Petroleum Development Oman LLC Version: 2.0 Effective Oct. 2017 Page
16 Specification for Construction Activities on Oil, Gas and Utility Facilities Projects Version: 2.0 Effective Oct. The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
3. Delivery times for critical materials shall be indicated separately on the Schedule
4. Possible constraints on the construction Schedule imposed by any Competent Authority or any other requirements such
as permit to work constraints, holidays.
5. Contractor shall conduct its Work in accordance with documented plans and procedures. These plans and procedures shall address, but not be limited to,
the following activities Contract Execution Plan (CEP)
Contract Quality Plan (CQP)
Procurement Management Plan
Hydrotest plan
Contract Work Plan &
Programme Information Management plan
Contract Health, Safety &
Environmental Management Plan Contract Materials Handling Plan (including Logistic Plan & Materials Receipt Procedure)
Construction Management Plan (part of CEP)
SAP Data
Interface Management Plan
6. Contractor shall manage the
interfaces between Contractor, Company, Subcontractors, Other contractors and any other entities connected with the Work.