PTW Assessment Preparation
58- What are the Duties for Permit Applicant
Fill up the application Prepare Job Safety Plan Prepare Certificates Appoint the Permit Holder Visit the site in case of Class A permit Brief the permit holder Get the signature from other effected custodian Ensure the permit is cancel after completion Get the signature of Responsible Supervisor Forward the list of permits required validation for the next day by Hrs to Responsible Supervisor


13

59- What are the Duties for Responsible Supervisor
Review the Permit HSE Plan & certificates. Visit the site in case of Class "A" Permit along with Area Authority & Permit Applicant. Check and agree with scope. Authorize the permit Forward the list of the permit required for the next day to Area Authority. Authorize the isolation if required Approve pre validation if required Track all permit for conflicting activities Archive the completion Permit.
60- What are the Duties for Area Authority
Validate Class A and Class "B" permits before work starts. Get the approval from Responsible Supervisor for daily validation. Before validation visit & inspect the site. Review all HSE Plan attached to the permit Conduct the first gas test each day fora Class "A" Permit. Prepare of site isolation. Monitor all the equipment and machine as per HSE Plan. Cancel the permit for safety reason or incompletion work. Check for conflicting of activity.
61- How many types of areas are therein PDO? There are three types of areas, Process Facilities, Hydrocarbon & non-
Hydrocarbon
62- What is Process Facility
Area within the boundary fence of any hydrocarbon processing facilities. Including Gathering and pumping stations. Also, Storage and processing areas and the well locations (when the well is live)
63- What are Hydrocarbon areas
"Area outside the boundary fence" of process facility where hydrocarbon is present.
- Area within 10 meters of gas pipeline.
- Area within 25 meters of main Oil lines
- Area within 50 meters around flowline which has flanged joint.
- 50 meters area outside the boundary fence of process facility
- 50 meters around well pad.
- Area within 100 meters around drilling Rig.