Note: See next page for continuation of Prices
PRICE PAGE Continued
BASE BID Continued
|
ITEM NO.
|
WORK ITEM DESCRIPTION
|
ESTIMATED
QUANTITY
|
UNIT PRICE IN NUMBERS
|
TOTAL PRICE PER ITEM
|
D-751.18
|
PRECAST MANHOLE TEE AT 84"
|
1 EACH
|
$
|
$
|
D-751.19
|
JUNCTION MANHOLE AT 84"
|
1 EACH
|
$
|
$
|
D-752.1
|
REMOVE EXISTING END SECTION (84" RCP)
|
1 EACH
|
$
|
$
|
D-752.2
|
END SECTION, 12" DIAMETER, AS SPECIFIED INCLUDING RIP RAP
|
2 EACH
|
$
|
$
|
D-752.3
|
HEAD WALL, 84" INCLUDING BAR SCREEN
|
1 EACH
|
$
|
$
|
L-101.1
|
APRON AREA LIGHTING POWER DISTRIBUTION AND CONTROL SYSTEMS
|
1 LSUM
|
$
|
$
|
L-105.1
|
REMOVAL OF EXISTING RUNWAY/TAXIWAY EDGE LIGHTS
|
149 EACH
|
$
|
$
|
L-105.2
|
REMOVE AND RESET EXISTING BASE MOUNTED EDGE LIGHT
|
8 EACH
|
$
|
$
|
L-105.4
|
REMOVAL OF EXISTING GUIDANCE SIGNS
|
22 EACH
|
$
|
$
|
L-105.5
|
REMOVAL OF EXISTING GUIDANCE SIGN BASE
|
3 EACH
|
$
|
$
|
L-105.6
|
REMOVAL OF EXISTING ELECTRICAL SPLICE CAN
|
5 EACH
|
$
|
$
|
L-105.7
|
REMOVAL OF EXISTING ELECTRICAL VAULT / MANHOLE
|
8 EACH
|
$
|
$
|
L-105.8
|
DEMOLITION / REMOVAL OF EXISTING MALSR AND ILS EQUIPMENT
|
1 LSUM
|
$
|
$
|
L-105.9
|
DEMOLITION / REMOVAL OF EXISTING RUNWAY 23L LOCALIZER SHELTER
|
1 LSUM
|
$
|
$
|
L-105.10
|
DEMOLITION / REMOVAL OF EXISTING RUNWAY 5R MALSR SHELTER
|
1 LSUM
|
$
|
$
|
L-105.11
|
REMOVAL OF EXISTING AIRFIELD CONCRETE ENCASED ELECTRICAL DUCT
|
1505 LFT
|
$
|
$
|
L-105.12
|
REMOVAL OF OVERHEAD ELECTRICAL LINES AND POLES
|
1 LSUM
|
$
|
$
|
L-105.13
|
REMOVAL OF EXISTING TELEPHONE RISER
|
1 EACH
|
$
|
$
|
L-105.14
|
REMOVAL OF EXISTING LIGHTING CIRCUIT CABLES
|
1 LSUM
|
$
|
$
|
L-108.1
|
NO. 6 AWG, 5KV, 1/C AIRPORT LIGHTING CABLE
|
31570 LFT
|
$
|
$
|
L-108.2
|
NO. 6 AWG BARE COPPER COUNTERPOISE WIRE
|
11520 LFT
|
$
|
$
|
L-108.3
|
NO. 2 AWG, 15 KV COPPER PRIMARY UD CABLE WITH 133% INSULATION AND COPPER CONCENTRIC NEUTRAL
|
5475 LFT
|
$
|
$
|
L-108.4
|
FAA CONTROL CABLE IN DUCT, 25 PAIR, 600V
|
2800 LFT
|
$
|
$
|
Note: See next page for continuation of Prices
PRICE PAGE Continued
BASE BID Continued
|
ITEM NO.
|
WORK ITEM DESCRIPTION
|
ESTIMATED
QUANTITY
|
UNIT PRICE IN NUMBERS
|
TOTAL PRICE PER ITEM
|
L-108.5
|
FAA CONTROL CABLE IN DUCT, 50 PAIR, 600V
|
6900 LFT
|
$
|
$
|
L-108.6
|
FAA ELECTRIC SERVICE CABLE IN DUCT, 3-NO. 6, 5KV
|
6200 LFT
|
$
|
$
|
L-108.7
|
RUNWAY 5R MALSR WIRING
|
1 LSUM
|
$
|
$
|
L-108.8
|
NO. 8, 600V, GROUND WIRE
|
6200 LFT
|
$
|
$
|
L-109.1
|
AIRFIELD ELECTRICAL VAULT & SUBSTATION 2A MODIFICATIONS
|
1 LSUM
|
$
|
$
|
L-110.1
|
2-INCH DIA. PVC CONDUIT (DEB)
|
8030 LFT
|
$
|
$
|
L-110.2
|
3-INCH DIA. PVC CONDUIT (DEB)
|
75 LFT
|
$
|
$
|
L-110.3
|
4-INCH DIA. PVC CONDUIT (DEB)
|
1465 LFT
|
$
|
$
|
L-110.4
|
2 - 2-INCH DIA. PVC CONDUIT (DEB)
|
260 LFT
|
$
|
$
|
L-110.5
|
3 - 2-INCH DIA. PVC CONDUIT (DEB)
|
500 LFT
|
$
|
$
|
L-110.6
|
4 - 2-INCH DIA. PVC CONDUIT (DEB)
|
400 LFT
|
$
|
$
|
L-110.7
|
2 - 3-INCH DIA. PVC CONDUIT (DEB)
|
40 LFT
|
$
|
$
|
L-110.8
|
3 - 3-INCH DIA. PVC CONDUIT (DEB)
|
150 LFT
|
$
|
$
|
L-110.9
|
3 - 4-INCH DIA. PVC CONDUIT (DEB) FAA DUCT
|
3625 LFT
|
$
|
$
|
L-110.10
|
4 - 4-INCH DIA. PVC CONDUIT (DEB) FAA DUCT
|
1200 LFT
|
$
|
$
|
L-110.11
|
6-WAY DUCT BANK, 2-INCH DIA. PVC, CONCRETE ENCASED
|
2965 LFT
|
$
|
$
|
L-110.12
|
2-WAY DUCT BANK, 4-INCH DIA. PVC, CONCRETE ENCASED
|
110 LFT
|
$
|
$
|
L-110.13
|
4-WAY DUCT BANK, 4-INCH DIA. PVC, CONCRETE ENCASED
|
50 LFT
|
$
|
$
|
L-110.14
|
6-WAY DUCT BANK, 4-INCH DIA. PVC, CONCRETE ENCASED
|
820 LFT
|
$
|
$
|
L-113.1
|
2-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
570 LFT
|
$
|
$
|
L-113.2
|
2 - 2-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
470 LFT
|
$
|
$
|
L-113.3
|
3 - 4-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
600 LFT
|
$
|
$
|
L-113.4
|
4 - 4-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
185 LFT
|
$
|
$
|
L-113.5
|
6 - 4-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
645 LFT
|
$
|
$
|
L-115.1
|
REMOVE AND LOWER EXISTING ELECTRICAL HANDHOLE
|
2 EACH
|
$
|
$
|
L-115.2
|
ELECTRICAL HANDHOLE
|
11 EACH
|
$
|
$
|
L-115.3
|
MALSR - CONCRETE-ENCASED JUNCTION BOX
|
10 EACH
|
$
|
$
|
Note: See next page for continuation of Prices
PRICE PAGE Continued
BASE BID Continued
|
ITEM NO.
|
WORK ITEM DESCRIPTION
|
ESTIMATED
QUANTITY
|
UNIT PRICE IN NUMBERS
|
TOTAL PRICE PER ITEM
|
L-115.4
|
FAA ELECTRICAL HANDHOLE
|
35 EACH
|
$
|
$
|
L-115.5
|
MODIFICATION OF EXISTING AIRFIELD VAULT #1
|
1 LSUM
|
$
|
$
|
L-115.6
|
MODIFICATION OF EXISTING AIRFIELD VAULT #2
|
1 LSUM
|
$
|
$
|
L-115.7
|
MODIFICATION OF EXISTING AIRFIELD VAULT #3
|
1 LSUM
|
$
|
$
|
L-125.1
|
MEDIUM-INTENSITY TAXIWAY EDGE LIGHTS, BASE MOUNTED, IN TURF
|
59 EACH
|
$
|
$
|
L-125.3
|
HIGH-INTENSITY IN-PAVEMENT RUNWAY EDGE LIGHT, IN EXISTING PAVEMENT
|
1 EACH
|
$
|
$
|
L-125.4
|
HIGH-INTENSITY RUNWAY THRESHOLD LIGHTS, BASE-MOUNTED, IN EXISTNG PAVEMENT
|
16 EACH
|
$
|
$
|
L-125.5
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 1 MODULES
|
5 EACH
|
$
|
$
|
L-125.6
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 2 MODULES
|
1 EACH
|
$
|
$
|
L-125.8
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 4 MODULES
|
2 EACH
|
$
|
$
|
L-125.9
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 7 MODULES
|
2 EACH
|
$
|
$
|
L-125.11
|
WIND CONE SERVICE REVISIONS
|
1 LSUM
|
$
|
$
|
L-128.1
|
REMOVE AND REPLACE GATE AND GATE OPERATOR ON EXISTING FOUNDATION AT GATE W16
|
1 LSUM
|
$
|
$
|
L-128.2
|
REMOVE AND REPLACE GATE AND GATE OPERATOR ON EXISTING FOUNDATION AT GATE S13
|
1 LSUM
|
$
|
$
|
L-128.3
|
MAINTENANCE BUILDING GATE, GATE OPERATOR AND SERVICE
|
1 LSUM
|
$
|
$
|
FAA-GL-918.C.1
|
COMBINED MALSR AND LOCALIZER SHELTER
|
1 LSUM
|
$
|
$
|
FAA-GL-918.C.2
|
RUNWAY 23L LOCALIZER ANTENNA ARRAY WORK
|
1 LSUM
|
$
|
$
|
FAA-GL-918.C.3
|
RUNWAY 5R MALSR WORK
|
1 LSUM
|
$
|
$
|
FAA-GL-918.C.4
|
ENVIRONMENTAL ABATEMENT AND DISPOSAL
|
1 LSUM
|
$
|
$
|
FAA-GL-918.C.5
|
MALSR IN-PAVEMENT THRESHOLD LIGHT IN EXISTING PAVEMENT
|
19 EACH
|
$
|
$
|
T-901.1
|
HYDROSEEDING AND WOOD FIBER MULCH INCLUDING FERTILIZER
|
63.35 ACRE
|
$
|
$
|
T-904.1
|
SODDING, CLASS B
|
1850 SYD
|
$
|
$
|
T-905.1
|
TOPSOIL PLACEMENT
|
26724 CYD
|
$
|
$
|
Note: See next page for continuation of Prices
PRICE PAGE Continued
Total Base Bid Price (In Words)
Dollars
Total Base Bid Price$
Note: See next page for continuation of Prices
PRICE PAGE Continued
ALTERNATE BID
|
ITEM NO.
|
WORK ITEM DESCRIPTION
|
ESTIMATED
QUANTITY
|
UNIT PRICE IN NUMBERS
|
TOTAL PRICE PER ITEM
|
M-101.1
|
MOBILIZATION
|
1 LSUM
|
$
|
$
|
M-102.1
|
SAFETY AND SECURITY
|
1 LSUM
|
$
|
$
|
M-104.1
|
PROJECT SURVEY AND STAKEOUT
|
1 LSUM
|
$
|
$
|
M-106.1
|
PAVEMENT MARKING REMOVAL
|
67700 SFT
|
$
|
$
|
M-107.1
|
REMOVAL OF EXISTING PAVEMENT
|
23150 SYD
|
$
|
$
|
P-108.1
|
COLDMILLING EXISTING PAVEMENT, 2" DEPTH
|
355 SYD
|
$
|
$
|
P-152.1
|
UNCLASSIFIED EXCAVATION
|
70943 CYD
|
$
|
$
|
P-156.2
|
SILT FENCE
|
1380 LFT
|
$
|
$
|
P-156.5
|
LOW POINT INLET FILTER
|
7 EACH
|
$
|
$
|
P-209.2
|
AGGREGATE BASE COURSE FROM OFF-SITE, MATERIAL PROVIDED BY CONTRACTOR
|
3100 CYD
|
$
|
$
|
P-411.1
|
BITUMINOUS SURFACE COURSE, MDOT 4C, WITH BITUMINOUS TACK COAT
|
635 TON
|
$
|
$
|
P-411.2
|
BITUMINOUS LEVELING COURSE, MDOT 3C, WITH BITUMINOUS TACK COAT
|
7900 TON
|
$
|
$
|
P-501.1
|
PORTLAND CEMENT CONCRETE PAVEMENT, 15" THICKNESS
|
15000 SYD
|
$
|
$
|
P-620.1
|
INSTALL BLACK PAVEMENT MARKINGS
|
23190 SFT
|
$
|
$
|
P-620.2
|
INSTALL YELLOW PAVEMENT MARKINGS
|
14610 SFT
|
$
|
$
|
P-620.3
|
INSTALL WHITE PAVEMENT MARKINGS
|
13000 SFT
|
$
|
$
|
P-620.4
|
INSTALL SURFACE PAINTED SIGN MARKINGS
|
6 EACH
|
$
|
$
|
D-701.1
|
REMOVE EXISTING STORM DRAINAGE PIPE (12"-18" DIA.)
|
700 LFT
|
$
|
$
|
D-701.7
|
18", C76, CLASS V RCP
|
842 LFT
|
$
|
$
|
D-701.8
|
24", C76, CLASS V RCP
|
695 LFT
|
$
|
$
|
D-705.1
|
6" UNDERDRAIN W/ GEOTEXTILE FABRIC PIPE WRAP WITH POROUS UNDERDRAIN BACKFILL AND CLEANOUTS AS SPECIFIED
|
4665 LFT
|
$
|
$
|
D-751.1
|
REMOVE EXISTING DRAINAGE STRUCTURE
|
5 EACH
|
$
|
$
|
D-751.7
|
CATCHBASIN, TYPE B, 4' DIAMETER WITH FRAME AND COVER
|
-1 EACH
|
$
|
$ ( )
|
D-751.8
|
MANHOLE, TYPE A, 4' DIAMETER WITH FRAME AND COVER
|
4 EACH
|
$
|
$
|
D-751.13
|
MANHOLE, TYPE A, 6' DIAMETER WITH FRAME AND COVER
|
1 EACH
|
$
|
$
|
D-751.14
|
MANHOLE, TYPE A, 7' DIAMETER WITH FRAME AND COVER
|
2 EACH
|
$
|
$
|
Note: See next page for continuation of Prices
ALTERNATE BID Continued
|
ITEM NO.
|
WORK ITEM DESCRIPTION
|
ESTIMATED
QUANTITY
|
UNIT PRICE IN NUMBERS
|
TOTAL PRICE PER ITEM
|
L-105.1
|
REMOVAL OF EXISTING RUNWAY/TAXIWAY EDGE LIGHTS
|
13 EACH
|
$
|
$
|
L-105.3
|
REMOVE AND REPLACE EDGE LIGHT GLOBES
|
68 EACH
|
$
|
$
|
L-105.4
|
REMOVAL OF EXISTING GUIDANCE SIGNS
|
25 EACH
|
$
|
$
|
L-105.6
|
REMOVAL OF EXISTING ELECTRICAL SPLICE CAN
|
7 EACH
|
$
|
$
|
L-105.7
|
REMOVAL OF EXISTING ELECTRICAL VAULT / MANHOLE
|
2 EACH
|
$
|
$
|
L-105.11
|
REMOVAL OF EXISTING AIRFIELD CONCRETE ENCASED ELECTRICAL DUCT
|
650 LFT
|
$
|
$
|
L-108.1
|
NO. 6 AWG, 5KV, 1/C AIRPORT LIGHTING CABLE
|
9085 LFT
|
$
|
$
|
L-108.2
|
NO. 6 AWG BARE COPPER COUNTERPOISE WIRE
|
2650 LFT
|
$
|
$
|
L-108.4
|
FAA CONTROL CABLE IN DUCT, 25 PAIR, 600V
|
-350 LFT
|
$
|
$ ( )
|
L-108.6
|
FAA ELECTRIC SERVICE CABLE IN DUCT, 3-NO. 6, 5KV
|
-350 LFT
|
$
|
$ ( )
|
L-108.8
|
NO. 8, 600V, GROUND WIRE
|
-350 LFT
|
$
|
$ ( )
|
L-110.1
|
2-INCH DIA. PVC CONDUIT (DEB)
|
2650 LFT
|
$
|
$
|
L-110.4
|
2 - 2-INCH DIA. PVC CONDUIT (DEB)
|
260 LFT
|
$
|
$
|
L-110.9
|
3 - 4-INCH DIA. PVC CONDUIT (DEB) FAA DUCT
|
500 LFT
|
$
|
$
|
L-113.1
|
2-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
-500 LFT
|
$
|
$ ( )
|
L-113.2
|
2 - 2-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
-160 LFT
|
$
|
$ ( )
|
L-113.3
|
3 - 4-INCH DIA. CONDUIT, DIRECTIONALLY DRILLED
|
600 LFT
|
$
|
$
|
L-115.3
|
MALSR - CONCRETE-ENCASED JUNCTION BOX
|
-2 EACH
|
$
|
$ ( )
|
L-115.4
|
FAA ELECTRICAL HANDHOLE
|
-4 EACH
|
$
|
$ ( )
|
L-125.1
|
MEDIUM-INTENSITY TAXIWAY EDGE LIGHTS, BASE MOUNTED, IN TURF
|
22 EACH
|
$
|
$
|
L-125.2
|
HIGH-INTENSITY ELEVATED RUNWAY EDGE, BASE-MOUNTED, IN TURF
|
6 EACH
|
$
|
$
|
L-125.3
|
HIGH-INTENSITY IN-PAVEMENT RUNWAY EDGE LIGHT, IN EXISTING PAVEMENT
|
-1 EACH
|
$
|
$ ( )
| PRICE PAGE Continued
Note: See next page for continuation of Prices
ALTERNATE BID Continued
|
ITEM NO.
|
WORK ITEM DESCRIPTION
|
ESTIMATED
QUANTITY
|
UNIT PRICE IN NUMBERS
|
TOTAL PRICE PER ITEM
|
L-125.4
|
HIGH-INTENSITY RUNWAY THRESHOLD LIGHTS, BASE-MOUNTED, IN EXISTNG PAVEMENT
|
-8 EACH
|
$
|
$ ( )
|
L-125.6
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 2 MODULES
|
10 EACH
|
$
|
$
|
L-125.7
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 3 MODULES
|
2 EACH
|
$
|
$
|
L-125.8
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 4 MODULES
|
4 EACH
|
$
|
$
|
L-125.9
|
TAXI GUIDANCE SIGN, SIZE 3, STYLE 2, 7 MODULES
|
-2 EACH
|
$
|
$ ( )
|
L-125.10
|
REMOVE AND REPLACE EXISTING L-858 GUIDANCE SIGN PANEL
|
8 EACH
|
$
|
$
|
FAA-GL-918.C.5
|
MALSR IN-PAVEMENT THRESHOLD LIGHT IN EXISTING PAVEMENT
|
-19 EACH
|
$
|
$ ( )
|
FAA-GL-918.C.6
|
MALSR ELEVATED THRESHOLD LIGHT IN NEW FOUNDATION
|
19 EACH
|
$
|
$
|
T-901.1
|
HYDROSEEDING AND WOOD FIBER MULCH INCLUDING FERTILIZER
|
16.19 ACRE
|
$
|
$
|
T-904.1
|
SODDING, CLASS B
|
1480 SYD
|
$
|
$
|
T-905.1
|
TOPSOIL PLACEMENT
|
8805 CYD
|
$
|
$
| PRICE PAGE Continued
Total Alternate Bid Price (In Words)
Dollars
Total Alternate Bid Price$
DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION FORM
(for Federally Funded Projects)
Failure to complete this form and/or provide the information requested will result in your Bid being deemed nonresponsive and rejected without any further evaluation.
(Make additional copies if more than two DBE firms are participating.)
-
The Airport Authority has set a goal of seventeen percent (17%) for participation by Disadvantaged Business Enterprises (DBE) for this contract.
-
List the percentage level of DBE Participation your Business Proposes for this contract: %
-
Describe, in detail, the responsibilities of each DBE participant (attach additional sheets, if necessary) (To be counted towards the DBE goal, a firm must be certified by the due date on the cover of this document.)
DBE Name: % of Total Contract:
Address:
Owners/Partners, Principals Name(s):
Detailed Description of Responsibilities:
Is the business certified as a DBE by an agency participating in the Michigan Unified Certification Program (MUCP)? _____ YES _____ NO. Proof of certification must be submitted with this form.
DBE Name: % of Total Contract:
Address:
Owners/Partners, Principals Name(s): Phone #:
Detailed Description of Responsibilities:
Is the business certified as a DBE by an agency participating in the Michigan Unified Certification Program (MUCP)? _____ YES _____ NO. Proof of certification must be submitted with this form.
Include the following (if applicable):
-
The support (financial, technical, management, training, etc.) provided by the Bidder to each DBE partner.
-
A copy of the documents that contain the proposed legal relationship between the Bidder and each DBE participant (if applicable).
-
Provide a resume for the principal(s) of the DBE firms identified above.
For assistance, or for more information on the Airport Authority’s DBE Program or the Michigan Unified Certification Program (MUCP), contact Lori Ballard, Business Diversity Manager, at Lori.Ballard@wcaa.us or (734) 247-7011.
VERIFICATION OF MINIMUM QUALIFICATIONS FORM
Failure to complete this form and/or provide the information requested will result in your Bid being deemed nonresponsive and rejected without any further evaluation.
Describe how you meet or exceed the Minimum Qualifications of the RFB.
a) Provide at least three (3) projects that your Business has successfully managed and successfully completed as the Prime Contractor within the last seven (7) years, as required in the minimum qualifications, that included at least two of the following: (i) 150,000 cubic yards of unclassified excavation; (ii) 7,000 tons of bituminous pavement; and (iii) 15,000 square yards of Portland Cement Concrete (PCC) pavement. The above work could have been self performed or performed by a first tier subcontractor. Attach additional sheets if necessary.
1. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
2. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
VERIFICATION OF MINIMUM QUALIFICATIONS FORM Continued
3. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
-
Provide at least five (5) terminal navigational aid facility installations, that your business or a subcontractor that will be assigned to the contract resulting from this RFB, successfully managed and successfully completed within the last seven (7) years:
1. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed Installation: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
2. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed Installation: Y or N If No, provide subcontractor:
VERIFICATION OF MINIMUM QUALIFICATIONS FORM Continued
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
3. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed Installation: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
4. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed Installation: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
VERIFICATION OF MINIMUM QUALIFICATIONS FORM Continued
5. Client/Owner: ___________________________________________________________
Contact Name: __________________________ Title: ____________________________
Phone Number: ________________________ Date Project Completed: _____________
Self Performed Installation: Y or N If No, provide subcontractor:
Describe Project Scope: ________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
-
List of the Bidder’s staff who is a Project Manager(s) with a minimum of seven (7) years of experience who will be assigned to the project outlined in this RFB, as required in the minimum qualifications. Duplicate below lines if required. Attach resume for each staff listed.
Name: __________________________ Title: ____________________________
Name: __________________________ Title: ____________________________
-
List of the Bidder’s staff who is a Site Superintendent(s) with a minimum of ten (10) years of experience who will be assigned to the project outlined in this RFB, as required in the minimum qualifications. Duplicate below lines if required. Attach resume for each staff listed.
Name: __________________________ Title: ____________________________
Name: __________________________ Title: ____________________________
-
List of the Bidder’s staff, or staff of a subcontractor that will be assigned to the contract resulting from this RFB, who has a minimum of three (3) years of experience installing NAVIAD facility installations for terminal navigational aid facilities, as required in the minimum qualifications. Duplicate below lines if required. Attach resume for each staff listed.
Name: __________________________ Title: ____________________________
Name: __________________________ Title: ____________________________
VERIFICATION OF MINIMUM QUALIFICATIONS FORM Continued
f) List of staff licensed by the State of Michigan according to P.A. 217 of 1956 to perform electrical portions of the work. Duplicate below lines if required. Attach a copy of license for staff listed.
Name: __________________________ Employee of: ____________________________
Name: __________________________ Employee of: ____________________________
SECTION 7 – OTHER FORMS
SECTION 7 – OTHER FORMS 36
BUSINESS INFORMATION QUESTIONNAIRE 37
PROJECT DOCUMENTS DECLARATION FORM 39
BUSINESS INFORMATION QUESTIONNAIRE
Failure to complete this form may result in your Bid being deemed nonresponsive and rejected without any further evaluation.
NAME OF COMPANY
PRINCIPAL OFFICE ADDRESS
TELEPHONE NUMBER
FORM OF OWNERSHIP (Check One)
Corporation ( ) LLC ( ) Joint Venture ( )
State of Incorporation/Registration Date of Incorporation/Registration
Partnership ( ) If Partnership, select one of the following: Limited ( ) or General ( )
Individual ( )
LIST OF PARTNERS, PRINCIPALS, CORPORATE OFFICERS OR OWNERS
Name Title
LIST OF CORPORATE DIRECTORS
Principal Business Affiliation
Name Other Than Proposer Directorship
ADDITIONAL INFORMATION REQUIRED BY THE AUTHORITY
LIST OF PRINCIPAL STOCKHOLDERS (i.e., those holding 5% or more of the outstanding stock)
Name Address
FINANCIAL DISCLOSURE/CONFLICTS OF INTEREST: Identify any contract(s), including any contract involving an employment or consulting relationship, which the firm, or its partners, principals, corporate officers or owners currently has with the Wayne County Airport Authority, or with any of its board members or officers.
LATEST CREDIT RATING (Specify if other than Dun and Bradstreet)
I hereby certify that the foregoing business information is true, correct and complete to the best of (my/our) knowledge and belief:
(Name of Company)
By
(Signature) Date
(Title)
By
(Signature) Date
(Title)
PROJECT DOCUMENTS DECLARATION FORM
Failure to complete this form may result in your Bid being deemed nonresponsive and rejected without any further evaluation.
The undersigned has viewed, purchased or downloaded all project requirements, drawings and specifications issued as part of this RFB and comprehends the scope of the work, schedule and services required to complete the project.
ACKNOWLEDGED BY:
Firm: _______________________________
Print Name________________________________ Title:___________________________________
(Authorized Representative)
Signature:______________________________ Date:__________________________________