Petroleum Development Oman LLC Version: 2.0 Effective Oct. 2017 Page
15 Specification for Construction Activities on Oil, Gas and Utility Facilities Projects Version: 2.0 Effective Oct. The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED. equipment preservation and maintenance instructions issued by Vendors and as per Minimum Preservation Requirements.
3.3 Construction Consumables and Materials Contractor shall supply
all construction consumables, testing materials and tools required for performance and completion of the Work, unless specific items are expressly stated as being supplied by Company or other contractors. Contractor shall
also supply all consumables, testing materials and tools required for performance and completion of the prefabrication and fabrication activities identified as part of Contractor’s scope of Work.
3.4 Scaffolding and Staging The
Contractor shall provide, install and take down all necessary scaffolding and staging required for the execution of the Work. Scaffolding and staging shall comply with SP - HSE Specification – Scaffolding, Working
at Heights or Over Water, Lifting Operations and Earthworks and GU – Guidelines for the Use of Scaffolding. The Contractor shall have a dedicated Scaffolding Supervisor onsite to oversee all scaffolding works and ensure that all scaffolding meets The Company approval before use.