10
2.4 Flood Protection Measures Flood protection measures
as stipulated under Clauses b, band shall comply with the following requirements, including those stipulated in Clause 13 and Appendix 2: a) General Development Flood protection measures shall be provided
at all points of entry, exit and all openings including windows, ventilation and services openings) for the building premises (at ground/platform level. b)
Industrial/Institutional/Commercial/Multi-Unit
Residential Developments, Special Facilities and Developments with Director Indirect Linkages to Underground Special
Facilities
Flood protection measures shall be provided at i)
At all points of entry, exit and all openings (including windows, ventilation and services openings) for the building premises (at ground/platform level or ii) All points of entry and exit for the entire development area. c) The developer/owner shall obtain the necessary clearance from relevant authorities to install the flood protection measures during the Development Control (DC) stage for approval. d) Details of the flood protection measures and Standard Operating Procedure (SOP) should be submitted to the Board during Detailed Plan (DP) stage for record.
Share with your friends: