade crossings upon request, including but not limited to, present and projected rail traffic (including transportation of hazardous materials); present and projected passenger traffic; present and projected track configuration and signaling; present and projected maximum authorized track speed and other conditions which may affect the planning for, and prioritization of, crossing improvements (ODRL 3.2-072).

When required by the MBTA, the Operator shall provide appropriate engineering and other technical assistance to Third Parties in designing and installing the warning system determined to be appropriate to a particular crossing.

Grade crossing gates, lights, and wires shall be properly attached to apparatus following appropriate AREMA Section 3 Standards and in accordance with FRA Part 234 Regulations. Grade crossing warning systems shall be maintained by the Operator in accordance with the appropriate sections of the MUTCD 2000 as modified by Mass DPU. Lights shall be aligned using AREMA Section 3.3.5 and Mass DPU standards. The use of Light Emitting Diode (“LED”) signal lamps is approved and their use is encouraged for signal lamps.

The Operator shall ensure all appropriate devices and appurtenances are in place and functioning, including but not limited to striping and advance warning lights.

The Operator shall remove vegetation from the Service Property, private property and roadways so that the view of the warning system from an approaching train or motorist is not obstructed.

The Operator shall establish and provide to the MBTA for approval, an annual grade crossing event recorder program (ODRL 3.2-073), as part of the annual Engineering Services Plan. The program shall provide a schedule for the Operator to purchase, install and maintain a minimum of 10 new event-recording devices per year at grade crossings. The Operator shall provide, with the program, a list of those grade crossings not equipped with recording devices for MBTA’s input on prioritizing future installation schedules. Event recording devices shall have no fewer than 32 channels. The Operator shall provide a preliminary plan no later than 120 days after NTP (ODRL 3.2-074).

All recording devices shall be remotely accessible from end-user computers on the MBTA and the Operator computer networks, and individually addressable with a common communications protocol. All recording devices shall also be accessible via individual MBTA owned or outside telephone lines or facilities. Recording devices shall have the capability of transmitting emergency failure data to CROCC and CETC. Items to be recorded must include:

Power off;

Gate down, including fully horizontal position where available;

Pushbutton manual interruption of crossing operation;

Lamp out;

All track circuit occupancies (approach track circuits & island track circuit); and

Crossing stick conditions.

The Operator shall report to the MBTA all gate and grade crossing malfunctions that result in “fail unsafe” conditions. The Operator shall submit a report within 24 hours to the MBTA (ODRL 3.2-075) that provides the failure cause and all planned corrective actions.

The Operator shall maintain crossing approach distances of sufficient length to accommodate the existing maximum authorized track speeds and adjust them as necessary in the event that changing track conditions warrant track speed changes.

The Operator shall post and maintain the crossing name, milepost designation, and maintenance phone number for each highway-grade crossing on each crossing bungalow, or at the crossing if there is no bungalow, in accordance with the Engineering Services Standards.

As new highway-crossing technology is installed, the Operator shall maintain these systems. Technology included in the Operator’s responsibility shall include maintenance of the following systems:

Four-quadrant gate systems;

Quiet zone systems;

Vehicle detection systems;

Traffic light preemption systems coordinated with the highway crossings;

Visual monitoring systems;

Police and fire department notification systems;

Remote Terminal Units (such as ScadaNet) if installed; and

Other technologies associated with highway crossing warning systems.

Wayside Signals and Interlockings

The focus of all signals shall be maintained by the Operator to provide the optimal sight distance at all times. This shall include adequate brush removal as required.

Under no circumstances shall any railroad material be stored in or around signal cases or signal masts.

Track wires and connectors shall be properly installed in accordance with rail industry practice, such as the Operator’s standard plan for track wire connections, to avoid exposure to mechanical injury and/or vandalism and in accordance with all applicable FRA Parts 234 and 236 regulations.

Signal number plates shall be properly displayed so that signal identification cannot be mistaken. Signal interlocking bungalows shall have the interlocking identification name displayed on both sides of the bungalow at Central Instrument Locations, and at all entrances to the interlockings.

Lamp change out records showing last date changed shall be kept at each location. In addition, the change out date for each lamp with an appropriate apparatus identification number shall be recorded in the Commuter Rail IT Environment. The use of LED signal lamps is approved and their use is encouraged for signal lamps.

Up to date copies of the required tests of signal apparatus shall be kept in the signal instrument housing at all times, and copies maintained in an office file as required for inspection by FRA and Mass DPU inspectors per FRA Parts 234 and 236 (ODRL 3.2-076). These reports shall be made available to the MBTA upon request.

The Operator shall establish and provide to the MBTA for approval as part of the annual Engineering Services Plan, an Interlocking Event Recorder Program (ODRL 3.2-077) to provide, install and maintain a minimum of ten (10) new event recorders at interlockings each year. Additional event recording devices shall be used at interlockings for investigation of continuous failures without a determined cause. A preliminary program shall be submitted to the MBTA no later than 120 days after NTP (ODRL 3.2-078).

The Operator shall provide a list of those interlockings not equipped with recording devices by February 1st of each Agreement Year for MBTA’s input on prioritizing installation schedules. This list shall be an appendix to the Interlocking Event Recorder Program (part of ODRL 3.2-077). The event recording devices shall provide the largest number of channels commercially available.

The recording devices shall be remotely accessible from MBTA offices and individually addressable by a standard PC with a common communications protocol, via individual MBTA owned or telephone company outside telephone lines or facilities. Items to be recorded must include:

Power off;

Signal cleared or to stop;

Request for signal cleared or to stop;

Track circuit occupancy of all available track circuits including plant circuits and approach indications;

Request for switch;

Indication for switch;

Fire alarm conditions;

Manual operation of interlocking;

Intrusion alarms; and

Bungalow temperature extremes.

The Operator shall develop and submit to the MBTA for approval a system-wide Switch Machine Replacement Plan (ODRL 3.2-079) as part of the annual Engineering Services Plan. Switch machines shall then be overhauled, renewed, or replaced by the Operator based upon that plan. The Operator shall expect to replace 10 switch machines per Agreement Year. The Operator shall submit a preliminary plan no later than 120 days after NTP (ODRL 3.2-080).

Pole Line, Wire, and Cable

Temporary wires or twisted pair shall be replaced promptly, in accordance with FRA Regulations, but not to exceed 30 calendar days.

All wiring and cabling shall be protected from damage, inspected, and tested in accordance with the Engineering Services Standards, Rail Industry Standards, and FRA requirements. Wire and cable shall be replaced as part of the Annual Fee when damaged through negligence on the part of the Operator.

All pole line wire and cabling shall be maintained in accordance with the guidelines set forth in the Engineering Services Standards.

The Operator shall develop and submit to MBTA for approval, as part of the annual Engineering Services Plan, a suggested Pole Line Retirement and Replacement Plan (ODRL 3.2-081) with prioritized pole line segments requiring more immediate replacement listed first. The Operator shall submit to the MBTA a preliminary suggested Pole Line Retirement and Replacement Plan no later than 120 days after NTP (ODRL 3.2-082).

As part of the annual Engineering Services Plan, the Operator shall establish and provide to the MBTA for approval an annual Pole Replacement Program (ODRL 3.2-083). This program shall include an updated list of defective poles and a schedule for planned replacements. The Operator shall be required to replace a minimum of 50 poles per Agreement Year and wiring as necessary to keep the system functioning and in Good Working Condition. The Operator shall submit to the MBTA a preliminary plan no later than 120 days after NTP (ODRL 3.2-084).

Communications

MBTA shall continue to provide existing 222 exchange telephone extensions and certain other communication lines as required to perform the Agreement Services. Additional lines required by the Operator shall be at the Operator’s sole cost and expense.

The Operator shall provide 24 hour alpha-numeric messaging service to alert the Operator and designated MBTA staff of service related incidents.

MBTA shall provide to the Operator radio base station licenses in the MBTA's name.

The Operator shall complete, on behalf of the MBTA, license applications and materials for MBTA’s submission to licensing authorities.

The Operator shall maintain all mobile, portable or otherwise two-way radios, base stations and antennas, including those used by the MBTA, in Good Working Condition.

The Operator shall maintain all radio equipment located in locomotives and cab coaches. Such radios are currently maintained by the Engineering Department in the Radio Shop Facility.

The Operator shall maintain all communication equipment, public address and intercom systems used to perform the Agreement Services in Good Working Condition. These shall include the LED scrolling sign systems installed at train stations and vehicle location systems (GPS, wayside transponders, and the like).

The Operator shall maintain the MBTA-owned fiber optic systems used for the provision of Agreement Services. This shall include all telecommunications interfaces and/or telephone, code lines, radio lines and data lines that interface with the systems.

ELECTRICAL

General


The Operator shall provide complete electrical service and maintenance, and provide a reliable and adequate power source for all of the Service Property, including but not limited to buildings, stations, layover facilities, roadways, grade crossings, switch heaters, substations, area lighting and draw bridges.

The Operator shall develop and submit to the MBTA Safety Department within 90 days after NTP a Lock-Out Tag-Out Procedure (ODRL 3.2-085) to protect workers from electric shock hazards.

The Operator shall review the available database of electrical and lighting equipment provided by MBTA and field inspect all of the Service Property to familiarize the Operator Personnel with the type and quantity of equipment that requires testing and maintenance. The Operator shall add any existing or additional equipment that provides electrical service or lighting to the Service Property to complete the database (ODRL 3.2-086). This must be done no later than 120 days after NTP.

The Operator shall develop complete records for all electrical and lighting equipment on the Service Property and maintain them in the Commuter Rail IT Environment. These records shall contain, at a minimum, specific information with regard to the types of maintenance and testing required, and the testing frequency. After the Agreement Services Commencement Date, the Operator shall update these records with any changes in equipment or procedures.

The MBTA will make available to the Operator the Commuter Electrical Department Millennium Edition Rules and Procedures document as a reference. Based on this document and industry standards, the Operator shall develop rules and procedures for electrical testing and maintenance (ODRL 3.2-087) and submit these for MBTA approval within 90 days after NTP.

The Operator shall maintain a membership within the IEEE, for the benefit of itself and the MBTA, as requested. The Operator shall provide a copy of all IEEE manuals to the MBTA.

Testing and Maintenance Responsibilities

The Operator shall test and maintain all electrical and lighting equipment on the Service Property in accordance with the following standards:

Wherever applicable, the Operator shall adhere to the International Electrical Testing Association (“NETA”) Maintenance Testing Specifications, MTS-2011. This document may be downloaded from: http://www.techstreet.com/cgi-bin/detail?docno=neta%7Cmt s2011:productid=1800106.

Where requirements are not specifically detailed in the reference standard noted in Section 7.2.1.1 of this Schedule 3.2 (Engineering Services), the Operator shall test and maintain equipment per the FM Global Publication 5-20, dated September 2007.

Where requirements are not specifically detailed in the reference standards noted in Sections 7.2.1.1 and 7.2.1.2 of this Schedule 3.2 (Engineering Services), the Operator shall test and maintain equipment per the manufacturer’s recommendations at a minimum, or in the absence of those, per good engineering practice.

The Operator shall set the frequency for electrical and lighting equipment testing and maintenance according to the following guidelines:

Wherever applicable, the Operator shall adhere to Appendix B of the NETA Maintenance Testing Specifications, MTS-2011, using the matrix multiplier of 1.0.

Where requirements are not specifically detailed in the reference standard noted in Section 7.2.2.1 of this Schedule 3.2 (Engineering Services), the testing and maintenance frequency shall be as per FM Global Publication 5-20, dated May 2001.

Where requirements are not specifically detailed in the reference standards noted in Sections 7.2.2.1 and 7.2.2.2 of this Schedule 3.2 (Engineering Services), the testing and maintenance frequency shall be as per the manufacturer’s recommendations at a minimum, or in the absence of those, per good engineering practice.

The Operator shall be responsible for the implementation of all electrical and lighting testing and maintenance activities, including but not limited to scheduling, utility coordination, outage duration, and notification.

The Operator shall keep the MBTA apprised of activities in this area on a monthly basis, through the reporting and meeting requirements described below.

The Operator shall notify the MBTA at least 35 days prior to planned outages that affect the operation of trains or stations (ODRL 3.2-088), and shall notify the MBTA immediately in the case of unplanned outages (ODRL 3.2-089), in accordance with Sections 2.2.4 and 2.2.5 of this Schedule 3.2 (Engineering Services).

The Operator shall record all electrical testing and maintenance activities and results in the Commuter Rail IT Environment. The Operator shall provide a monthly report, in electronic format, to the MBTA containing a comprehensive summary of all electrical maintenance and testing activities and results for the previous month, as well as anticipated activities for the coming month (ODRL 3.2-090). The Operator shall submit a template showing the proposed form for these reports to the MBTA within 90 days after NTP (ODRL 3.2-091).

The Operator shall schedule and attend monthly meetings with the MBTA and be prepared to provide and discuss a summary of electrical maintenance and testing activities and results for the previous month, as well as anticipated activities for the coming month. The Operator shall publish and distribute a schedule for these meetings (ODRL 3.2-092) as well as prepare and distribute to all stakeholders a meeting agenda prior to each meeting (ODRL 3.2-093).

The Operator shall inspect and maintain all lighting on the Service Property, including without limitation, stations, yards, buildings, roads, and parking lots. The Operator shall inspect all lighting installations on a monthly basis at a minimum. All lighting shall be inspected and maintained so that no less than 90% of the lighting at every location is illuminated. Unlit areas shall not exceed 10% of lighting at any one location. If an unlit area or any lighting deficiency is concentrated so as to create a dark spot, it shall be corrected immediately. Every effort must be made to achieve 100% lighting at all locations.

The Operator shall repair or replace all ballast, lenses and vandal shields if they are found to be defective. When replacing bulbs, the Operator shall ensure that the fixture is aimed correctly and ensure that any house side shields are reinstalled. Light bulbs shall be replaced by the Operator on an annual basis and as otherwise directed by the MBTA.

The Operator shall clean all light fixture lenses when replacing bulbs. All replacement light bulbs shall be mercury free.

Where the MBTA utilizes Third Party cleaning contractors on the Service Property, the Operator shall supply the Third Party cleaning contractors with mercury free light bulbs to be used as replacements. Lighting and electrical fixtures installed or replaced shall be tamper-resistant and in accordance with the Engineering Services Standards. Any fixtures replaced must provide more light than that which existed previously, except with the express written permission of the MBTA Chief Engineer.

The Operator shall develop and implement a thermo graphic survey (infrared testing) program, based upon the history of failures and problems discovered during maintenance and testing procedures (ODRL 3.2-094). At a minimum, the Operator shall perform infrared testing on all substations and other critical equipment annually. Infrared testing shall conform to the requirements set forth in the NETA Maintenance Testing Specifications, MTS-2011.

The Operator shall maintain the layover ground power receptacles and all layover facilities in a Good Working Condition.

The Operator shall test and maintain fire alarm and detection systems on the Service Property as per NFPA 72.

The Operator install fire protection systems on the Service Property as per NFPA 25. The frequency shall be as indicated in NFPA 25 Table 2-1.

The Operator shall provide all resources and maintain inventory and parts required for the maintenance of electrical systems and lighting on the Service Property in a timely fashion. The Operator shall record and monitor inventory in the Commuter Rail IT Environment.

The Operator shall be responsible for identifying testing and maintenance measures with the potential to reduce cost, save time, simplify procedures, or the like, to the MBTA. The Operator shall recommend these measures in report form as measures are identified. These reports shall contain cost estimates for the improvements or changes, and estimated annual or one-time savings. These reports shall be submitted no less than annually.

Inspection, Maintenance and Operation of Electric Switch Heaters

The Operator shall inspect, maintain and operate all electric switch heater systems, including any associated appurtenances, contained within the Service Property.

The Operator shall maintain track switch snow melting equipment as installed and in accordance with the latest revision of MBTA Standard Plan 3040 “Typical Snow Melter Layout.” In the case of older installations, they shall be maintained until replaced in accordance with MBTA Standard Plan 3040.

In preparation for the winter season, the Operator shall ensure that all electric switch heaters are in Good Working Condition by September 15th of each Agreement Year.

Energy Conservation and Utilization

The Operator shall provide energy conservation and utilization audits for all of the Service Property maintained pursuant to this Agreement and subject to energy consumption. The Operator shall be responsible for reviewing on a monthly basis all energy bills for correctness and consistency with invoicing and consumption over the previous 12 months. The Operator shall investigate and reconcile any unusual energy consumption and invoicing. A summary report of all energy conservation and utilization audits shall be submitted to the MBTA no less than annually (ODRL 3.2-095).

The Operator shall be responsible for inputs to the Commuter Rail IT Environment for all electric services that contains monthly kW and kWh consumption and related billing data, along with class of service, location information, service number and other data pertinent to the MBTA (ODRL 3.2-096). The location information shall be listed in sufficient detail so as to be understandable to a person without Railroad expertise to interpret without confusion. The Operator shall ensure current records for Operator and MBTA use and shall update continuously and be available on to the MBTA on request.

The Operator shall review, in conjunction with the appropriate utility companies, on an annual basis each electric service to determine if it is billed under the most cost beneficial electric tariff available. The Operator shall re-negotiate the service tariffs for any services that are not on the best tariff to receive electric service under the most cost-effective tariff, subject to MBTA approval.

The Operator shall scan the energy market environment on a monthly basis to uncover the least expensive commodity prices available and secure such commodity if it proves to be both reliable and adequate.

The Operator shall work with utilities and energy service companies to audit energy end-uses to implement cost effective load management strategies and electric service consolidations.

The Operator shall work with utilities and energy service companies to audit each energy use at each building, facility and station for the purpose of investigating and implementing energy efficiency measures and equipment that are cost effective. These measures will include, but not be limited to lighting system improvements.

The Operator shall work with utilities and energy service companies to investigate and implement the most cost effective energy conservation measures that are outlined in energy audits.

The Operator shall be responsible for developing a strategy and implementing a program that details the judicious use of switch heaters for minimizing energy consumption without impairing their intended use nor contributing to any service delay.

The Operator shall be responsible for developing a strategy and implementing a program for minimizing energy consumption of layover facility ground power receptacles. This shall be submitted for MBTA review and approval no later than 120 days after NTP (ODRL 3.2-097) and updated annually and included with the annual Engineering Services Plan (ODRL 03-098).

Non-Revenue Vehicles and Work Equipment

The non-revenue vehicles and work equipment include those owned by the MBTA or owned or leased by the Operator as specifically used by the Operator or the MBTA for the provision of the Agreement Services, and as set forth in more detail in the Asset Register. The Operator shall maintain all such non-revenue vehicles and work equipment in Good Working Condition in accordance with the Engineering Services Standards.

The levels of maintenance described herein are not all-inclusive and are intended to provide direction for the Operator to provide quality non-revenue vehicle and work equipment maintenance with the intent to avoid the deferral of maintenance.

All non-revenue vehicles and work equipment used by the Operator shall be maintained in Good Working Condition. Levels of maintenance shall be in accordance with manufacturer’s standard recommended maintenance instructions unless governed by other special conditions (i.e. rental or lease contracts).

Work equipment shall be repaired at the West Cambridge Work Equipment Facility or at other locations subject to prior written approval by the MBTA.

The MBTA reserves the right, at its sole discretion, to use its own or contracted maintenance services for any of the non-revenue vehicles or work equipment.

All non-revenue vehicles and work equipment shall be maintained by the Operator in accordance with all applicable state and federal codes, laws and regulations.

In performing maintenance for non-revenue vehicles, the Operator shall be sensitive to the aspect of public image, including without limitation, the general appearance of the non-revenue vehicles and work equipment. The Operator shall not apply decals, bumper stickers, or other materials not related to the Agreement Services to any surface on non-revenue vehicles and work equipment. The Operator shall remove all such materials immediately upon discovery or notification by the MBTA, including graffiti.

The Operator shall maintain current all appropriate permits, registrations, inspections, certificates, licenses, etc. relating to the operation and maintenance of non-revenue vehicles and work equipment. All non-revenue vehicles and work equipment used by the Operator or MBTA shall be properly registered. Registrations shall be made with the appropriate local, state and/or federal governing agency and maintained current at all times. The Operator shall provide, and keep up-to-date at all times, inspection stickers of all vehicles.

The MBTA reserves the right, at its sole discretion, to direct the Operator to perform any emergency or safety-sensitive maintenance or repairs to any non-revenue vehicle or work equipment unit.

The Operator shall perform annual non-revenue vehicle and work equipment inspections. The inspections shall be documented using a standardized inspection form (ODRL 3.2-099) and be performed by the Operator’s equipment and/or automotive engineer with an MBTA representative. The results of the inspection shall be entered into the Commuter Rail IT Environment. The template for this inspection form shall be submitted to the MBTA no later than 120 days after NTP.

Non-revenue vehicles shall be washed inside and outside monthly, or more frequently as directed by the MBTA, by private local businesses licensed and permitted for such activity.

Any Operator Personnel involved in three or more accidents in any three year period in MBTA-owned non-revenue vehicles shall be barred from driving such vehicles.

The Operator shall provide to the MBTA an annual fuel (diesel and gasoline) usage audit report (ODRL 3.2-100) covering any and all maintenance of way fueling stations and Operator issued fuel credit cards. The report shall indicate monthly consumption information by fuel type, vehicle number, and average miles per gallon, vehicle operator, and location of fueling operation, gallons filled during each transaction. The Operator, within 90 days of NTP, shall submit an initial report form to the MBTA for approval (ODRL 3.2-101).

All Operator Personnel who operate specialized non-revenue vehicles shall be properly licensed.

All Operator truck drivers shall have a hoisting-engineers license valid for the operation of the hoisting equipment that may be attached to the equipment to which they may be assigned.

The Operator shall perform at least a yearly review of operator’s licenses’ to ensure that MBTA equipment is only operated by appropriately licensed individuals. This requirement includes drivers, hoisting, and any other licenses that may be required by state law to operate equipment. A copy of said review shall be submitted to the MBTA for its records (ODRL 3.2-102).

SNOW REMOVAL

The Operator is responsible for snow removal, sanding, and salting operations at all locations on the Service Property, exclusive of locations where these operations are performed pursuant to contracts with Third Parties, by municipalities or by the MBTA. The Operator shall plan for and react quickly to remove ice and snow from traveled areas to keep users of the Service Property safe and minimize liability to the MBTA and the Operator.

The Operator shall establish and provide a snow removal plan to the MBTA for approval no later than Labor Day of each Agreement Year (ODRL 3.2-103). The plan shall identify labor, equipment, materials, management, repair facilities, chronological station assignments, initial starting points, back-up contractors, important names and phone numbers, and preseason activities. The plan shall include a strategy for effectively utilizing the Operator’s labor resources during storm events. The plan shall also identify responsibilities in Transportation, Mechanical, and Customer Service areas. All preseason activities shall be performed by November 15th of each Agreement Year.

By November 15th of each Agreement Year, the labor forces assigned to clean station platforms shall have shovels, brooms, pushers, snow blowers, gas, oil, sand, and salt stored at all locations. Labor forces assigned to draw and swing span bridges shall be equipped with brooms, shovels, salt and sand. The Operator shall submit to the MBTA a completed pre-season checklist and status report including, but not limited to, the above items, by September 15th (ODRL 3.2-104) of each Agreement Year and updated at least monthly through the winter season. This material shall be treated as Critical Material as provided by Section 1.7, 1.8 and 1.9 of Schedule 3.4 (Materials Management and Procurement).

A storm-specific plan shall be discussed and submitted prior to the start of every snowfall (ODRL 3.2-105). During the execution of the storm-specific plan, all available personnel and equipment resources shall be deployed with safety and passenger convenience as the primary considerations. The storm specific plan shall also take into consideration Operator Personnel fatigue.

The Operator shall perform as much snow removal as possible with maintenance employees who are involved in providing the Agreement Services on a full-time basis.

The Operator shall keep all platforms, walkways, ramps and parking areas clear of ice and snow. The Operator shall conduct snow removal from all building, facility, station and parking lot areas not the responsibility of Third Parties. This work will be compliant with all federal, state and local accessibility laws and regulations.

The Operator shall inspect and oversee snow removal work performed by Third Parties, to keep users of the Service Property safe and minimize liability to the MBTA and the Operator. The Operator shall notify the MBTA if a Third Party fails to perform snow removal duties. The Operator shall coordinate and cooperate with the MBTA Real Estate Department for issues involving snow removal with a Third Party to ensure that all parking lots are usable for Commuter Rail customers.

Snow removal shall begin no later than when a snowfall of two inches has accumulated when any storm forecast projects an accumulation of more than four inches or when icy conditions on streets and walkways require sanding or salting. Snow removal shall continue uninterrupted until snow removal is complete.

The Operator shall remove snow from platforms, sidewalks, roadways, parking spaces, auxiliary areas, and any area where snow poses a safety risk to Customers, Operator Personnel, or the general public. This work shall be scheduled when possible such that these areas are completely cleared of snow prior to the beginning of the next rush hour.

Snowstorms forecast to be less than four inches shall be addressed for safety concerns immediately, but may otherwise await daylight for the complete snow removal effort.

The Operator is encouraged to manage deployment of personnel to maximize the alertness of snow removal personnel.

In the event conditions change during the storm, the Operator shall be prepared to address a storm event of greater than four inches without incurring a significant delay or safety hazard. Ice and freezing rain reports shall be addressed immediately and shall also be actively inspected for such conditions. Repeated and continued due diligence by the Operator shall be required to satisfactorily prevent an unsafe or hazardous condition from developing.

The Operator shall consult with and take direction from the Senior Director or his or her designee when there are conflicting weather forecasts.

Sand and/or chemicals shall be applied in the manner and quantities stipulated in the Operator’s snow removal plan. At all times, application of these materials shall be performed in accordance with all applicable laws, rules and regulations. At no time shall salt or salt-based chemicals be applied to any concrete surface in quantities that will cause damage to the concrete surface.

Ice melting agents shall always be applied by the Operator immediately following each snow removal "pass" and when slippery conditions are anticipated.

When snow piles reach a level that restricts parking or interferes with pedestrian traffic, snow removal operations shall be implemented by the Operator.

The Operator shall plan for and react quickly to remove ice and snow from all Pedestrian Structures and traveled areas to keep users of the Service Property safe and minimize liability to the MBTA and the Operator.

Bridge tenders shall ensure drawbridges are in operable condition at all times.

The Operator shall perform snow removal activities so that layover facilities are accessible at all times.

The Operator shall remove snow and ice from track and switches to allow for the safe and unimpeded passage of trains and to ensure service is provided and available at all scheduled times.

The Operator shall develop and implement operating rules and procedures for on-track snow plows to efficiently and safely remove snow from tracks without causing damage to track structure, wayside infrastructure or grade crossings.

The Operator shall control ice buildup in tunnels during the winter months so as not to interfere with tunnel clearance and the safe movement of trains.

Emergency escape hatches associated with tunnels must be kept clear of snow. Measures must be taken to assure that these hatches never freeze. Weekly inspections and testing must be conducted and documented as directed by the MBTA in the Commuter Rail IT Environment to assure that snow and ice are not interfering with proper hatch operation.

All fire protection standpipes at street level and corridor level shall be cleared of snow by the Operator immediately following a snowstorm.

Within 48 hours of a major winter storm or as directed by the MBTA, the MBTA Chiefs of Transportation, Mechanical and Engineering shall meet with their Operator counterparts, and evaluate the level of service attained during the storm.

Planning for improvements and correction of any deficiencies will commence at this time. The MBTA may prescribe special instructions to implement improvements or corrective actions.

The Operator shall provide a post-storm fitness report (ODRL 3.2-106) identifying any damage encountered and the general condition of the Service Property.

All damages to parking areas caused by snowplowing shall be repaired by the Operator as soon as possible and not later than May 1st of each Agreement Year.

OTHER ENGINEERING SERVICES

The Operator shall provide other engineering services as may be required for the performance of the Agreement Services. These engineering services may include surveys, design, development of plans, layouts, sketches, pictures, staging and phasing plans, and other engineering functions that are normally required in the operation and maintenance of a railroad. Unless otherwise stated, these services are to be included in the Annual Fee.

The Operator shall assist the MBTA, as requested, with engineering services related to Service Property licenses and easements, including plan preparation.

The Operator shall maintain files and provide copies of all Service Property construction and valuation plans for the Service Property maintained pursuant to this Agreement and that are currently in the control of the Operator. For any new work performed on or within the Service Property, the Operator shall provide the MBTA with a complete set of updated plans and/or documents in electronic and hard copy formats within 30 days following completion of the work. The Operator shall provide plans as necessary for control of encroachments. The Operator shall provide testimony and work with MBTA lawyers to control encroachments.

The Operator shall provide drafting services for property maintenance, presentation documents for the MBTA, and support capital acquisition appropriation requests or as otherwise requested by the MBTA.

The Operator shall provide inspection and testing of track and signal systems before placing or restoring these systems to service following an Operator outage. The Operator shall further ensure the safety compliance of all work done on the Service Property resulting from Third Party work.

The Operator shall comply with all MBTA Standard Plans, material specifications, design criteria, work practices and methods, and use only MBTA-approved materials in performing the Agreement Services and in designing modifications, improvements or additions to the Service Property.

The Operator shall provide all disciplines of engineering from its own staff or subcontracted consultants to properly inspect, maintain, design, engineer, review or to professionally ensure that the Service Property is maintained pursuant to this Agreement is kept safe and properly maintained and constructed.

The MBTA shall issue all Service Property licenses and easements to Third Parties, as deemed appropriate by the MBTA. The Operator shall not have the authority to issue Service Property licenses and easements to Third Parties. The Operator shall update the plans for the Service Property to include such licenses and easements.

The Operator shall provide engineering reviews of plans and specifications submitted by or on behalf of Third Parties and shall arrange for reimbursement of expenses incurred in its services from such Third Parties.

Consistent with Schedule 3.11 (Construction Support Including PTC), the Operator shall provide engineering reviews for MBTA Construction Directorate projects unless the Operator is directed otherwise.

The Operator shall provide all survey services for maintenance and property control. Any plans requiring certification shall be certified by a Registered Surveyor licensed in the Commonwealth of Massachusetts at no additional cost to the MBTA.

The Operator shall investigate, respond to and attempt to resolve complaints and problems on and along the Service Property that result from the performance of the Agreement Services.

The Operator shall make available to MBTA sufficient personnel that are qualified and authorized by the Operator to support the MBTA and/or Other Contractors for Supplemental Work.

The Operator shall provide up to four employees, of the classifications as requested from time to time by the MBTA, at no additional cost to the MBTA. Each of the above provided employees shall work at the direction of the MBTA.

The Operator shall provide all flagging services required to support bridge work performed by Other Contractors or Third Parties or otherwise on the Service Property, including the Attleboro Line upon direction by the MBTA. Flagging services described in this Section 9 (Other Engineering Services) to this Schedule 3.2 (Engineering Services) shall be compensated pursuant to direct agreements with such other Contractors or Third Parties.

The Operator shall ascertain any and all railroad construction and maintenance requirements for fiber optic companies, utilities and other Third Party occupants of the Service Property and comply with such requirements. MBTA Real Estate shall provide copies of agreements upon request by the Operator.

The Operator shall provide three (3) dedicated and qualified employees who shall operate CADD equipment on a full time basis, to convert as many existing MBTA plans as possible to CADD drawings each Agreement Year. The MBTA shall establish the priority order for the existing plans to be converted to CADD.

The Operator shall scan and create an electronic index of at least 10,000 drawings per Agreement Year. The priority order for scanning shall be determined by the MBTA. The Operator shall create a complete set of “as-built” plans in the Commuter Rail IT Environment.

Existing "as-built" plans shall be maintained in accordance with FRA regulations at all times. Once plans are created in or converted to electronic CADD format, they shall be maintained without "mark ups" in a 100% correct and accurate state.

All CADD work shall utilize the latest version of CADD software compatible with MBTA software.

Electronic copies of any new or updated CADD files shall be forwarded to the MBTA so as to keep the MBTA set of plans current at all times.

The Operator shall staff and operate the Plan Room located at 32 Cobble Hill Road, 1st Floor Rear; Somerville, MA 02143 with qualified staff, subject to the approval of the MBTA Chief Engineer. Plan Room duties include, without limitation, neat and orderly storage of plans, protecting plans from damage, controlling access to Third Parties, plan copying, safe and appropriate handling of plans, Third Party billing, and cataloguing of new and updated plans. Failure of Plan Room staff to perform their duties may be deemed Conduct Unbecoming an Employee.

WRECK CLEARING

General. Operator shall clear wrecks that involve MBTA trains and restore to operation all affected Agreement Services.

Specific Other Wrecks. The MBTA may direct Operator to assist in clearing wrecks involving a foreign railroad operating on MBTA property or other MBTA agency. The respective rights and obligations of the foreign railroad and the MBTA shall be governed by the terms and conditions of agreements, if any, between the MBTA and that railroad. Operator shall be responsible for coordinating with the dispatching railroad where a wreck occurs on territory dispatched by a Third Party.

WIND TURBINES

The Operator will operate and maintain the 100 KW wind turbine currently located in Kingston, MA adjacent to the Kingston Layover.

The Operator will operate and maintain the newly built wind turbine located on the Commuter Rail right of way directly adjacent to Titicot grade crossing in Bridgewater.

Both the Kingston and the Bridgewater wind turbines will be operated and maintained pursuant to the O&M Manual provided by the applicable manufacturer of the wind turbine.

MBTA Engineering Repair option

Notwithstanding anything to the contrary and in addition to the MBTA's other rights and remedies, should the Operator fail to timely make any repairs, make any replacements or otherwise service or maintain the Service Property (collectively, "Required Work") as required in this Schedule 3.2 (Engineering Services), the MBTA shall have the option of either performing the Required Work itself or engaging a Third Party to perform the Required Work (the "MBTA Engineering Repair Option").  The MBTA shall provide the Operator with three (3) days' prior notice of its election to perform an MBTA Engineering Repair Option so as to afford the Operator a final opportunity to agree to perform the Required Work.  Should the Operator refuse to perform the Required Work or fail to respond to the MBTA, then the MBTA shall have the right to set off (pursuant to Section 47 (Set Off) of