Prequalification questionnaire



Download 254.83 Kb.
Page4/4
Date17.10.2016
Size254.83 Kb.
#231
1   2   3   4

10.0

Equipment

10.1

Press Brake Capacity: (metric tons)

Mobil Cranes: (Qty) (capacity in metric tons)

Fork Lifts: (Qty) (capacity in metric tons)

Welding Machines: (Qty)



Welding Machines in Process

Quantity

Vendor Preferred Process

Shielded Metal Arch Welding (SMAW)







Gas Metal Arc Welding (GMAW)







Flux Cored Arc Welding (FCAW)







Submerged Arc Welding (SAW)







Automatic Gas Tungsten Arc Welding (GTAW)







Oxy Acetylene Arc Welding (OCAW)







Plasma Arc Welding (PAW)







Gas Tungsten Arc Welding (GTAW)


















11.0

Non-Destructive Examination

11.1

Non-Destructive Examination (NDE) Methods Used:


Method

Not Used

In-House

Sub-Contracted

ASNT Certified

Radiography (x-ray)













Radiography (Isotope)













Liquid Penetrant (Solvent Removable)













Liquid Penetrant (Water Washable)













Magnetic Particle (DC Prod)













Magnetic Particle (AC Yoke)













Fluorescent Magnetic Particle













Ultrasonic (Shear Wave)













Ultrasonic (Thickness Measurement)













Eddy Current Testing













Sensitive Leak Testing













Acoustic Emission Testing






























12.0

Drilling Equipment Package Particulars

12.1

Are you able to provide the following software based support services that can be implemented worldwide;

  • Engineering software and support.

  • Software based design change notification process.

  • Software based failure analysis and reporting system.

  • Software based lessons learned system/database.

  • Software based preventive maintenance program.



12.2

Are you able to provide a computerized data collection system that will be required on the rig to provide a data record of each cement job, pressure test and leak-off test, including ability to feed the data through a serial data link in real time to the Mud Logging Contractor?

13.0

Compatibility Assessment

13.1

Compatibility assessment with proposed WHP systems & infrastructure (power, ESD, space/layout etc.);

13.2

Compatibility assessment with any relevant Canadian regulatory requirements (or codes/standards that Canada links to.  Examples: crane capabilities, BOP specs etc.);

13.3

Suitability for WHP well work (ERD, completions, interventions etc.);

13.4

Proactive gathering of operational input (e.g. from maintenance specialists, candidate drilling contractors etc

14.0

Other Capabilities or Services

14.1

List other Capabilities or Services:

15.0

Canada-Newfoundland and Labrador Benefits Compliance



Husky Energy strongly supports providing opportunities to Canadian and in particular Newfoundland and Labrador companies and individuals, on a commercially competitive basis. Pre-qualified companies will be required to complete a Canada/Newfoundland and Labrador Benefit Questionnaire. Will you comply with requirements of Husky Energy (or any governmental authority) with respect to benefits and with all applicable guidelines of Husky Energy?




Yes



No









































Page of



Download 254.83 Kb.

Share with your friends:
1   2   3   4




The database is protected by copyright ©ininet.org 2024
send message

    Main page