Project Plan Rev. 1 Page Project Bluebird



Download 0.53 Mb.
Page3/5
Date20.05.2018
Size0.53 Mb.
#50110
1   2   3   4   5

EMI noise from Vehicle:


Electromagnetic interference will be emitted in the vehicle’s power supply and will need to be regulated with a power regulator. This is expected to be adequate to remove most noise but it could possibly still be a problem.

Accelerometer does not Work Correctly:


Accelerometer could possibly pick up noise from vibration that could skew results. Noise is expected to be small in comparison to lateral forces produced by cornering.

Formula SAE Car not Completed:


Formula SAE car might not be completed due to a problem with the project. This is not expected to be a problem because the Formula SAE Project is on schedule and critical parts and funding have been secured.

Environmental Concerns:


Temperature and shock from environment could possibly damage the device or corrupt data. Parts have been selected to withstand environmental conditions harsher then what is expected so this is a low risk.

Schedule


The following section displays and discusses the schedule for Project Swift Fox.



Download 0.53 Mb.

Share with your friends:
1   2   3   4   5




The database is protected by copyright ©ininet.org 2024
send message

    Main page