Petroleum Development Oman LLC Version: 2.0 Effective Oct. 2017 Page
19 Specification for Construction Activities on Oil, Gas and Utility Facilities Projects Version: 2.0 Effective Oct. The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED. On achievement of Mechanical Completion and clearing of the Category A punch list items,
Pre-Commissioning B scope activities shall then commence.
3.13.2
Pre-Commissioning Contractor is responsible for undertaking all B scope Pre-Commissioning activities after A scope Mechanical Completion.
Pre-Commissioning activities typically require equipment
or systems to be energised, but do not require the introduction of process fluids. Contractor shall be responsible for providing, but not limited to the following-
All consumables, test equipment and tools required for all Pre-
Commissioning activities
Temporary electrical power supplies for
Pre-Commissioning activities Vendor call-offs to support Pre-Commissioning activities as applicable.