Fifth edition Alnoor Bhimani Charles T. Horngren Srikant M. Datar Madhav V. Rajan Farah Ahamed



Download 1.72 Mb.
View original pdf
Page180/469
Date01.12.2021
Size1.72 Mb.
#57828
1   ...   176   177   178   179   180   181   182   183   ...   469
solutions-manual-to-bhimani-et-al-management-and-cost-accounting-pearson-2012-1
Difference in breakeven points
Contract A has a higher fixed cost and a lower variable cost per sales euro. In contrast, Contract B has a lower fixed cost and a higher variable cost per sales euro. In Contract B, there is risk sharing between Espasso and Vieira, Moura and Rebello that lowers the breakeven point, but results in Espasso receiving less operating income if Tornado 2 is a mega-success.
2
Revenues, 0.625 × €300,000,000
€187,500,000 Variable costs, 0.40 × €187,500,000 75,000,000
Contribution margin
112,500,000 Fixed costs
24,000,000 Operating income
€ 88,500,000
Tornado 2
has a higher breakeven point than Tornado due to having a higher level of fixed costs and a lower unit contribution margin.

Download 1.72 Mb.

Share with your friends:
1   ...   176   177   178   179   180   181   182   183   ...   469




The database is protected by copyright ©ininet.org 2024
send message

    Main page