Nat doc 001 Guidance and Information Material Concerning



Download 0.84 Mb.
View original pdf
Page62/103
Date22.11.2021
Size0.84 Mb.
#57747
1   ...   58   59   60   61   62   63   64   65   ...   103
icao nat doc 001 air navigation north atlantic
4.6
RVSM Approval
4.6.1
In the same manner that the MNPS approval process includes a number of operational type requirements as well as an equipment certification process to be considered for RVSM approval, not only must the individual aircraft of an Operator’s fleet be compliant with the RVSM MASPS but also the Operator has to ensure that crews have been trained in procedures specific for operation in RVSM Airspace, as defined in the ICAO “Regional Supplementary Procedures”, (Doc.7030). In this respect, like MNPS approval, RVSM approval comprises two elements airworthiness certification and operational scrutiny. It should be noted that an RVSM approval for the NAT will always include an MNPS approval and this will be valid for global RVSM operations. However, such a dependency will not be the case from circa January
2002 (see relevant statements at the beginning of this Part of the guidance material.

Download 0.84 Mb.

Share with your friends:
1   ...   58   59   60   61   62   63   64   65   ...   103




The database is protected by copyright ©ininet.org 2024
send message

    Main page