SP-2050
Reference Documents
The following documents should be used as reference in conjunction with the above section to realise the project as defined in the Tender Documents, for the Civil discipline


Petroleum Development Oman LLC
Version: 2.0 Effective Oct. 2017 Page 21
Specification for Construction Activities on Oil, Gas and
Utility Facilities Projects
Version: 2.0 Effective Oct. The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED. GU Civil & Building Standard Drawing GU GU SP Application and Selection of Standard Pipe Supports. Guideline for Sunshade – Specification – Design requirement & standard drawings. Specification for Transportatble Accommodation Units. SP Specification for Civil & Building Construction. SP Specification for Reinforced Concrete - Production & Construction Guidelines. SP Specification for Heating, Ventilation and Air-Conditioning (HVAC). SP Building Services Specifications.
DEP.31.76.10.10 Heating, Ventilation and Air Conditioning for Plant Buildings.


Petroleum Development Oman LLC
Version: 2.0 Effective Oct. 2017 Page 22
Specification for Construction Activities on Oil, Gas and
Utility Facilities Projects
Version: 2.0 Effective Oct. The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
5
Mechanical Works
5.1
Piping
Contractor shall be responsible for the complete pre-construction survey, construction engineering, Material receiving, handling, transportation, storage, protection, colour coding, identification, fabrication, installation, alignment of piping, testing, flushing, cleaning, drying, purging, pickiling, NDT, inspection, PWHT, and bringing it to a state of mechanical and Pre-Commissioning completion in accordance with the Technical Information and in accordance with Contract specifications and good working practices. The contractor shall complete all mechanical and pipe Works required including but not limited to below
Fabrication, erection, testing and Pre-Commissioning of all Equipment and connected piping as per approved Project documents.
 Preparation and qualification of all relevant welding procedures PQRs, WPSs and WPQ/welder qualification tests.
 Fabrication and installation of on plot and off plot piping including valves, safety relief valves, suction strainers, etc. and any other piping special item.
 Carrying out NDT as per Company specification and relevant Project specifications and Hydro-testing of piping as per approved AFC drawings.