Oil Tanker Construction
Ventilation and gas-freeing
Download
1.08 Mb.
Page
32/60
Date
16.12.2020
Size
1.08 Mb.
#54495
1
...
28
29
30
31
32
33
34
35
...
60
155646687-Oil-Tanker-Construction-Rules
Ventilation
and gas-freeing
Where the venting arrangements of more than one tank are connected
to a vent header system
, a shut-off device is to be provided at each tank.
Where
stop valves are used
, they shall be provided with locking arrangements.
When shut-off
devices according are provided
, cargo tanks are to be protected against excessive positive and negative pressures caused by thermal variations by means of Pressure/vacuum relief devices.
Venting arrangements are to be connected to the top of each
cargo tank in such a way that
, under normal
conditions of trim and list
, they are self-draining into the cargo tanks.
Where a self-draining
arrangement is impossible
, permanently installed means for draining the vent lines to a cargo tank shall be provided.
Download
1.08 Mb.
Share with your friends:
1
...
28
29
30
31
32
33
34
35
...
60
The database is protected by copyright ©ininet.org 2024
send message
Main page
atmospheric pressure